Hierarchy
⤷ PY-CH (Application Component) Switzerland
⤷ P02C (Package) HR Customizing: Switzerland
IMG Activity
ID | OHPKVS321 | PC schedules: Define, copy, delete, check |
Transaction Code | S_AHR_61010084 | IMG Activity: OHPKVS321 |
Created on | 19981221 | |
Customizing Attributes | OHPKVS321 | PC schedules: Define, copy, delete, check |
Customizing Activity | OHPKVS321 | PC schedules: Define, copy, delete, check |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | OHPKVS321 |
This step enables you to set up, check or delete the following data for a PC schedule:
- Processing schedules
- Processing schedule descriptions
- PC method determination
- PC method variant determination
- PC method definition
- Schedule value types
- EE groupings for PC method determination
- Description of EE groupings for PC method determination
- Line markers in processing schedules
- Value type attribute assignment
- PC calculation control
- Field selection for PC online evaluation
- Online value type attribute
You can use the following functions to process the aforementioned settings:
- Copy schedule
This function copies the settings from the original schedule to the target schedule. The system will not overwrite data that has been stored in the target schedule. If not already created, the copying procedure automatically creates the target schedule.
- Replace schedule
This function copies all the settings created in the original schedule to the target schedule and deletes the target schedule. If not already created, the copying procedure automatically creates the target schedule.
- Delete schedule
This function deletes all the settings maintained for a schedule.
- Check schedule
This functions checks that the settings maintained for a schedule are consistent. The check is based on the foreign key dependency of the tables in which the individual settings are stored.
- Transport schedule
This function saves the settings maintained for a schedule to a transport request. You can choose whether you want to transport all the settings or only settings that have been modified.
Note
The system has been set up to process all the aforementioned data. To copy individual records, choose Settings -> Interactive copy -> On.
Activities
Carry out the appropriate function for your schedules. To check the results, go to Extras -> Technical logs.
Business Attributes
ASAP Roadmap ID | 203 | Establish Master Data |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | I | Valid for countries specified |
Customizing Attributes | Country Key | Country Name |
---|---|---|
OHPKVS321 | CH | Switzerland |
OHPKVS321 | NL | Netherlands |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | OHPKVS321 | 0 | HLA0003789 | Pension fund: General Parts |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
PUCV1 | T - Individual transaction object | PUCV | P02V1 | Copy processing control plans |
History
Last changed by/on | SAP | 19990224 |
SAP Release Created in |