Document
| Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
| Document Name | /SAPPCE/TPNV15 |
Use
If you want to enter the value of the work completed cumulatively, you activate Consolidation using this IMG activity.
Note that this setting may not be reset in a production system. This leads to data inconsistencies.
Requirements
In Customizing for Construction Progress Report and Valuation under Change Message Control you determine whether the system displays system message /SAPPCE/PNV031 as an error or warning message.
This system message relates to consolidation activation if construction progress reports already exist.
- If you define this system message as an error warning, it is not possible to change the activation indicator for consolidation.
- If you define this system message as a warning, you can change the activation indicator for the consolidation.
Standard settings
Consolidation is not activated.
Normally only values for work actually completed are entered for a WBS element. With the cumulative view in the information system for Project System, you have a complete view. Therefore it is not necessary to enter cumulative values or consolidate them for the higher-level WBS element.
Activities
Example
Business Attributes
| ASAP Roadmap ID | 105 | Define functions and processes |
| Mandatory / Optional | 3 | Nonrequired activity |
| Critical / Non-Critical | 1 | Critical |
| Country-Dependency | A | Valid for all countries |
Assigned Application Components
| Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
|---|---|---|---|---|
| SIMG | /SAPPCE/TPNV15 | 0 | ALN0000441 | Construction Progress Report |
Maintenance Objects
| Maintenance object type | C | Customizing Object |
| Assigned objects | ||||||
|---|---|---|---|---|---|---|
| Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
| /SAPPCE/TPNV15 | S - Table (with text table) | SM30 |
History
| Last changed by/on | SAP | 20030409 |
| SAP Release Created in | 1.0 |