1 | Table/Structure Field | AFVC - APLZL | General counter for order | |
2 | Table/Structure Field | AFVC - APLZL | General counter for order | |
3 | Table/Structure Field | AFVC - ARBID | Object ID of the resource | |
4 | Table/Structure Field | AFVC - ARBID | Object ID of the resource | |
5 | Table/Structure Field | AFVC - AUFPL | Routing number of operations in the order | |
6 | Table/Structure Field | AFVC - AUFPL | Routing number of operations in the order | |
7 | Table/Structure Field | AFVC - BEDID | ID of the capacity requirements record | |
8 | Table/Structure Field | AFVC - BEDID | ID of the capacity requirements record | |
9 | Table/Structure Field | AFVC - BEDZL | Internal counter | |
10 | Table/Structure Field | AFVC - BEDZL | Internal counter | |
11 | Table/Structure Field | AFVC - BUKRS | Company Code | |
12 | Table/Structure Field | AFVC - BUKRS | Company Code | |
13 | Table/Structure Field | AFVC - CY_SEQNRV | Sequence number operation | |
14 | Table/Structure Field | AFVC - CY_SEQNRV | Sequence number operation | |
15 | Table/Structure Field | AFVC - LOART | Wage type | |
16 | Table/Structure Field | AFVC - LOART | Wage type | |
17 | Table/Structure Field | AFVC - LOGRP | Wage group | |
18 | Table/Structure Field | AFVC - LOGRP | Wage group | |
19 | Table/Structure Field | AFVC - LTXA1 | Operation short text | |
20 | Table/Structure Field | AFVC - LTXA1 | Operation short text | |
21 | Table/Structure Field | AFVC - MANDT | Client | |
22 | Table/Structure Field | AFVC - MANDT | Client | |
23 | Table/Structure Field | AFVC - NPRIO | Priority | |
24 | Table/Structure Field | AFVC - NPRIO | Priority | |
25 | Table/Structure Field | AFVC - OBJNR | Object number | |
26 | Table/Structure Field | AFVC - OBJNR | Object number | |
27 | Table/Structure Field | AFVC - PERNR | Personnel number | |
28 | Table/Structure Field | AFVC - PERNR | Personnel number | |
29 | Table/Structure Field | AFVC - PHFLG | Indicator: Phase | |
30 | Table/Structure Field | AFVC - PHFLG | Indicator: Phase | |
31 | Table/Structure Field | AFVC - PLNAL | Group Counter | |
32 | Table/Structure Field | AFVC - PLNAL | Group Counter | |
33 | Table/Structure Field | AFVC - PLNFL | Sequence | |
34 | Table/Structure Field | AFVC - PLNFL | Sequence | |
35 | Table/Structure Field | AFVC - PLNKN | Number of the task list node | |
36 | Table/Structure Field | AFVC - PLNKN | Number of the task list node | |
37 | Table/Structure Field | AFVC - PLNNR | Key for Task List Group | |
38 | Table/Structure Field | AFVC - PLNNR | Key for Task List Group | |
39 | Table/Structure Field | AFVC - PLNTY | Task List Type | |
40 | Table/Structure Field | AFVC - PLNTY | Task List Type | |
41 | Table/Structure Field | AFVC - PROJN | Work breakdown structure element (WBS element) | |
42 | Table/Structure Field | AFVC - PROJN | Work breakdown structure element (WBS element) | |
43 | Table/Structure Field | AFVC - QUALF | Suitability | |
44 | Table/Structure Field | AFVC - QUALF | Suitability | |
45 | Table/Structure Field | AFVC - RASCH | Setup Type Key | |
46 | Table/Structure Field | AFVC - RASCH | Setup Type Key | |
47 | Table/Structure Field | AFVC - RFGRP | Setup group category | |
48 | Table/Structure Field | AFVC - RFGRP | Setup group category | |
49 | Table/Structure Field | AFVC - RFSCH | Setup group key | |
50 | Table/Structure Field | AFVC - RFSCH | Setup group key | |
51 | Table/Structure Field | AFVC - RUECK | Completion confirmation number for the operation | |
