SAP ABAP IMG Activity SIMG_CFMENUOLSDVOVPX (Define Rules For Determining Dates)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
SD-MD (Application Component) Master Data
⤷
VIO (Package) Introductory Guide to R/3 Organization and Environment
⤷
⤷
IMG Activity
| ID | SIMG_CFMENUOLSDVOVPX | Define Rules For Determining Dates |
| Transaction Code | S_ALR_87007554 | IMG Activity: SIMG_CFMENUOLSDVOVPX |
| Created on | 19981222 | |
| Customizing Attributes | SIMG_CFMENUOLSDVOVPX | Define rules for determining dates |
| Customizing Activity | SIMG_CFMENUOLSDVOVP | Define rules for determining dates |
Document
| Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
| Document Name | SIMG_CFMENUOLSDVOVPX |
A baseline date (for example, current date, beginning of contract) forms the basis of every date determination rule. A period to be defined is added to this baseline date.
You define the rules for date determination on the basis of the following ates:
- The possible baseline date is predefined by a fixed value range (for example current date, beginning of the contract) and cannot be changed.
- You can define the period in any way by specifying a number with a corresponding time unit.
- If you use a calendar ID to define a rule, the system determines the next possible workday starting from the baseline date. If you use a calendar ID, you may NOT specify a period.
Note
in order to define a rule, you must maintain at least one baseline date.
Example
If a date determination rule takes the baseline date to be the contract start date, the period to be 6 and the time unit to be months, then the system determines the date starting from the agreement start date plus 6 months.
Actions
- Enter an alphanumeric key with a maximum of 2 characters together with a textual description for the rule. The description can, for example, contain the date determination in short form.
- Specify the baseline date.
- Specify either a period with a time unit or a calendar ID.
Business Attributes
| ASAP Roadmap ID | 204 | Establish Functions and Processes |
| Mandatory / Optional | 2 | Optional activity |
| Critical / Non-Critical | 2 | Non-critical |
| Country-Dependency | A | Valid for all countries |
Assigned Application Components
| Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
|---|---|---|---|---|
| SIMG | SIMG_CFMENUOLSDVOVPX | 0 | HLA0100734 O HLA0006915 |
Maintenance Objects
| Maintenance object type | C | Customizing Object |
| Assigned objects | ||||||
|---|---|---|---|---|---|---|
| Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
| V_TVRG | V - View | OVBS | 9999999999 | Rule Table for Date Determination |
History
| Last changed by/on | SAP | 19981222 |
| SAP Release Created in |