Where Used List (Function Module) for SAP ABAP Table JBROBJSAVEGAP (RM: Gap Interim Results for Saving)
SAP ABAP Table
JBROBJSAVEGAP (RM: Gap Interim Results for Saving) is used by
# | Object Type | Object Name | Object Description | Package | Structure Package | Software Component |
---|---|---|---|---|---|---|
![]() |
![]() |
![]() |
![]() |
![]() |
||
1 | ![]() |
GAP_LZB_TASK
|
Generation of Temporary Results Structure in Maturity Band | ![]() |
![]() |
![]() |
2 | ![]() |
GAP_LZB_TASK I_JBROBJSAVEGAP STRUCTURE JBROBJSAVEGAP OPTIONAL
|
Generation of Temporary Results Structure in Maturity Band | ![]() |
![]() |
![]() |
3 | ![]() |
GAP_MULTI_TASK I_JBROBJSAVEGAP STRUCTURE JBROBJSAVEGAP OPTIONAL
|
Parallel Processing: Call in Multi-Task Parallel Mode | ![]() |
![]() |
![]() |
4 | ![]() |
GAP_MULTI_TASK
|
Parallel Processing: Call in Multi-Task Parallel Mode | ![]() |
![]() |
![]() |
5 | ![]() |
GAP_PROCESS_TASK I_JBROBJSAVEGAP STRUCTURE JBROBJSAVEGAP OPTIONAL
|
Parallel Processing: Processing of a Separate Task | ![]() |
![]() |
![]() |
6 | ![]() |
GAP_SCHEDULE_TASK I_JBROBJSAVEGAP STRUCTURE JBROBJSAVEGAP OPTIONAL
|
Parallel Processing: Scheduler for Evaluation Tasks | ![]() |
![]() |
![]() |
7 | ![]() |
GAP_SINGLE_TASK I_JBROBJSAVEGAP STRUCTURE JBROBJSAVEGAP OPTIONAL
|
Parallel Processing: Call in Single Task Mode | ![]() |
![]() |
![]() |
8 | ![]() |
ISB_CONDENSE_ZWERG E_JBROBJSAVEGAP STRUCTURE JBROBJSAVEGAP OPTIONAL
|
IS-B: Aggregates the interim results for saving | ![]() |
![]() |
![]() |
9 | ![]() |
ISB_CONDENSE_ZWERG
|
IS-B: Aggregates the interim results for saving | ![]() |
![]() |
![]() |
10 | ![]() |
ISB_FILL_GAP_STRUCTURE_2 I_JBROBJSAVEGAP STRUCTURE JBROBJSAVEGAP OPTIONAL
|
IS-B: RM Filterinf of Analysis Cash Flows for Gap Evaluations | ![]() |
![]() |
![]() |
11 | ![]() |
ISB_FILL_GAP_STRUCTURE_2
|
IS-B: RM Filterinf of Analysis Cash Flows for Gap Evaluations | ![]() |
![]() |
![]() |
12 | ![]() |
ISB_GAP_ANALYSIS E_JBROBJSAVEGAP STRUCTURE JBROBJSAVEGAP OPTIONAL
|
IS-B: RM Analysis of Risk Objects | ![]() |
![]() |
![]() |
13 | ![]() |
RM_EVAL_PROCESS_BACK E_EOOBJGAP STRUCTURE JBROBJSAVEGAP OPTIONAL
|
Parallel Processing: Processing of a Separate Back Testing Task | ![]() |
![]() |
![]() |
14 | ![]() |
RM_EVAL_PROCESS_TASK E_EOOBJGAP STRUCTURE JBROBJSAVEGAP OPTIONAL
|
Parallel Processing: Processing of a Separate Task | ![]() |
![]() |
![]() |
15 | ![]() |
RM_FIMA_EVAL E_EOOBJSGAP STRUCTURE JBROBJSAVEGAP OPTIONAL
|
RM-FIMA: Call of All Evaluation Categories | ![]() |
![]() |
![]() |
16 | ![]() |
RM_GAP_AGGREGATE_LZB I_JBROBJSAVEGAP STRUCTURE JBROBJSAVEGAP OPTIONAL
|
Aggregates the results to a maturity band | ![]() |
![]() |
![]() |
17 | ![]() |
RM_GAP_CALC IT_JBROBJSAVEGAP STRUCTURE JBROBJSAVEGAP OPTIONAL
|
Gets the original gap analysis results | ![]() |
![]() |
![]() |
18 | ![]() |
RM_GAP_EVAL
|
IS-B: RM Gap Analysis | ![]() |
![]() |
![]() |