SAP ABAP IMG Activity GHO_PP_PT_V_PRF (Maintain Planning Table Profile)
Hierarchy
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
   PP-PN-NOP (Application Component) Network Operations
     EA_GHO_PP_PT_GEN (Package) GHO PP: Planning Table General - UI and Customizing
IMG Activity
ID GHO_PP_PT_V_PRF Maintain Planning Table Profile  
Transaction Code S_EE6_85000052   (empty) 
Created on 20100727    
Customizing Attributes GHO_PP_PT_V_PRF   Maintain Planning Table Profile 
Customizing Activity GHO_PP_PT_V_PRF   Maintain Planning Table Profile 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name GHO_PP_PT_V_PRF    

Use

In this Customizing activity, you can create and maintain user-specific profiles of the planning table. You can define several profiles for one user to set a special focus.

In the profile, you can define display options, tolerance ranges, and the distribution mode.

Display Options

  • Planning Views

    Choose the planning view with which you want to enter the application. Additionally, you can select a planning procedure (top down, bottom up, all planning-relevant objects) and the respective hierarchical displays of the planning data.

    Hide Views: Select an additional subview if you want to hide it, for example, for reasons of clarity.

    Planning Horizon

    • Relative Planning Horizon
    • The planning horizon specifies the number of days, weeks or months for which your planning is to be valid. For the relative planning horizon, you specify a certain time frame that moves as a whole in relation to the current date. It does not matter if the planning period is exclusively in the past (for example, to compare planning values) or in the future. If you want to plan as of today, you have to enter '0' in the relevant field or leave it blank.
    • Absolute Planning Horizon
    • Here you can enter an exact date. The planning horizon remains fixed.
  • Level of Network Structure

    Choose the displayed hierarchy level of the planned network.

  • Information Displayed in Planning Table

    Choose whether you want to display the information as ID or description for the network object node and the allocation material.

  • Quantities to be Compared

    Choose whether you want to compare the planned quantity or the allocation quantity per default in the different planning views.

  • Difference Display

    Determine the display mode of the difference of the compared values, for example, planned quantities, allocation quantities, and actual quantities, or define whether the difference is displayed at all in the planning table.

Tolerances

You can define a certain tolerance range for the comparison of your planned, allocated, and actual values per view. You can use the several combinations. For each view, you can define a tolerance range. You can set the allowed deviation from the comparison value in both directions, positive and negative:

  • Uncritical Values

    Uncritical values can be set freely. Enter a tolerance range that does not have a main impact on your planning situation.

  • Critical Values

    The benchmark data of the critical tolerance range must not be smaller than that of the uncritical one. Critical values can be set freely as well. If a value is out of the tolerance range, it is highlighted in yellow in the planning table for warning purposes.

  • Very Critical Values

    Very critical values harm your planning. It is not possible to operate with such figures that are out of the critical tolerance range. In the planning table, they are highlighted in red.

Distribution Mode

If you decide to do your planning in cumulated periods, here you can choose how to distribute the quantities in daily buckets:

  • Equal Distribution of Total Quantities

    The entered planning value is distributed equally over all days of the period. The disaggregation levels the total value over the period. Individual differences between certain days of the periods will be lost.

  • Equal Distribution of Difference Quantities

    The difference delta (quantity delta) between the entered and the old planning value is distributed over all days of the period. The disaggregation levels the total change of the period. Individual differences between the days are kept but smoothed.

  • Proportional Distribution

    While comparing the entered planning value with the old one, the daily values are adjusted proportionally to the change of the aggregated value. In this way, individual differences between certain days of the period can be kept.

Requirements

Standard settings

Activities

Example

Business Attributes
ASAP Roadmap ID 255   Create Interfaces 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG GHO_PP_PT_V_PRF 0 EB50000111 Production Network 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
GHO_PP_PT_V_PRF V - View SM30  
History
Last changed by/on SAP  20100727 
SAP Release Created in 606