Hierarchy

⤷

⤷

IMG Activity
ID | _PSM_SUBDIVISION | Create and Define Subdivision ID |
Transaction Code | S_ALN_01001445 | (empty) |
Created on | 20030203 | |
Customizing Attributes | _PSM_SUBDIVISION | Define Subdivision ID |
Customizing Activity | _PSM_SUBDIVISION | Define Subdivision ID |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | _PSM_SUBDIVISION |
Create and Define Subdivision ID
Use
The subdivision ID is used to subdivide master data into sections, so that user-defined information can be included in the account assignment data. Below this subdivision ID, you have to define the corresponding subdivision structure, which is made up of the individual substrings of an account assignment element for each subdivision ID.
Activities
- Create a subdivision ID for each account assignment element you want to subdivide. The name of the subdivision ID is user-defined, and a check is performed by the Business Add-In Check Subdivision ID if implemented. You can use the same subdivision ID name for different account assignment elements.
- Define a substring for each FM account assignment element, including the number, length and position of the individual substrings of an account assignment element for each subdivision ID.
When you define the subdivision structure for each account assignment element and subdivision ID, you can divide the fields - according to your master record data - into the following maximum number of substrings:
Account assignment element Number of substrings
Commitment item 5
Funds center 3
Fund 2
Functional area 3
For each substring, you must define the length and position within the account assignment element.
Note that a substring can have a maximum of 10 characters. In addition, the total length of the resulting account assignment, including the separator (which you define in the activity Activate Subdivision) must not exceed the maximum length of the account assignment element.
Business Attributes
ASAP Roadmap ID | 203 | Establish Master Data |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | _PSM_SUBDIVISION | 0 | I150004902 | Master Data |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
VC_FMMD_SUBDIVISION | C - View cluster | SM34 |
History
Last changed by/on | SAP | 20030211 |
SAP Release Created in | 200 |