SAP ABAP IMG Activity SIMG_CFMENUOPP1_OM0O (Define Evaluation Profile for Range-of-Coverage Data)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PP-MRP-BD (Application Component) Master Data
     MD0C (Package) Customizing R/3 Material Requirements Planning
IMG Activity
ID SIMG_CFMENUOPP1_OM0O Define Evaluation Profile for Range-of-Coverage Data  
Transaction Code S_ACR_23000534   (empty) 
Created on 20060623    
Customizing Attributes SIMG_CFMENUOPP1_OM0O   Define Evaluation Profile for Range-of-Coverage Data 
Customizing Activity SIMG_CFMENUOPP1_OM0O   Define Evaluation Profile for Range-of-Coverage Data 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name SIMG_CFMENUOPP1_OM0O    

Use

In the evaluation profile, you specify the following:

  • Threshold values for stock and receipt days' supplies.

    These threshold values are the material-specific limit values for displaying the traffic-light status (red, yellow, green lights) in the header details on the Ranges of Coverage tab page. You can display the evaluation of the ranges of coverage (days' supplies) in the header details of the MRP list, stock/requirements list, and in the planning results. Here you obtain the information about the current range-of-coverage (days' supply) values of a material. The system compares the current values with the limit values you have defined in the evaluation profile and displays the corresponding traffic lights.

    You assign an evaluation profile to the plant parameters and an MRP group. In this way, you can assign the desired limit values to a certain group of materials.

  • Default period for the creation of the period statistics in the header details of the stock/requirements list and in the MRP list.

    The Period Statistics is a tab page in the header details that lists the receipt and requirement quantities of the near future.

    The default period is then the period applied for the calculation of the period statistics. If, for example, you define Month as the default period, the system calculates the total of the requirements from the current month, the total of the requirements of the next month, and the total of the requirements in the month after next. The same applies to the receipt elements.

You can also adjust the values assigned in the evaluation profile in your current system under the current settings for material requirements planning.

Requirements

Standard settings

Activities

To be able to use the limit values you have defined in an evaluation profile for the range-of-coverage evaluation, proceed as follows:

  1. Create an evaluation profile.
  2. Assign the evaluation profile as follows:
    1. To all materials in a plant via the plant parameters (Customizing for Material Requirements Planning --> Plant Parameters --> Overall Maintenance of Plant Parameters --> Maintain --> Reporting --> Evaluation Profile). This evaluation profile then serves as the default parameter for all materials in the plant.
    2. To the materials of an MRP group via overall maintenance of the MRP groups (Customizing for Material Requirements Planning --> MRP Groups --> Overall Maintenance of MRP Group --> Maintain --> Evaluation Profile). You must then assign the MRP group to the desired materials.
    3. The evaluation profile you have assigned to the MRP group has higher priority and overrides the plant parameters.
  3. In order for the values you have defined in the evaluation profile to then be used for a certain material, you must set the material-specific limit values and save them in the Define Traffic Lights dialog box in the Collective Display of the Stock/Requirements List.
  4. To be able to display the statistical evaluations in the header details, you must use the screen sequences N01 and N02. These screen sequences are set up in a similar way to the screen sequences 001 and 002. The two screen sequences contain the following screens with which you can run comprehensive statistical evaluations based on the evaluation profile.
    • Ranges of coverage (days' supplies)
    • Stocks
    • Period statistics
    • Statistics 2

      To be able to show these screens as tab pages in the header details, you must proceed as follows:

    • Check the new screen sequences N01 and N02 in the IMG activity Define Screen Sequence Header Details in Customizing for Material Requirements Planning You can also use the two screen sequences as a template when defining your own screen sequences.
    • You must now assign one of the two new screen sequences to the MRP type used in the IMG activity Check MRP Type in Customizing. In this way, all materials that have this MRP type now have the new tab page in the header details.

Example

Business Attributes
ASAP Roadmap ID 105   Define functions and processes 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG SIMG_CFMENUOPP1_OM0O 0 HLA0006457 Planning Evaluation 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
V_T465 V - View SM30  
History
Last changed by/on SAP  20070807 
SAP Release Created in 700