SAP ABAP IMG Activity IEQCM_CCM_HOLE_BADI (BAdI: Update Structure Gaps)
Hierarchy
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
   PM-EQM-EQ (Application Component) Equipment
     IEQCM_EXT (Package) Change of Equipment History - Enhancement for Ext. Set
IMG Activity
ID IEQCM_CCM_HOLE_BADI BAdI: Update Structure Gaps  
Transaction Code S_PEN_05000043   (empty) 
Created on 20050427    
Customizing Attributes IEQCM_CCM_HOLE_BADI   BAdI: Update Structure Gaps 
Customizing Activity IEQCM_CCM_HOLE_BADI   BAdI: Update Structure Gaps 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name IEQCM_CCM_HOLE_BADI    

Use

This Business Add-In (BAdI) is used in the component Equipment (PM-EQM-EQ). You can use this BAdI to create, update, or delete structure gaps after the reorganization of the equipment history.

The BAdI includes the following methods:

Requirements

Standard settings

There is a default implementation for all the methods listed above.

Activities

After you call the IMG activity, the system displays a dialog box where you enter a name for the implementation.

If implementations of this Business Add-In have already been created, the system displays them in a dialog box. You then choose one of them by choosing Create, and continue as follows:

  1. In the dialog box, enter a name for the implementation of the Add-In and choose Create.
    The system displays the initial screen for creating Business Add-In implementations.
  2. On this screen, enter a short description for your implementation in the Implementation Short Text field.
  3. If you choose the Interface tab, you will notice that the system has populated the Name of the Implementing Class field automatically, by assigning a class name based on the name of your implementation.
  4. Save your entries and assign the Add-In to a package.
  5. To edit a method, double-click its name.
  6. Enter your implementation code between the method <Interface Name>~<Name of Method>. and endmethod. statements.
  7. Save and activate your code. Navigate back to the Change Implementation screen.
    Note: You can also create an implementation for an Add-In and not activate it until later. If you want to do this, do not perform the following step:
  8. Choose Activate.
    When the application program is executed, the code you created is run through.

Example

An equipment was installed at technical object A before the reorganization of the history. After the reorganization it is installed at technical object B. The above method now generates a structure gap for technical object A and simultaneously deletes a structure gap in technical object B.

Business Attributes
ASAP Roadmap ID 153   Design enhancements 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 1   Critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG IEQCM_CCM_HOLE_BADI 0 HLA0006642 Equipment 
Maintenance Objects
Maintenance object type E   Business Add-In - Definition 
History
Last changed by/on SAP  20050427 
SAP Release Created in 600