SAP ABAP IMG Activity SIMG_CFMENUOLPKOPU4 (Define scheduling parameters for SOP)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PP-CRP-LVL (Application Component) Capacity Leveling
     CY0C (Package) Customizing Capacity Planning
IMG Activity
ID SIMG_CFMENUOLPKOPU4 Define scheduling parameters for SOP  
Transaction Code S_ALR_87004528   IMG Activity: SIMG_CFMENUOLPKOPU4 
Created on 19981222    
Customizing Attributes SIMG_CFMENUOLPKOPU4   Define scheduling parameters for SOP 
Customizing Activity SIMG_CFMENUOLPKOPU4   Define Scheduling Parameters for SOP 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name SIMG_CFMENUOLPKOPU4    

In this step you specify for each plant and production scheduler the parameters for scheduling SOP orders. This comprises the maintenance of

  • scheduling levels (detailed-, production-rat- and rough-cut)
  • scheduling control for detailed scheduling
  • reduction

The parameters are described in more detail in what follows:

  • In detailed-, production-rate- and rough-cut scheduling you specify for each scheduling level
    • how the production dates are calculated
    • whether capacity requirements are generated
    • which rough-cut planning profile is the basis for scheduling
  • In scheduling control for detailed scheduling you define the control parameters for detailed scheduling, among other things
    • scheduling type
    • Here you specify the scheduling direction. You can also specify that a scheduling run is only used to generate capacity requirements.
    • Start date in the past
    • Here you specify how many days an order can be in the past before today scheduling is automatically triggered.
    • Automatically display log
    • Here you specify whether the log is automatically displayed after scheduling.
  • In reduction you specify
    • up to what maximum reduction level the reduction can take place
    • to what percentage the floats before and after production in every reduction level should be reduced.

Note

  • Note that scheduling is always carried out for all scheduling levels that you have maintained. This is very performance-intensive since data must be read from the database. Therefore it is recommended that you only maintain the relevant scheduling levels.

Actions

Define the scheduling parameters for SOP orders.

Business Attributes
ASAP Roadmap ID 204   Establish Functions and Processes 
Mandatory / Optional 1   Mandatory activity 
Critical / Non-Critical 1   Critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG SIMG_CFMENUOLPKOPU4 0 HLA0006470 O HLA0006256  
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
V_TCX00_SOP V - View OPU4 0000000001 SOP: Capacity Leveling 
History
Last changed by/on SAP  19981222 
SAP Release Created in