Where Used List (Class) for SAP ABAP Data Element /MRSS/T_SGE_DURATION_UNIT (Unit for the Transaction Duration)
SAP ABAP Data Element
/MRSS/T_SGE_DURATION_UNIT (Unit for the Transaction Duration) is used by
| # | Object Type | Object Name | Object Description | Package | Structure Package | Software Component |
|---|---|---|---|---|---|---|
| 1 | /MRSS/CL_CAG_CAPACITY_RES_PN | OBSOLETE - Capacity Graph for Planning nodes | ||||
| 2 | /MRSS/CL_CAG_INTEGRAL | Graph Integral | ||||
| 3 |
/MRSS/CL_DPR_EXTBL Method: /MRSS/IF_SGE_EXTBL_CHECK~GET_PROPOSED_ASG_DATES
|
Checks for cProjects | ||||
| 4 | /MRSS/CL_OPT_ABSTRACT_ANALYSIS | Analysing optimization runs | ||||
| 5 |
/MRSS/CL_OPT_ABSTRACT_OPTIMIZE Method: DETERMINE_FIXED_ATTRIBUTES
|
Optimizer | ||||
| 6 |
/MRSS/CL_OPT_ABSTRACT_OPTIMIZE Method: ADD_DEMAND
|
Optimizer | ||||
| 7 |
/MRSS/CL_OPT_ABSTRACT_OPTIMIZE Method: ADD_ASSIGNMENT_TO_RESOURCE
|
Optimizer | ||||
| 8 |
/MRSS/CL_RAC_EXTBL_CS Method: /MRSS/IF_SGE_EXTBL_CHECK~GET_PROPOSED_ASG_DATES
|
Checks for CS assignments | ||||
| 9 |
/MRSS/CL_RAP_EXTBL_PS Method: /MRSS/IF_SGE_EXTBL_CHECK~GET_PROPOSED_ASG_DATES
|
Checks for PS Assignment and Demand | ||||
| 10 |
/MRSS/CL_RM_RES_CAPACITY Method: TABLE_CHECK_KAPA
|
Resource capacity | ||||
| 11 |
/MRSS/CL_SGD_DEMAND_MGR Method: /MRSS/IF_SGE_DEMANDS~DEMANDS_MAINTAIN
|
Demand Manager | ||||
| 12 |
/MRSS/CL_SGD_SINGLE_DEMAND Method: /MRSS/IF_SGE_COMMAND_RECEIVER~ACTION
|
Demand | ||||
| 13 |
/MRSS/CL_SGD_WL_GEN Method: /MRSS/IF_SGE_WL_ATT~ATTRIBUTES_DETERMINE
|
Read Attributes from Generic Demand | ||||
| 14 | /MRSS/CL_SGE_APPLICATION | Scheduling Engine Application. | ||||
| 15 |
/MRSS/CL_SGE_APPLICATION_MNT Method: /MRSS/IF_SGE_MNT_AVAILABILITY~MATCH_DEMAND_TO_RESOURCE
|
Scheduling Engine Application: Planning Board | ||||
| 16 |
/MRSS/CL_SGE_APPLICATION_PLB Method: /MRSS/IF_SGE_FACADE~DEMANDS_GET
|
Scheduling Engine Application: Planning Board | ||||
| 17 |
/MRSS/CL_SGE_APPLICATION_PLB Method: /MRSS/IF_SGE_FACADE~PROCESS_DEMAND_DATES
|
Scheduling Engine Application: Planning Board | ||||
| 18 |
/MRSS/CL_SGE_ASSIGNMENT Method: UPDATE_ASG_PROCESS_TIME
|
Scheduling Engine Assignment | ||||
| 19 |
/MRSS/CL_SGE_ASSIGNMENT Method: CALCULATE_DURATION_FROM_DEMAND
|
Scheduling Engine Assignment | ||||
| 20 |
/MRSS/CL_SGE_ASSIGNMENT Method: MODIFY_TEAM_ASSIGNMENT
|
Scheduling Engine Assignment | ||||
| 21 |
/MRSS/CL_SGE_ASSIGNMENT Method: CHECK_TRAVEL_TIME_DATA
|
Scheduling Engine Assignment | ||||
| 22 |
/MRSS/CL_SGE_ASSIGNMENT Method: CHECK_PROCESS_TIME_DATA
|
Scheduling Engine Assignment | ||||
| 23 |
/MRSS/CL_SGE_ASSIGNMENT_CAPA Method: COMPLETE_DATES
|
Capacitive assignment class | ||||
| 24 |
/MRSS/CL_SGE_ASSIGNMENT_CAPA Method: MODIFY_TEAM_ASSIGNMENT
|
Capacitive assignment class | ||||
