SAP ABAP IMG Activity OLIS_MC70 (Configure scheduling parameters)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
LO-LIS (Application Component) Logistics Information System (LIS)
⤷
MC0C (Package) Customizing Logistics Information System

⤷

⤷

IMG Activity
ID | OLIS_MC70 | Configure scheduling parameters |
Transaction Code | S_ALR_87000632 | IMG Activity: OLIS_MC70 |
Created on | 19981222 | |
Customizing Attributes | OLIS_MC70 | Configure scheduling parameters |
Customizing Activity | OLIS_MC70 | Configure scheduling parameters |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | OLIS_MC70 |
In this step you specify for each plant and production scheduler the parameters for scheduling SOP orders. This comprises the maintenance of
- scheduling levels (detailed-, production-rat- and rough-cut)
- scheduling control for detailed scheduling
- reduction
The parameters are described in more detail in what follows:
- In detailed-, production-rate- and rough-cut scheduling you specify for each scheduling level
- how the production dates are calculated
- whether capacity requirements are generated
- which rough-cut planning profile is the basis for scheduling
- In scheduling control for detailed scheduling you define the control parameters for detailed scheduling, among other things
- scheduling type
- Here you specify the scheduling direction. You can also specify that a scheduling run is only used to generate capacity requirements.
- Start date in the past
- Here you specify how many days an order can be in the past before today scheduling is automatically triggered.
- Automatically display log
- Here you specify whether the log is automatically displayed after scheduling.
- In reduction you specify
- up to what maximum reduction level the reduction can take place
- to what percentage the floats before and after production in every reduction level should be reduced.
Note
- Note that scheduling is always carried out for all scheduling levels that you have maintained. This is very performance-intensive since data must be read from the database. Therefore it is recommended that you only maintain the relevant scheduling levels.
Actions
Define the scheduling parameters for SOP orders.
Business Attributes
ASAP Roadmap ID | 204 | Establish Functions and Processes |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | OLIS_MC70 | 0 | HLA0006421 O HLA0006250 O HLA0006700 |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
V_TCX00_SOP | V - View | OPU4 | LIS_SOP2 | Specify scheduling parameters |
History
Last changed by/on | SAP | 19981222 |
SAP Release Created in |