Hierarchy
⤷ PP-MRP-BD (Application Component) Master Data
⤷ MD0C (Package) Customizing R/3 Material Requirements Planning
IMG Activity
ID | SIMG_CFMENUOM00OJI2 | Define JIT Call Profile |
Transaction Code | S_ALR_87005467 | IMG Activity: SIMG_CFMENUOM00OJI2 |
Created on | 19981222 | |
Customizing Attributes | SIMG_CFMENUOM00OJI2 | Define JIT Call Profile |
Customizing Activity | SIMG_CFMENUOM00OJI2 | Define JIT Call Profile |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | SIMG_CFMENUOM00OJI2 |
In this step, you define JIT call profiles. You assign a JIT call profile to a control cycle, thereby setting the automatic controls for all JIT calls created via this control cycle.
A JIT call profile consists of:
- The JIT call type (the summarized JIT call is currently available)
- The partner role
- The type of summary
- The time definition
These constitute the basic parameters for the creation of JIT calls. You define which type of JIT call is to be used, and the partner role used to define the message partner for transmission of the JIT call. You also enter in the JIT call profile if and how (for example, by plant) and from within what period of time the JIT calls are to be summarized.
If you choose to summarize, the system checks whether the material requirements can be assigned to an existing summarized JIT call header (for example, if you are summarizing by plant, it checks whether a summarized JIT call header exists for the plant). If the system cannot add the requirement as a new item in an existing summarized JIT call header, it creates a new summarized JIT call header with one item.
Example
Requirements
Standard settings
Recommendation
Activities
When creating the control cycle, enter the profile you have created here together with the replenishment strategy intended for the summarized JIT call.
To create a JIT call profile, proceed as follows:
- Starting from Customizing for Kanban, choose Define JIT call profile.
The Change View "JIT Call Profile": Overview screen appears.
- Choose New entries.
The New entries: Details of Created Entries screen appears.
- Enter a description and long text for the JIT call profile.
- Enter the JIT call type.
- Enter a Partner role JC.
- If you would like to summarize the requirements, enter the type of Summary and if necessary, the Time definition.
- Save your entries.
Further notes
Business Attributes
ASAP Roadmap ID | 203 | Establish Master Data |
Mandatory / Optional | 1 | Mandatory activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | SIMG_CFMENUOM00OJI2 | 0 | HLA0006762 | KANBAN Control |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
VC_PABPRF | V - View | SM30 | 0000000000 | Call View Maintenance |
History
Last changed by/on | SAP | 19981222 |
SAP Release Created in |