Table/Structure Field list used by SAP ABAP View MA61V (Material Master: DB View for MRP)
SAP ABAP View
MA61V (Material Master: DB View for MRP) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
MARA - ATTYP | Material Category | |
2 | ![]() |
MARA - ATTYP | Material Category | |
3 | ![]() |
MARA - BFLME | Generic Material with Logistical Variants | |
4 | ![]() |
MARA - BFLME | Generic Material with Logistical Variants | |
5 | ![]() |
MARA - BSTME | Order unit | |
6 | ![]() |
MARA - BSTME | Order unit | |
7 | ![]() |
MARA - CUOBF | Internal object number | |
8 | ![]() |
MARA - CUOBF | Internal object number | |
9 | ![]() |
MARA - DISST | Low-level code | |
10 | ![]() |
MARA - DISST | Low-level code | |
11 | ![]() |
MARA - KZEFF | Assign effectivity parameter values/ override change numbers | |
12 | ![]() |
MARA - KZEFF | Assign effectivity parameter values/ override change numbers | |
13 | ![]() |
MARA - KZKFG | Configurable Material | |
14 | ![]() |
MARA - KZKFG | Configurable Material | |
15 | ![]() |
MARA - KZREV | Indicator: revision level has been assigned to the material | |
16 | ![]() |
MARA - KZREV | Indicator: revision level has been assigned to the material | |
17 | ![]() |
MARA - KZWSM | Units of measure usage | |
18 | ![]() |
MARA - KZWSM | Units of measure usage | |
19 | ![]() |
MARA - MANDT | Client | |
20 | ![]() |
MARA - MANDT | Client | |
21 | ![]() |
MARA - MATKL | Material Group | |
22 | ![]() |
MARA - MATKL | Material Group | |
23 | ![]() |
MARA - MATNR | Material Number | |
24 | ![]() |
MARA - MATNR | Material Number | |
25 | ![]() |
MARA - MEINS | Base Unit of Measure | |
26 | ![]() |
MARA - MEINS | Base Unit of Measure | |
27 | ![]() |
MARA - MFRNR | Manufacturer number | |
28 | ![]() |
MARA - MFRNR | Manufacturer number | |
29 | ![]() |
MARA - MFRPN | Manufacturer Part Number | |
30 | ![]() |
MARA - MFRPN | Manufacturer Part Number | |
31 | ![]() |
MARA - MPROF | Mfr part profile | |
32 | ![]() |
MARA - MPROF | Mfr part profile | |
33 | ![]() |
MARA - MSTAE | Cross-Plant Material Status | |
34 | ![]() |
MARA - MSTAE | Cross-Plant Material Status | |
35 | ![]() |
MARA - MSTDE | Date from which the cross-plant material status is valid | |
36 | ![]() |
MARA - MSTDE | Date from which the cross-plant material status is valid | |
37 | ![]() |
MARA - MTART | Material type | |
38 | ![]() |
MARA - MTART | Material type | |
39 | ![]() |
MARA - SATNR | Cross-Plant Configurable Material | |
40 | ![]() |
MARA - SATNR | Cross-Plant Configurable Material | |
41 | ![]() |
MARA - SERLV | Level of Explicitness for Serial Number | |
42 | ![]() |
MARA - SERLV | Level of Explicitness for Serial Number | |
43 | ![]() |
MARA - SPART | Division | |
44 | ![]() |
MARA - SPART | Division | |
45 | ![]() |
MARC - AHDIS | MRP relevancy for dependent requirements | |
46 | ![]() |
MARC - AHDIS | MRP relevancy for dependent requirements | |
47 | ![]() |
MARC - ALTSL | Method for Selecting Alternative Bills of Material | |
48 | ![]() |
MARC - ALTSL | Method for Selecting Alternative Bills of Material | |
49 | ![]() |
MARC - APOKZ | Indicator: Is material relevant for APO | |
50 | ![]() |
MARC - APOKZ | Indicator: Is material relevant for APO | |
51 | ![]() |
MARC - AUFTL | Splitting Indicator | |
52 | ![]() |
MARC - AUFTL | Splitting Indicator | |
53 | ![]() |
MARC - AUSDT | Effective-out date | |
54 | ![]() |
MARC - AUSDT | Effective-out date | |
55 | ![]() |
MARC - AUSME | Unit of issue | |
56 | ![]() |
MARC - AUSME | Unit of issue | |
57 | ![]() |
