Where Used List (Class) for SAP ABAP Table /MRSS/T_OPT_GEN_ASSIGNMENT (Optimized Assignment)
SAP ABAP Table
/MRSS/T_OPT_GEN_ASSIGNMENT (Optimized Assignment) is used by
| # | Object Type | Object Name | Object Description | Package | Structure Package | Software Component |
|---|---|---|---|---|---|---|
| 1 |
/MRSS/CL_FNC_MULTI_ASSIGNMENT Method: OPTIMIZE
|
Automatic Scheduling of Multiday Assignments | ||||
| 2 |
/MRSS/CL_OPT_ABSTRACT_ANALYSIS Method: ADD_ASSIGNMENTS
|
Analysing optimization runs | ||||
| 3 |
/MRSS/CL_OPT_ABSTRACT_OPTIMIZE Method: GET_DEMAND
|
Optimizer | ||||
| 4 |
/MRSS/CL_OPT_ABSTRACT_OPTIMIZE Method: GET_OPEN_DEMANDS
|
Optimizer | ||||
| 5 | /MRSS/CL_OPT_ABSTRACT_OPTIMIZE | Optimizer | ||||
| 6 |
/MRSS/CL_OPT_ABSTRACT_OPTIMIZE Method: GET_APPOINTMENTS
|
Optimizer | ||||
| 7 |
/MRSS/CL_OPT_ABSTRACT_OPTIMIZE Method: ADD_ASSIGNMENT_TO_RESOURCE
|
Optimizer | ||||
| 8 |
/MRSS/CL_OPT_ABSTRACT_OPTIMIZE Method: REVOKE_LOCKS
|
Optimizer | ||||
| 9 |
/MRSS/CL_OPT_ABSTRACT_OPTIMIZE Method: CHECK_ASSIGNMENT_TRAVEL_TIME
|
Optimizer | ||||
| 10 |
/MRSS/CL_OPT_ABSTRACT_OPTIMIZE Method: DELETE_OLD_ASSIGNMENTS
|
Optimizer | ||||
| 11 |
/MRSS/CL_OPT_ABSTRACT_OPTIMIZE Method: FLUSH_OPTIMIZED_ASSIGNMENT
|
Optimizer | ||||
| 12 |
/MRSS/CL_OPT_ABSTRACT_OPTIMIZE Method: GET_EXISTING_ASSIGNMENTS
|
Optimizer | ||||
| 13 |
/MRSS/CL_OPT_ABSTRACT_OPTIMIZE Method: BUILD_GENERIC_ASSIGNMENT
|
Optimizer | ||||
| 14 | /MRSS/CL_OPT_ABSTRACT_OPTIMIZE | Optimizer | ||||
| 15 |
/MRSS/CL_OPT_ABSTRACT_OPTIMIZE Method: GET_OPTIMIZED_ASSIGNMENTS
|
Optimizer | ||||
| 16 |
/MRSS/CL_OPT_ABSTRACT_OPTIMIZE Method: ROUND_OPTIMIZED_ASSIGNMENT
|
Optimizer | ||||
| 17 |
/MRSS/CL_RMS_ASSIGNMENT Method: /MRSS/IF_RMS_ASSIGNMENT~ASSIGNMENT_SIMULATE_MRS
|
Scheduling different Assignment | ||||
| 18 |
/MRSS/CL_RMS_ASSIGNMENT_DIR Method: /MRSS/IF_RMS_ASSIGNMENT_DIR~ASSIGNMENTS_SIMULATE_MRS
|
/MRSS/CL_RMS_ASSIGNMENT_DIR | ||||
| 19 |
/MRSS/CL_SGE_APPLICATION Method: SCHEDULE_IT
|
Scheduling Engine Application. | ||||
| 20 |
/MRSS/CL_SGE_APPLICATION Method: OPTIMIZE_IT_AFTER
|
Scheduling Engine Application. | ||||
| 21 |
/MRSS/CL_SGE_APPLICATION_MNT Method: /MRSS/IF_SGE_MNT_RESOURCES~ASSIGNMENT_MAINTAIN_EXT
|
Scheduling Engine Application: Planning Board | ||||
| 22 |
/MRSS/CL_SGE_APPLICATION_MNT Method: /MRSS/IF_SGE_MNT_RESOURCES~ASSIGNMENT_MAINTAIN
|
Scheduling Engine Application: Planning Board |