Where Used List (Function Module) for SAP ABAP Table JBRSAVEGAP (RM: Gap Interim Results for Saving)
SAP ABAP Table
JBRSAVEGAP (RM: Gap Interim Results for Saving) is used by
| # | Object Type | Object Name | Object Description | Package | Structure Package | Software Component |
|---|---|---|---|---|---|---|
| 1 |
GAP_LZB_TASK I_JBRSAVEGAP STRUCTURE JBRSAVEGAP OPTIONAL
|
Generation of Temporary Results Structure in Maturity Band | ||||
| 2 |
GAP_LZB_TASK
|
Generation of Temporary Results Structure in Maturity Band | ||||
| 3 |
GAP_MULTI_TASK
|
Parallel Processing: Call in Multi-Task Parallel Mode | ||||
| 4 |
GAP_MULTI_TASK I_JBRSAVEGAP STRUCTURE JBRSAVEGAP OPTIONAL
|
Parallel Processing: Call in Multi-Task Parallel Mode | ||||
| 5 |
GAP_PROCESS_TASK I_JBRSAVEGAP STRUCTURE JBRSAVEGAP
|
Parallel Processing: Processing of a Separate Task | ||||
| 6 |
GAP_SCHEDULE_TASK I_JBRSAVEGAP STRUCTURE JBRSAVEGAP
|
Parallel Processing: Scheduler for Evaluation Tasks | ||||
| 7 |
GAP_SINGLE_TASK I_JBRSAVEGAP STRUCTURE JBRSAVEGAP
|
Parallel Processing: Call in Single Task Mode | ||||
| 8 |
ISB_ALM_EVAL_SIM_BY_GAP_2
|
...EVAL_SIM_BY_GAP (Gap Analysis of Simulated Transactions) | ||||
| 9 |
ISB_CONDENSE_ZWERG E_JBRSAVEGAP STRUCTURE JBRSAVEGAP
|
IS-B: Aggregates the interim results for saving | ||||
| 10 |
ISB_CONDENSE_ZWERG
|
IS-B: Aggregates the interim results for saving | ||||
| 11 |
ISB_FILL_GAP_STRUCTURE_2
|
IS-B: RM Filterinf of Analysis Cash Flows for Gap Evaluations | ||||
| 12 |
ISB_FILL_GAP_STRUCTURE_2 I_JBRSAVEGAP STRUCTURE JBRSAVEGAP
|
IS-B: RM Filterinf of Analysis Cash Flows for Gap Evaluations | ||||
| 13 |
ISB_GAP_ANALYSIS E_JBRSAVEGAP STRUCTURE JBRSAVEGAP OPTIONAL
|
IS-B: RM Analysis of Risk Objects | ||||
| 14 |
ISB_GAP_CALC_JBREOGAP_2 I_JBRSAVEGAP STRUCTURE JBRSAVEGAP OPTIONAL
|
Generation of Temporary Results Structure in Maturity Band | ||||
| 15 |
ISB_GAP_LZB_2
|
Aggregation of Gap Cash Flows into one Date Pattern (Maturity Band) | ||||
| 16 |
ISB_GAP_SAVE_ANALYSIS_RESULTS IT_RESULT STRUCTURE JBRSAVEGAP
|
IS-B: RM Saving of the Results of the Gap Analysis (Main Function Module) | ||||
| 17 |
ISB_GAP_SAVE_ANALYSIS_RESULTS
|
IS-B: RM Saving of the Results of the Gap Analysis (Main Function Module) | ||||
| 18 |
ISB_RM_GAP_APPLY_MATURITY_SCEN
|
Use of a Due Date Scenario on the Gap Analysis Objects | ||||
| 19 |
ISB_RM_GAP_APPLY_MATURITY_SCEN I_JBRSAVEGAP STRUCTURE JBRSAVEGAP
|
Use of a Due Date Scenario on the Gap Analysis Objects | ||||
| 20 |
ISB_RM_GAP_APPLY_MATURITY_SCEN E_JBRSAVEGAP_FAELL STRUCTURE JBRSAVEGAP
|
Use of a Due Date Scenario on the Gap Analysis Objects | ||||
| 21 |
ISB_RM_GAP_DELETE_MAT_SCEN
|
RM Gap: Deletion of Due Date Scenarios | ||||