52 | Table/Structure Field | AFVC - RUECK | Completion confirmation number for the operation | |
53 | Table/Structure Field | AFVC - SUMNR | Node number of the superior operation | |
54 | Table/Structure Field | AFVC - SUMNR | Node number of the superior operation | |
55 | Table/Structure Field | AFVC - VERTL | Distr.cap.reqmts (plant maint.,process order, network) | |
56 | Table/Structure Field | AFVC - VERTL | Distr.cap.reqmts (plant maint.,process order, network) | |
57 | Table/Structure Field | AFVC - VORNR | Operation/Activity Number | |
58 | Table/Structure Field | AFVC - VORNR | Operation/Activity Number | |
59 | Table/Structure Field | AFVC - WERKS | Plant | |
60 | Table/Structure Field | AFVC - WERKS | Plant | |
61 | Table/Structure Field | AFVU - SLWID | Key word ID for user-defined fields | |
62 | Table/Structure Field | AFVU - SLWID | Key word ID for user-defined fields | |
63 | Table/Structure Field | AFVU - USE04 | User field: Unit for quantity fields | |
64 | Table/Structure Field | AFVU - USE04 | User field: Unit for quantity fields | |
65 | Table/Structure Field | AFVU - USE05 | User field: Unit for quantity fields | |
66 | Table/Structure Field | AFVU - USE05 | User field: Unit for quantity fields | |
67 | Table/Structure Field | AFVU - USE06 | User field: Unit for value fields | |
68 | Table/Structure Field | AFVU - USE06 | User field: Unit for value fields | |
69 | Table/Structure Field | AFVU - USE07 | User field: Unit for value fields | |
70 | Table/Structure Field | AFVU - USE07 | User field: Unit for value fields | |
71 | Table/Structure Field | AFVU - USR00 | User field with 20 characters | |
72 | Table/Structure Field | AFVU - USR00 | User field with 20 characters | |
73 | Table/Structure Field | AFVU - USR01 | User field with 20 characters | |
74 | Table/Structure Field | AFVU - USR01 | User field with 20 characters | |
75 | Table/Structure Field | AFVU - USR02 | User field with 10 characters | |
76 | Table/Structure Field | AFVU - USR02 | User field with 10 characters | |
77 | Table/Structure Field | AFVU - USR03 | User field with 10 characters | |
78 | Table/Structure Field | AFVU - USR03 | User field with 10 characters | |
79 | Table/Structure Field | AFVU - USR04 | User field for quantity (length 10.3) | |
80 | Table/Structure Field | AFVU - USR04 | User field for quantity (length 10.3) | |
81 | Table/Structure Field | AFVU - USR05 | User field for quantity (length 10.3) | |
82 | Table/Structure Field | AFVU - USR05 | User field for quantity (length 10.3) | |
83 | Table/Structure Field | AFVU - USR06 | User-defined field for values (length 10,3) | |
84 | Table/Structure Field | AFVU - USR06 | User-defined field for values (length 10,3) | |
85 | Table/Structure Field | AFVU - USR07 | User-defined field for values (length 10,3) | |
86 | Table/Structure Field | AFVU - USR07 | User-defined field for values (length 10,3) | |
87 | Table/Structure Field | AFVU - USR08 | User field for date | |
88 | Table/Structure Field | AFVU - USR08 | User field for date | |
89 | Table/Structure Field | AFVU - USR09 | User field for date | |
90 | Table/Structure Field | AFVU - USR09 | User field for date | |
91 | Table/Structure Field | AFVU - USR10 | User-defined field: Indicator for reports | |
92 | Table/Structure Field | AFVU - USR10 | User-defined field: Indicator for reports | |
93 | Table/Structure Field | AFVU - USR11 | User-defined field: Indicator for reports | |
94 | Table/Structure Field | AFVU - USR11 | User-defined field: Indicator for reports | |
95 | Table/Structure Field | AFVU - VNAME | Joint venture | |
