Hierarchy
⤷ IM-FA-IA (Application Component) Appropriation Requests
⤷ AIR (Package) IM appropr.reqs.(master data, planning, preinvestment anal.)
IMG Activity
ID | OANF_VCK03 | Process Costing Variants |
Transaction Code | S_ALR_87100682 | (empty) |
Created on | 19991118 | |
Customizing Attributes | OANF_VCK03 | Process Costing Variants |
Customizing Activity | OANF_VCK03 | Process Costing Variants |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | SIMG_ECPES_OKYZ |
The costing variant represents the connection between the application and Customizing, because all costings are carried out and saved with reference to a costing variant.
Control parameters in the costing variant
You use this costing variant to include all of the control parameters for the costing of appropriation requests:
- Costing type
- Valuation variant
Example
Standard settings
Recommendation
You should assign a different valuation variant to every costing variant that you intend to use to save cost estimates.
Although there is nothing to prevent you from using costing variants with the same costing type and valuation variant, you should not do this so as to avoid either variant overwriting the data of the other.
The reason for this is the key structure for the costing results in the database. This key structure is based on the costing type and the valuation variant, and not the costing variant.
Making a unique assignment enables you to change the valuation strategies later if and when required.
Activities
Check to ensure whether the costing variant delivered meets your requirements. If this is not the case then create a new one:
- Choose Back. You branch to the screen Change view "Costing variants": Overview.
- Choose New entries.
- Enter an alphanumeric key and a description for the costing variant.
- Assign the following parameters to the costing variant:
- Costing type
- The costing type for appropriation request comprises one key and one short text.
- Valuation variant
- Save the costing variant.
Further notes
Business Attributes
ASAP Roadmap ID | 204 | Establish Functions and Processes |
Mandatory / Optional | 1 | Mandatory activity |
Critical / Non-Critical | 1 | Critical |
Country-Dependency | A | Valid for all countries |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
V_CK03 | V - View | OKYZ |
History
Last changed by/on | SAP | 20000127 |
SAP Release Created in | 46C |