SAP ABAP IMG Activity /SAPPCE/BADI_PNV01 (BAdI: Construction Progress Report)
Hierarchy
EA-FIN (Software Component) EA-FIN
   PS-REV-CPR (Application Component) Construction Progress Report
     /SAPPCE/PNV (Package) Construction Progress Report and Valuation
IMG Activity
ID /SAPPCE/BADI_PNV01 BAdI: Construction Progress Report  
Transaction Code /SAPPCE/24000005   IMG Activity: /SAPPCE/BADI_PNV01 
Created on 20020227    
Customizing Attributes /SAPPCE/BADI_PNV01   BAdI: Construction Progress Reports 
Customizing Activity /SAPPCE/BADI_PNV01   BAdI: Construction Progress Reports 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name /SAPPCE/PNV    

With Business Add-In (BAdI) /SAPPCE/PNV you can enhance construction progress reports.

You can:

  • Develop your own check routines for authorization checks and consistency checks for processing contract values
  • Enhance the communications interface between the template (BDS document) and the SAP System
  • Provide your own currency conversions
  • Change or add CO postings
  • Determine the operated share in relation to the joint venture investment share after you have transferred the total values of the joint venture for the construction progress reports

Example

Requirements

Standard settings

The Business Add-In is

  • not active
  • not filter dependent
  • multi-usage

Recommendation

Activities

After calling up the IMG activity, a dialog box appears, in which you can enter a name for the implementation.

If you have already made other implementations for this BAdI, another dialog box appears, in which the existing implementations are displayed. In this case, choose Create, and proceed as follows:

  1. In the dialog box, enter a name for the BAdI implementation in the Implementation field, and choose Create.

    The screen for creating BAdI implementations is now displayed.

  2. Enter a short text for the implementation in the Short text for implementation field.
  3. From the tab index, choose Interface.

    The Name of implemented class field is already filled on the tab page, as a class name was automatically assigned to the implementation when you named it.

  4. Save your entries, and assign the implementation to a development class.
  5. Place the cursor on the method, and double-click to enter method processing.
  6. Enter the code for the implementation between the statements method <Interface name> ~ <Name of method> and endmethod.
  7. Save and implement your code. Return to the Edit Implementation screen.
  8. Save the entries on the Edit Implementation screen.

    Note: You can also create an implementation, and then activate it at a later time. In such a case, end the processing stage at this point.

  9. Choose Activate

    The code you stored in the method will be run when the application program is executed.

Further notes

For more information see the documentation on BAdI methods:

Authorization Check for Construction Progress Report

Consistency Check for Construction Progress Report Header Data

Consistency Check for Construction Progress Report Items

Enhancing BDS Document and R/3 System Interfaces

Currency Conversion

Change or Add CO Postings

Determination of Operated Share in Joint Venture

Read Additional Cost Elements

Check WBS Element/Project

Business Attributes
ASAP Roadmap ID 257   Create User Exits 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 1   Critical 
Country-Dependency A   Valid for all countries 
Maintenance Objects
Maintenance object type E   Business Add-In - Definition 
History
Last changed by/on SAP  20030409 
SAP Release Created in 1.0