SAP ABAP IMG Activity E_IPPE_PS_EXT (BAdI: iPPE Connection to Project System)
Hierarchy
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
   LO-MD-PPE (Application Component) Integrated Product and Process Engineering
     CPPEPRO (Package) iPPE Objects in the Project System Connection
IMG Activity
ID E_IPPE_PS_EXT BAdI: iPPE Connection to Project System  
Transaction Code S_AEN_10001013   (empty) 
Created on 20050407    
Customizing Attributes E_IPPE_PS_EXT   BAdI: iPPE Connection to Project System 
Customizing Activity E_IPPE_PS_EXT   BAdI: iPPE Connection to Project System 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name IPPE_PS_EXT    

Use

Appication Component: AP-PPE.

You can use the Business Add-In (BAdI) iPPE_CMP_CHECK_EXT to influence the maintenance processes for the following objects in the iPPE product structure:

  • Nodes
  • Alternatives
  • Variants

The maintenance processes include the following:

  • Create
  • Change
  • Delete

If you are using change management, you can make changes in the following objects when switching the change number:

  • Component variants
  • Color variants
  • Assembly items

Requirements

Standard settings

  • The Business Add-In is not active in the standard system.

  • The Business Add-In is not filter-dependent.

  • The Business Add-In cannot exist at several positions.

Activities

To activate the Business Add-In, you have to create an active implementation.

  1. To do so, choose the IMG activity by double-clicking @15@.

    Or

  2. To do so, choose the following menu in the SAP Easy Access Menu Tools -> ABAP Workbench -> Utilities -> Business Add-Ins -> Implementation.

    If implementations already exist for the selected BAdI, the system braches to a dialog box displaying a list of the existing implementations.

  3. In this dialog box, choose Create.

    The system branches to the dialog box BAdI Builder: Create Implementation.

  4. Enter an implementation name and choose Continue.

    The screen Business Add-In Builder: Change Implementation appears.

  5. In the field Implementation Short Text enter a short desctiption.
  6. Select the tab page Interface.

    In this tab page, the field Name of implementing class is filled automatically as the system assigns the class name using the name of the implementation.

  7. Save your entries and assign the implementation to a package.
  8. Position the cursor on one of the methods. Access the class builder with a double click.
  9. Enter the coding for the implementation between the instructions method <Interface-Name>~ <Method nAME>.and endmethod.
  10. Save and activate your coding and return to the screen Change Implementation.
  11. Save your data again.

    Note: It is possible to create an implementation for a BAdI and activate it later. In this case, you should exit processing here.

  12. Choose Aktivate.

During the execution of the application program, the system now runs through the coding you saved in the method.

You can find additional information in the SAP Library under SAP NetWeaver Components -> SAP Web Application Server -> ABAP Workbench (BC-DWB)-> Changing the SAP Standard (BC) -> Business Add-Ins -> Implementing a Business Add-In.

Example

Business Attributes
ASAP Roadmap ID 203   Establish Master Data 
Mandatory / Optional 3   Nonrequired activity 
Critical / Non-Critical 1   Critical 
Country-Dependency A   Valid for all countries 
Maintenance Objects
Maintenance object type E   Business Add-In - Definition 
History
Last changed by/on SAP  20050407 
SAP Release Created in 600