| 22 |
ISB_RM_GAP_FOR_MATURITY_SCEN
|
IS-B: RM Evaluation of Gap for Due Date Scenarios | ||||
| 23 |
ISB_RM_GAP_FOR_MATURITY_SCEN I_JBRSAVEGAP STRUCTURE JBRSAVEGAP
|
IS-B: RM Evaluation of Gap for Due Date Scenarios | ||||
| 24 |
RM_APPEND_GLOBAL_DATA_FOR_M_SC I_IT_JBRSAVEGAP_IST_FAELL STRUCTURE JBRSAVEGAP OPTIONAL
|
RM: Append to the global memory for due date scenarios from ALM | ||||
| 25 |
RM_APPEND_GLOBAL_DATA_FOR_M_SC
|
RM: Append to the global memory for due date scenarios from ALM | ||||
| 26 |
RM_APPEND_GLOBAL_DATA_FOR_M_SC I_IT_JBRSAVEGAP_SIM_FAELL STRUCTURE JBRSAVEGAP OPTIONAL
|
RM: Append to the global memory for due date scenarios from ALM | ||||
| 27 |
RM_APPEND_GLOBAL_DATA_FOR_M_SC I_IT_JBRSAVEGAP STRUCTURE JBRSAVEGAP OPTIONAL
|
RM: Append to the global memory for due date scenarios from ALM | ||||
| 28 |
RM_EVAL_PROCESS_BACK E_EOGAP STRUCTURE JBRSAVEGAP OPTIONAL
|
Parallel Processing: Processing of a Separate Back Testing Task | ||||
| 29 |
RM_EVAL_PROCESS_TASK E_EOGAP STRUCTURE JBRSAVEGAP OPTIONAL
|
Parallel Processing: Processing of a Separate Task | ||||
| 30 |
RM_FIMA_EVAL E_EOSGAP STRUCTURE JBRSAVEGAP OPTIONAL
|
RM-FIMA: Call of All Evaluation Categories | ||||
| 31 |
RM_GAP_AGGREGATE_LZB I_JBRSAVEGAP STRUCTURE JBRSAVEGAP
|
Aggregates the results to a maturity band | ||||
| 32 |
RM_GAP_CALC IT_JBRSAVEGAP STRUCTURE JBRSAVEGAP
|
Gets the original gap analysis results | ||||
| 33 |
RM_GAP_EVAL
|
IS-B: RM Gap Analysis | ||||
| 34 |
RM_GAP_GET_SAVED_RESULTS IT_JBRSAVEGAP STRUCTURE JBRSAVEGAP
|
Get Saved Results Objects in Gap Analysis | ||||
| 35 |
RM_GAP_GET_SAVED_RESULTS
|
Get Saved Results Objects in Gap Analysis | ||||
| 36 |
RM_GAP_MATURITY_SCENARIO_IST
|
RM Gap: Use of a due date scenario on actual result of gap analysis | ||||
| 37 |
RM_GAP_MATURITY_SCENARIO_SIM
|
RM ALM: Use of a due date scenario on simulated results | ||||
| 38 |
RM_GET_GLOBAL_DATA_FOR_M_SC ET_JBRSAVEGAP STRUCTURE JBRSAVEGAP OPTIONAL
|
RM ALM: Get the interim gap results from the global memory | ||||
| 39 |
RM_GET_GLOBAL_DATA_FOR_M_SC
|
RM ALM: Get the interim gap results from the global memory | ||||
| 40 |
RM_GET_GLOBAL_DATA_FOR_M_SC ET_JBRSAVEGAP_SIM_FAELL STRUCTURE JBRSAVEGAP OPTIONAL
|
RM ALM: Get the interim gap results from the global memory | ||||
| 41 |
RM_GET_GLOBAL_DATA_FOR_M_SC ET_JBRSAVEGAP_IST_FAELL STRUCTURE JBRSAVEGAP OPTIONAL
|
RM ALM: Get the interim gap results from the global memory | ||||
| 42 |
RM_SELECT_REQUESTED_RESULTS C_JBRSAVEGAP STRUCTURE JBRSAVEGAP OPTIONAL
|
RM: Selection of (Interim) Results After Reporting Characteristics | ||||
| 43 |
RM_SELECT_REQUESTED_RESULTS
|
RM: Selection of (Interim) Results After Reporting Characteristics |