MARC - AUSSS | Assembly scrap in percent | |
58 | ![]() |
MARC - AUSSS | Assembly scrap in percent | |
59 | ![]() |
MARC - BASMG | Base quantity | |
60 | ![]() |
MARC - BASMG | Base quantity | |
61 | ![]() |
MARC - BEARZ | Processing time | |
62 | ![]() |
MARC - BEARZ | Processing time | |
63 | ![]() |
MARC - BESKZ | Procurement Type | |
64 | ![]() |
MARC - BESKZ | Procurement Type | |
65 | ![]() |
MARC - BSTFE | Fixed lot size | |
66 | ![]() |
MARC - BSTFE | Fixed lot size | |
67 | ![]() |
MARC - BSTMA | Maximum lot size | |
68 | ![]() |
MARC - BSTMA | Maximum lot size | |
69 | ![]() |
MARC - BSTMI | Minimum lot size | |
70 | ![]() |
MARC - BSTMI | Minimum lot size | |
71 | ![]() |
MARC - BSTRF | Rounding value for purchase order quantity | |
72 | ![]() |
MARC - BSTRF | Rounding value for purchase order quantity | |
73 | ![]() |
MARC - BWESB | Valuated Goods Receipt Blocked Stock | |
74 | ![]() |
MARC - BWESB | Valuated Goods Receipt Blocked Stock | |
75 | ![]() |
MARC - BWSCL | Source of Supply | |
76 | ![]() |
MARC - BWSCL | Source of Supply | |
77 | ![]() |
MARC - CUOBJ | Internal object number | |
78 | ![]() |
MARC - CUOBJ | Internal object number | |
79 | ![]() |
MARC - CUOBV | Internal object number of configurable material for planning | |
80 | ![]() |
MARC - CUOBV | Internal object number of configurable material for planning | |
81 | ![]() |
MARC - DIBER | Indicator: MRP area exists | |
82 | ![]() |
MARC - DIBER | Indicator: MRP area exists | |
83 | ![]() |
MARC - DISGR | MRP Group | |
84 | ![]() |
MARC - DISGR | MRP Group | |
85 | ![]() |
MARC - DISLS | Lot size (materials planning) | |
86 | ![]() |
MARC - DISLS | Lot size (materials planning) | |
87 | ![]() |
MARC - DISMM | MRP Type | |
88 | ![]() |
MARC - DISMM | MRP Type | |
89 | ![]() |
MARC - DISPO | MRP controller | |
90 | ![]() |
MARC - DISPO | MRP controller | |
91 | ![]() |
MARC - DPLFS | Fair share rule | |
92 | ![]() |
MARC - DPLFS | Fair share rule | |
93 | ![]() |
MARC - DPLHO | Deployment horizon in days | |
94 | ![]() |
MARC - DPLHO | Deployment horizon in days | |
95 | ![]() |
MARC - DPLPU | Indicator: push distribution | |
96 | ![]() |
MARC - DPLPU | Indicator: push distribution | |
97 | ![]() |
MARC - DZEIT | In-house production time | |
98 | ![]() |
MARC - DZEIT | In-house production time | |
99 | ![]() |
MARC - EISBE | Safety stock | |
100 | ![]() |
MARC - EISBE | Safety stock | |
101 | ![]() |
MARC - EISLO | Minimum Safety Stock | |
102 | ![]() |
MARC - EISLO | Minimum Safety Stock | |
103 | ![]() |
MARC - EKGRP | Purchasing group | |
104 | ![]() |
MARC - EKGRP | Purchasing group | |
105 | ![]() |
MARC - EPRIO | Stock determination group | |
106 | ![]() |
MARC - EPRIO | Stock determination group | |
107 | ![]() |
MARC - EXPME | Unit of measure for commodity code (foreign trade) | |
108 | ![]() |
MARC - EXPME | Unit of measure for commodity code (foreign trade) | |
109 | ![]() |
MARC - FABKZ | Indicator: Item Relevant to JIT Delivery Schedules | |
110 | ![]() |
MARC - FABKZ | Indicator: Item Relevant to JIT Delivery Schedules | |
111 | ![]() |
MARC - FEVOR | Production Supervisor | |
112 | ![]() |
MARC - FEVOR | Production Supervisor | |
113 | ![]() |
MARC - FHORI | Scheduling Margin Key for Floats | |
114 | ![]() |
MARC - FHORI | Scheduling Margin Key for Floats | |
115 | ![]() |
MARC - FRTME | Production unit | |
116 | ![]() |
MARC - FRTME | Production unit | |
117 | ![]() |
MARC - FXHOR | Planning time fence | |
118 | ![]() |
MARC - FXHOR | Planning time fence | |
119 | ![]() |
