Hierarchy

⤷

⤷

IMG Activity
ID | /SAPPCE/TPNV08 | Additional Settings for Valuation of Semifinished Constructions |
Transaction Code | /SAPPCE/24000006 | IMG Activity: /SAPPCE/TPNV08 |
Created on | 20020227 | |
Customizing Attributes | /SAPPCE/TPNV08 | Additional Settings for Valuation of Construction Sites |
Customizing Activity | /SAPPCE/TPNV08 | Additional Settings for Valuation of Construction Sites |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | /SAPPCE/TPNV08 |
In this IMG activity you determine which procedure to use for the valuation of semifinished constructions for each results analysis key, results analysis version and status.
- For the respective valuation procedure you enter the line IDs under which the key figures Asset reduction due to actual loss and Asset reduction due to imminent loss. are updated.
- You specify the maximum allowed rounding error in the currency of the controlling area. In contrast to the construction progress report, the invoiced payment is updated to the cent. If an amount is calculated when working out the difference from the invoiced payment and construction progress report that is less or equal to this rounding error, the difference is set to zero.
These settings have no effect on the standard results analysis.
Example
You use the following procedures for the results analysis:
- International Accounting Standard (IAS) for results analysis version 000
- German Commercial Code for results analysis version 001
You determine the procedure in this IMG activity.
Requirements
You have configured the following settings in Customizing for Project System under Revenues and Earnings -> Automatic and Periodic Allocations -> Results Analysis -> Edit Results Analysis Keys and Version
- Maintain Results Analysis Keys
- Maintain Results Analysis Versions
- Define Valuation Methods for Results Analysis
- Define Line IDs
- Define Update for Results Analysis
Standard settings
Recommendation
Activities
- Select New Entries.
- Enter the controlling area, results analysis version and results analysis key.
- Enter the maximum possible rounding error in the currency of the controlling area, when the invoiced work and the work entered in the construction progress report are compared.
- Depending on the chosen valuation method, you enter the line IDs for the key figures Asset reduction due to actual loss and Asset reduction due to imminent loss.
- Save your input
Further notes
If you want to forward the key figures updated from the valuation to financial accounting, define the following in Customizing for Project System under Revenues and Earnings -> Automatic and Periodic Allocations -> Results Analysis -> Edit Results Analysis Keys and Version -> Define Posting Rules for Settlement to Accounting
Business Attributes
ASAP Roadmap ID | 204 | Establish Functions and Processes |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 1 | Critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | /SAPPCE/TPNV08 | 0 | ALN0000441 | Construction Progress Report |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
/SAPPCE/TPNV08 | S - Table (with text table) | SM30 |
History
Last changed by/on | SAP | 20030626 |
SAP Release Created in | 1.0 |