| 25 |
/MRSS/CL_SGE_ASSIGNMENT_CONC Method: COMPLETE_DATES
|
Specific assignemnt class for Concrete assignment | ||||
| 26 |
/MRSS/CL_SGE_ASSIGNMENT_CONC Method: COMPLETE_TOOL_DATES
|
Specific assignemnt class for Concrete assignment | ||||
| 27 | /MRSS/CL_SGE_ASSIGNMENT_MOD | Collection of assignment modifiying methods | ||||
| 28 |
/MRSS/CL_SGE_ASSIGNMENT_MOD Method: SHIFT_INTELLIGENT
|
Collection of assignment modifiying methods | ||||
| 29 |
/MRSS/CL_SGE_ASSIGNMENT_STR Method: SIMULATE_PART_CONCRETIZATION
|
Assignment specific class for stretched assignments | ||||
| 30 |
/MRSS/CL_SGE_ASSIGNMENT_STR Method: COMPLETE_DATES
|
Assignment specific class for stretched assignments | ||||
| 31 |
/MRSS/CL_SGE_RESOURCE_MGR Method: QUALIFICATION_MATCH
|
Scheduling Engine: Resource Manager | ||||
| 32 |
/MRSS/CL_SGE_RES_CAPACITY Method: TABLE_CHECK_KAPA
|
Resource Capacity | ||||
| 33 |
/MRSS/CL_SGE_SHIFT_SERV Method: GET_ASSIGNMENT_DURATION
|
Shifting Services | ||||
| 34 | /MRSS/CL_SGE_TIME_GRAN_SER | Service Methods for Time Granularity | ||||
| 35 | /MRSS/CL_SGE_TIME_GRAN_SER | Service Methods for Time Granularity | ||||
| 36 |
/MRSS/CL_SGR_BL_SUMMARISE Method: GET_CUMM_DATA_WORKLIST
|
Summarizes Raw Data and Forms Totals | ||||
| 37 |
/MRSS/CL_SGU_IL_DETAILS Method: MULTIPLE_ASSIGNMENTS
|
Planning Board: User Interface Control Wrapper | ||||
| 38 | /MRSS/CL_SGU_IL_DETAILS | Planning Board: User Interface Control Wrapper | ||||
| 39 |
/MRSS/CL_SGU_IL_PLANNINGBOARD Method: CAPA_ASSGN_DEFAULT_DATE_GET
|
Planning Board: UI Diagram | ||||
| 40 |
/MRSS/CL_SGU_IL_PLANNINGBOARD Method: ASSIGNMENT_CREATE
|
Planning Board: UI Diagram | ||||
| 41 |
/MRSS/CL_SGU_IL_PLANNINGBOARD Method: PLANITEM_DETAILS_DISPLAY
|
Planning Board: UI Diagram | ||||
| 42 |
/MRSS/CL_SGU_IL_PLANNINGBOARD Method: ASSIGNMENT_CREATE_MULTI
|
Planning Board: UI Diagram | ||||
| 43 |
/MRSS/CL_SGU_IL_RES_GANTT Method: /MRSS/IF_SGU_IL_GANTT~PLANITEM_CHANGE
|
Resource Based Gantt | ||||
| 44 |
/MRSS/CL_SGU_IL_RES_GANTT Method: DEMAND_MATCH_FOR_RESOURCE
|
Resource Based Gantt | ||||
| 45 |
/MRSS/CL_SGU_IL_RES_GANTT Method: SHOW_BEST_FIT
|
Resource Based Gantt | ||||
| 46 | /MRSS/CL_SGU_IL_WORKSTOCK | Planning Board: UI Diagram | ||||
| 47 |
/MRSS/CL_SGU_IL_WORKSTOCK Method: QUALIFICATION_MATCH
|
Planning Board: UI Diagram | ||||
| 48 | /MRSS/CL_SGW_IL_LEAN_PLB | Lean Planning Board | ||||
| 49 | /MRSS/CL_SOS_SHIFT_PLAN | Shift Schedule for a Node | ||||
| 50 | /MRSS/CL_SOS_SHIFT_PLAN | Shift Schedule for a Node | ||||
| 51 | /MRSS/CL_SOS_UTILITIES | Resource-Independent Scheduling | ||||
| 52 |
/MRSS/CL_SQE_QUALIFICATION_ENG Method: QUALIF_MATCH_DEMAND
|
Qualification engine | ||||
| 53 |
/MRSS/CL_SQE_QUALIF_TOOLS Method: GET_TRAVEL_DETAILS
|
Diverse tools for matching |