MARC - INSMK | Post to Inspection Stock | |
120 | ![]() |
MARC - INSMK | Post to Inspection Stock | |
121 | ![]() |
MARC - KAUSF | Component scrap in percent | |
122 | ![]() |
MARC - KAUSF | Component scrap in percent | |
123 | ![]() |
MARC - KZAUS | Discontinuation indicator | |
124 | ![]() |
MARC - KZAUS | Discontinuation indicator | |
125 | ![]() |
MARC - KZBED | Indicator for Requirements Grouping | |
126 | ![]() |
MARC - KZBED | Indicator for Requirements Grouping | |
127 | ![]() |
MARC - KZDIE | Indicator: MRP controller is buyer (deactivated) | |
128 | ![]() |
MARC - KZDIE | Indicator: MRP controller is buyer (deactivated) | |
129 | ![]() |
MARC - KZPSP | Indicator for cross-project material | |
130 | ![]() |
MARC - KZPSP | Indicator for cross-project material | |
131 | ![]() |
MARC - LAGPR | Storage costs indicator | |
132 | ![]() |
MARC - LAGPR | Storage costs indicator | |
133 | ![]() |
MARC - LFRHY | Planning cycle | |
134 | ![]() |
MARC - LFRHY | Planning cycle | |
135 | ![]() |
MARC - LGFSB | Default storage location for external procurement | |
136 | ![]() |
MARC - LGFSB | Default storage location for external procurement | |
137 | ![]() |
MARC - LGPRO | Issue storage location | |
138 | ![]() |
MARC - LGPRO | Issue storage location | |
139 | ![]() |
MARC - LOSFX | Ordering costs | |
140 | ![]() |
MARC - LOSFX | Ordering costs | |
141 | ![]() |
MARC - LVORM | Flag Material for Deletion at Plant Level | |
142 | ![]() |
MARC - LVORM | Flag Material for Deletion at Plant Level | |
143 | ![]() |
MARC - MAABC | ABC indicator | |
144 | ![]() |
MARC - MAABC | ABC indicator | |
145 | ![]() |
MARC - MABST | Maximum stock level | |
146 | ![]() |
MARC - MABST | Maximum stock level | |
147 | ![]() |
MARC - MDACH | Action control: planned order processing | |
148 | ![]() |
MARC - MDACH | Action control: planned order processing | |
149 | ![]() |
MARC - MINBE | Reorder point | |
150 | ![]() |
MARC - MINBE | Reorder point | |
151 | ![]() |
MARC - MISKZ | Mixed MRP indicator | |
152 | ![]() |
MARC - MISKZ | Mixed MRP indicator | |
153 | ![]() |
MARC - MMSTA | Plant-Specific Material Status | |
154 | ![]() |
MARC - MMSTA | Plant-Specific Material Status | |
155 | ![]() |
MARC - MMSTD | Date from which the plant-specific material status is valid | |
156 | ![]() |
MARC - MMSTD | Date from which the plant-specific material status is valid | |
157 | ![]() |
MARC - MRPPP | PPC planning calendar | |
158 | ![]() |
MARC - MRPPP | PPC planning calendar | |
159 | ![]() |
MARC - MTVFP | Checking Group for Availability Check | |
160 | ![]() |
MARC - MTVFP | Checking Group for Availability Check | |
161 | ![]() |
MARC - NFMAT | Follow-up material | |
162 | ![]() |
MARC - NFMAT | Follow-up material | |
163 | ![]() |
MARC - PERIV | Fiscal Year Variant | |
164 | ![]() |
MARC - PERIV | Fiscal Year Variant | |
165 | ![]() |
MARC - PERKZ | Period indicator | |
166 | ![]() |
MARC - PERKZ | Period indicator | |
167 | ![]() |
MARC - PFREI | Indicator: automatic fixing of planned orders | |
168 | ![]() |
MARC - PFREI | Indicator: automatic fixing of planned orders | |
169 | ![]() |
MARC - PLIFZ | Planned delivery time in days | |
170 | ![]() |
MARC - PLIFZ | Planned delivery time in days | |
171 | ![]() |
MARC - PRCTR | Profit Center | |
172 | ![]() |
MARC - PRCTR | Profit Center | |
173 | ![]() |
MARC - PSTAT | Maintenance status | |
174 | ![]() |
MARC - PSTAT | Maintenance status | |
175 | ![]() |
MARC - QMATV | Inspection Setup Exists for Material/Plant | |
176 | ![]() |
MARC - QMATV | Inspection Setup Exists for Material/Plant | |