96 | Table/Structure Field | AFVU - VNAME | Joint venture | |
97 | Table/Structure Field | AFVV - ABRUE | Teardown | |
98 | Table/Structure Field | AFVV - ABRUE | Teardown | |
99 | Table/Structure Field | AFVV - ARBEH | Unit for work | |
100 | Table/Structure Field | AFVV - ARBEH | Unit for work | |
101 | Table/Structure Field | AFVV - ARBEI | Work involved in the activity | |
102 | Table/Structure Field | AFVV - ARBEI | Work involved in the activity | |
103 | Table/Structure Field | AFVV - ARUZE | Unit of measure for teardown | |
104 | Table/Structure Field | AFVV - ARUZE | Unit of measure for teardown | |
105 | Table/Structure Field | AFVV - ASVRG | Operation scrap | |
106 | Table/Structure Field | AFVV - ASVRG | Operation scrap | |
107 | Table/Structure Field | AFVV - BEARZ | Processing time | |
108 | Table/Structure Field | AFVV - BEARZ | Processing time | |
109 | Table/Structure Field | AFVV - BEAZE | Unit of measure for processing time | |
110 | Table/Structure Field | AFVV - BEAZE | Unit of measure for processing time | |
111 | Table/Structure Field | AFVV - DAUNE | Normal duration/unit | |
112 | Table/Structure Field | AFVV - DAUNE | Normal duration/unit | |
113 | Table/Structure Field | AFVV - DAUNO | Normal duration of the activity | |
114 | Table/Structure Field | AFVV - DAUNO | Normal duration of the activity | |
115 | Table/Structure Field | AFVV - EWDAN | Normal duration (from forecast) of activity | |
116 | Table/Structure Field | AFVV - EWDAN | Normal duration (from forecast) of activity | |
117 | Table/Structure Field | AFVV - EWDNE | Unit for forecast normal duration | |
118 | Table/Structure Field | AFVV - EWDNE | Unit for forecast normal duration | |
119 | Table/Structure Field | AFVV - FSAVD | Earliest scheduled start: Execution (date) | |
120 | Table/Structure Field | AFVV - FSAVD | Earliest scheduled start: Execution (date) | |
121 | Table/Structure Field | AFVV - FSAVZ | Earliest scheduled start: Execution (time) | |
122 | Table/Structure Field | AFVV - FSAVZ | Earliest scheduled start: Execution (time) | |
123 | Table/Structure Field | AFVV - FSEDD | Earliest scheduled finish: Execution (date) | |
124 | Table/Structure Field | AFVV - FSEDD | Earliest scheduled finish: Execution (date) | |
125 | Table/Structure Field | AFVV - FSEDZ | Earliest scheduled finish: Execution (time) | |
126 | Table/Structure Field | AFVV - FSEDZ | Earliest scheduled finish: Execution (time) | |
127 | Table/Structure Field | AFVV - FSELD | Earliest scheduled finish: Wait (date) | |
128 | Table/Structure Field | AFVV - FSELD | Earliest scheduled finish: Wait (date) | |
129 | Table/Structure Field | AFVV - FSELZ | Earliest scheduled finish: Wait (time) | |
130 | Table/Structure Field | AFVV - FSELZ | Earliest scheduled finish: Wait (time) | |
131 | Table/Structure Field | AFVV - FSSAD | Earliest scheduled start: Teardown (date) | |
132 | Table/Structure Field | AFVV - FSSAD | Earliest scheduled start: Teardown (date) | |
133 | Table/Structure Field | AFVV - FSSAZ | Earliest scheduled start: Teardown (time) | |
134 | Table/Structure Field | AFVV - FSSAZ | Earliest scheduled start: Teardown (time) | |
135 | Table/Structure Field | AFVV - FSSBD | Earliest scheduled start: Processing (date) | |
136 | Table/Structure Field | AFVV - FSSBD | Earliest scheduled start: Processing (date) | |
137 | Table/Structure Field | AFVV - FSSBZ | Earliest scheduled start: Processing (time) | |
138 | Table/Structure Field | AFVV - FSSBZ | Earliest scheduled start: Processing (time) | |
