SAP ABAP IMG Activity /MRSS/SCHED_C_ABSTAT (Define Abstract Status)
Hierarchy
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
   PM-WOC-MO (Application Component) Maintenance Orders
     /MRSS/SGE (Package) Multiresource Planning: Scheduling Engine
IMG Activity
ID /MRSS/SCHED_C_ABSTAT Define Abstract Status  
Transaction Code /MRSS/92000024   IMG Activity 
Created on 20090806    
Customizing Attributes /MRSS/SCHED_C_ABSTAT   Define Abstract Status 
Customizing Activity /MRSS/SCHED_C_ABSTAT   Define Abstract Status 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name /MRSS/SCHED_C_ABSTAT    

Use

In this Customizing activity, you define abstract statuses that are to be used for resource planning in SAP Multiresource Scheduling. You then assign these abstract statuses in the respective Customizing activities Assign Status (to Use Demands from SAP NetWeaver) or Assign Status for Demands (ERP) to the concrete statuses used in the SAP NetWeaver system or in the SAP ERP system.

Requirements

Standard settings

Activities

Create abstract statuses with ID and description as described below.

The following statuses are relevant for all integration scenarios:

Status    Meaning

PLAN_EMPTY    Demand Not Planned

PLAN_FULL    Demand Fully Planned

PLAN_OVER    Demand Overplanned

PLAN_UNDR    Demand Underplanned

Depending on the integration scenario, the following statuses are relevant:

  • Status for integration with collaboration projects:

Status    Meaning

RES_ALLCTD    Resource Allocated

RES_PROPSD    Resource Proposed

RES_REJECT    Resource Rejected

RES_SELECT    Resource Selected

RES_RESERV    Resource Reserved

RES_NOTSEL    Proposed Resource Not Selected

RES_SELEC    Proposed Resource Selected

WORK_START    Work Started

WORK_STOP    Work Stopped

  • Status for integration with plant maintenance (PM) and customer service (CS):

Status    Meaning

ARRAN_DATE    Date Agreement Required

DESIR_DATE    Required Date

FIXED_DATE    Fixed Date

IRDA_RELEV    IRDA Relevant

HAS_CAPA    Capacitive Assignments Available

OR_HAS_ASG    Order Contains At Least One Assignment

  • Status for integration with Project System (PS):

Status    Meaning

NW_BOOKED    Network Booked

NW_RESERVD    Network Reserved

IRDA_RELEV    IRDA Relevant

REM_EFFORT    Remaining Demand Processed

PLAN_START    Planning Start Date

WITH_MAN_ACCP    With Manual Exceptance

HAS_NO_ASG    Has No Assignments

Example

Business Attributes
ASAP Roadmap ID 203   Establish Master Data 
Mandatory / Optional 1   Mandatory activity 
Critical / Non-Critical 1   Critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG /MRSS/SCHED_C_ABSTAT 0 HLB0009110 Cross-Application Components 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
/MRSS/MV_ABSTAT V - View SM30  
History
Last changed by/on SAP  20090908 
SAP Release Created in 700