177 | ![]() |
MARC - RDPRF | Rounding Profile | |
178 | ![]() |
MARC - RDPRF | Rounding Profile | |
179 | ![]() |
MARC - RESVP | Period of adjustment for planned independent requirements | |
180 | ![]() |
MARC - RESVP | Period of adjustment for planned independent requirements | |
181 | ![]() |
MARC - RUEZT | Setup and teardown time | |
182 | ![]() |
MARC - RUEZT | Setup and teardown time | |
183 | ![]() |
MARC - RWPRO | Range of coverage profile | |
184 | ![]() |
MARC - RWPRO | Range of coverage profile | |
185 | ![]() |
MARC - SAUFT | Ind.: Repetitive mfg allowed | |
186 | ![]() |
MARC - SAUFT | Ind.: Repetitive mfg allowed | |
187 | ![]() |
MARC - SBDKZ | Dependent requirements ind. for individual and coll. reqmts | |
188 | ![]() |
MARC - SBDKZ | Dependent requirements ind. for individual and coll. reqmts | |
189 | ![]() |
MARC - SCHGT | Indicator: bulk material | |
190 | ![]() |
MARC - SCHGT | Indicator: bulk material | |
191 | ![]() |
MARC - SERNP | Serial Number Profile | |
192 | ![]() |
MARC - SERNP | Serial Number Profile | |
193 | ![]() |
MARC - SFEPR | Repetitive manufacturing profile | |
194 | ![]() |
MARC - SFEPR | Repetitive manufacturing profile | |
195 | ![]() |
MARC - SHFLG | Safety time indicator (with or without safety time) | |
196 | ![]() |
MARC - SHFLG | Safety time indicator (with or without safety time) | |
197 | ![]() |
MARC - SHPRO | Period profile for safety time | |
198 | ![]() |
MARC - SHPRO | Period profile for safety time | |
199 | ![]() |
MARC - SHZET | Safety time (in workdays) | |
200 | ![]() |
MARC - SHZET | Safety time (in workdays) | |
201 | ![]() |
MARC - SOBSL | Special procurement type | |
202 | ![]() |
MARC - SOBSL | Special procurement type | |
203 | ![]() |
MARC - STDPD | Configurable material | |
204 | ![]() |
MARC - STDPD | Configurable material | |
205 | ![]() |
MARC - STRGR | Planning strategy group | |
206 | ![]() |
MARC - STRGR | Planning strategy group | |
207 | ![]() |
MARC - TAKZT | Takt time | |
208 | ![]() |
MARC - TAKZT | Takt time | |
209 | ![]() |
MARC - TRAME | Stock in transit | |
210 | ![]() |
MARC - TRAME | Stock in transit | |
211 | ![]() |
MARC - TRANZ | Interoperation time | |
212 | ![]() |
MARC - TRANZ | Interoperation time | |
213 | ![]() |
MARC - UMLMC | Stock in transfer (plant to plant) | |
214 | ![]() |
MARC - UMLMC | Stock in transfer (plant to plant) | |
215 | ![]() |
MARC - USEQU | Quota arrangement usage | |
216 | ![]() |
MARC - USEQU | Quota arrangement usage | |
217 | ![]() |
MARC - VINT1 | Consumption period: backward | |
218 | ![]() |
MARC - VINT1 | Consumption period: backward | |
219 | ![]() |
MARC - VINT2 | Consumption period: forward | |
220 | ![]() |
MARC - VINT2 | Consumption period: forward | |
221 | ![]() |
MARC - VRMOD | Consumption mode | |
222 | ![]() |
MARC - VRMOD | Consumption mode | |
223 | ![]() |
MARC - VSPVB | Proposed Supply Area in Material Master Record | |
224 | ![]() |
MARC - VSPVB | Proposed Supply Area in Material Master Record | |
225 | ![]() |
MARC - WEBAZ | Goods receipt processing time in days | |
226 | ![]() |
MARC - WEBAZ | Goods receipt processing time in days | |
227 | ![]() |
MARC - WERKS | Plant | |
228 | ![]() |
MARC - WERKS | Plant | |
229 | ![]() |
MARC - WZEIT | Total replenishment lead time (in workdays) | |
230 | ![]() |
MARC - WZEIT | Total replenishment lead time (in workdays) | |
231 | ![]() |
MARC - XCHPF | Batch management requirement indicator | |
232 | ![]() |
MARC - XCHPF | Batch management requirement indicator |