In this step, you make the general configurations necessary for SOP activities. Background jobs can then be created and scheduled for these activities. An SOP activity includes one or more of the following:
- a macro as defined in a planning type
- a transfer of data to Demand Management
- the copying of key figure values between versions of different information structures
- the forecast
For each activity, you specify:
- a key
This represents the activity that will be performed when the background job is run.
- a sequence number
One activity can comprise several actions. This number determines the sequence in which these actions are performed when the background job (that is, the activity) is carried out.
- a planning type
In this field, you specify the planning type to which the activity refers. You must make an entry in this field.
If you are copying between information structures, you enter a planning type of the target information structure.
- an action
In this field, you specify whether the action is a macro, a transfer to Demand Management, the copying between versions of information structures, or the forecast.
- macro
If the action is a macro, you specify the macro name here.
- transfer profile
If the action is the transfer of planning data to Demand Management, you specify a transfer profile here.
- copy profile
If the action is the copying of data from one information structure to another, you specify a copy profile here.
- forecast profile
If the action is the forecast, you specify a forecast profile here.
- table
If the action is the forecast, you enter here the information structure of the key figure for which the forecast will be run.
- field name
If the action is the forecast, you enter here the key figure for which the forecast will be run.
Requirements
Before you carry out this step, you need to have defined the planning type.
You also need to have defined the action:
Actions
- Make or change your entries.
- Save them.
Further notes
You do not need to create an activity if the following conditions are met:
- the planning method of both your source and your target information structures is consistent planning
- you require a high-level copy with subsequent distribution
In this case, you create a key figure assignment profile and then carry out the function Planning -> Mass processing -> Copy/delete version -> High-level copy.
For more information, see Copy key figures between info structures.
Business Attributes
ASAP Roadmap ID | 204 | Establish Functions and Processes |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 1 | Critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | OLIS_ACTI | 0 | HLA0009522 O HLA0006250 O HLA0006700 |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
LISAKT | S - Table (with text table) | SM30 | 0000000002 | Background planning activities |
History
Last changed by/on | SAP | 19981222 |
SAP Release Created in |