Maintain transportation planning points for external systems
Transaction Code
(empty)
Created on
19981230
Customizing Attributes
SCPI_TPI6
Maintain transportation planning points for external systems
Customizing Activity
SCPI_TPI6
Maintain transportation planning points for external systems
Document
Document Class
SIMG
Hypertext: Object Class - Class to which a document belongs.
Document Name
SCPI_TPI6
There is a unique mapping between a transportation planning point and an external transportation planning system, i.e. one planning point is assigned to exactly one planning system (whereas a logical system can be assigned to several transportation planning points).
In this IMG activity, control and communication parameters are set for a transportation planning position in its linked planning system:
Partner category and partner name of the planning system
Message category for message control
External number range for the shipment documents generated by the planning system
Whether an externally generated shipment document can be changed or not
Shipment status, where an externally planned shipment can be set to "not changeable" for the planning system
Filter mode for sending status messages to the transportation planning system
Text ID for shipping texts
Prerequisites
The external transportation system must be defined as a logical system.
You must set up an external shipment number range for the document numbers generated by the planning system.
If an external system is assigned to a transportation planning point, you must maintain the partner category, partner number, external number range and shipment changeability fields together. None of the fields may remain blank.
If you require that message processing for the planning system takes place while using message control (recommended setting), then you must configure your own message category for your planning system.
Activities
Enter partner category 'LS' and the name of the logical system of your transportation planning system as the partner number for the transportation planning point.
Enter the required external number range.
Set whether the shipment can be changed for the externally generated shipment documents. By switching this function off you can ensure that there are no inconsistencies between the shipment documents in the SAP system and those in your planning system.
If you wish to use message control for the communication, enter the message categories to be used by your planning system.
You can enter the required status, if you wish to send a message to the planning system at a certain shipment status (e.g. loading begun), to say that this shipment can no longer be re-planned.
If you wish to confirm the shipment messages in the planning system, whether they are incorrect or successful, set the required error mode.
Enter up to three text IDs for shipping texts which you would like to transmit with the planned deliveries to your planning system (e.g. shipping instructions).