SAP ABAP IMG Activity ISP_IS_PL_FUNCMVAKT (Define Activities)
Hierarchy
IS-M (Software Component) SAP MEDIA
   IS-M (Application Component) SAP Media
     JAS (Package) Application development R/3 Publishing Advertising System***
IMG Activity
ID ISP_IS_PL_FUNCMVAKT Define Activities  
Transaction Code S_KK4_74001467   IMG Activity: ISP_IS-M:L_FUNCMVAKT 
Created on 19990816    
Customizing Attributes ISP_IS_PL_FUNCMVAKT   Define activities 
Customizing Activity ISP_IS_PL_FUNCMVAKT   Define activities 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name ISP_IS_PL_FUNCMVAKT    

In this step, you make the general configurations necessary for SOP activities. Background jobs can then be created and scheduled for these activities. An SOP activity includes one or more of the following:

  • a macro as defined in a planning type
  • a transfer of data to Demand Management
  • the copying of key figure values between versions of different information structures
  • the forecast

For each activity, you specify:

  • a key

    This represents the activity that will be performed when the background job is run.

  • a sequence number

    One activity can comprise several actions. This number determines the sequence in which these actions are performed when the background job (that is, the activity) is carried out.

  • a planning type

    In this field, you specify the planning type to which the activity refers. You must make an entry in this field.

    If you are copying between information structures, you enter a planning type of the target information structure.

  • an action

    In this field, you specify whether the action is a macro, a transfer to Demand Management, the copying between versions of information structures, or the forecast.

  • macro

    If the action is a macro, you specify the macro name here.

  • transfer profile

    If the action is the transfer of planning data to Demand Management, you specify a transfer profile here.

  • copy profile

    If the action is the copying of data from one information structure to another, you specify a copy profile here.

  • forecast profile

    If the action is the forecast, you specify a forecast profile here.

  • table

    If the action is the forecast, you enter here the information structure of the key figure for which the forecast will be run.

  • field name

    If the action is the forecast, you enter here the key figure for which the forecast will be run.

Requirements

Before you carry out this step, you need to have defined the planning type.

You also need to have defined the action:

Actions

  1. Make or change your entries.
  2. Save them.

Further notes

You do not need to create an activity if the following conditions are met:

  • the planning method of both your source and your target information structures is consistent planning
  • you require a high-level copy with subsequent distribution

In this case, you create a key figure assignment profile and then carry out the function Planning -> Mass processing -> Copy/delete version -> High-level copy.

For more information, see Copy key figures between info structures.

Business Attributes
ASAP Roadmap ID 204   Establish Functions and Processes 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 1   Critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG ISP_IS_PL_FUNCMVAKT 0 I170007158 O  
SIMG ISP_IS_PL_FUNCMVAKT 1 I170007159 Information System for Advertising Management 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
LISAKT S - Table (with text table) SM30 ISP-IS-001 Background planning activities 
History
Last changed by/on SAP  19990816 
SAP Release Created in