139 | Table/Structure Field | AFVV - FSSLD | Earliest scheduled start: Wait (date) | |
140 | Table/Structure Field | AFVV - FSSLD | Earliest scheduled start: Wait (date) | |
141 | Table/Structure Field | AFVV - FSSLZ | Earliest scheduled start: Wait (time) | |
142 | Table/Structure Field | AFVV - FSSLZ | Earliest scheduled start: Wait (time) | |
143 | Table/Structure Field | AFVV - IEAVD | Actual finish of operation (date) | |
144 | Table/Structure Field | AFVV - IEAVD | Actual finish of operation (date) | |
145 | Table/Structure Field | AFVV - IEBD | Actual finish: Processing (date) | |
146 | Table/Structure Field | AFVV - IEBD | Actual finish: Processing (date) | |
147 | Table/Structure Field | AFVV - IEBZ | Actual processing finish (time) | |
148 | Table/Structure Field | AFVV - IEBZ | Actual processing finish (time) | |
149 | Table/Structure Field | AFVV - IEDD | Actual finish: Execution (date) | |
150 | Table/Structure Field | AFVV - IEDD | Actual finish: Execution (date) | |
151 | Table/Structure Field | AFVV - IEDZ | Actual finish: Execution (time) | |
152 | Table/Structure Field | AFVV - IEDZ | Actual finish: Execution (time) | |
153 | Table/Structure Field | AFVV - IERD | Actual finish: Setup (date) | |
154 | Table/Structure Field | AFVV - IERD | Actual finish: Setup (date) | |
155 | Table/Structure Field | AFVV - IERZ | Actual finish: Setup (time) | |
156 | Table/Structure Field | AFVV - IERZ | Actual finish: Setup (time) | |
157 | Table/Structure Field | AFVV - ISAD | Actual start: Teardown (date) | |
158 | Table/Structure Field | AFVV - ISAD | Actual start: Teardown (date) | |
159 | Table/Structure Field | AFVV - ISAVD | Actual operation start (date) | |
160 | Table/Structure Field | AFVV - ISAVD | Actual operation start (date) | |
161 | Table/Structure Field | AFVV - ISAZ | Actual start: Teardown (time) | |
162 | Table/Structure Field | AFVV - ISAZ | Actual start: Teardown (time) | |
163 | Table/Structure Field | AFVV - ISBD | Actual start: Processing (date) | |
164 | Table/Structure Field | AFVV - ISBD | Actual start: Processing (date) | |
165 | Table/Structure Field | AFVV - ISBZ | Actual start: Processing (time) | |
166 | Table/Structure Field | AFVV - ISBZ | Actual start: Processing (time) | |
167 | Table/Structure Field | AFVV - ISDD | Actual start: Execution (date) | |
168 | Table/Structure Field | AFVV - ISDD | Actual start: Execution (date) | |
169 | Table/Structure Field | AFVV - ISDZ | Actual start: Execution/setup (time) | |
170 | Table/Structure Field | AFVV - ISDZ | Actual start: Execution/setup (time) | |
171 | Table/Structure Field | AFVV - ISMNW | Actual work | |
172 | Table/Structure Field | AFVV - ISMNW | Actual work | |
173 | Table/Structure Field | AFVV - LIEGZ | Wait time used for scheduling | |
174 | Table/Structure Field | AFVV - LIEGZ | Wait time used for scheduling | |
175 | Table/Structure Field | AFVV - LIGZE | Unit of measure for wait time | |
176 | Table/Structure Field | AFVV - LIGZE | Unit of measure for wait time | |
177 | Table/Structure Field | AFVV - LMNGA | Total Yield Confirmed | |
178 | Table/Structure Field | AFVV - LMNGA | Total Yield Confirmed | |
179 | Table/Structure Field | AFVV - MEINH | Unit of measure for activity | |
180 | Table/Structure Field | AFVV - MEINH | Unit of measure for activity | |
181 | Table/Structure Field | AFVV - MGVRG | Operation Quantity | |
182 | Table/Structure Field | AFVV - MGVRG | Operation Quantity | |
183 | Table/Structure Field | AFVV - OFMNW | Forecasted work (actual + remaining) | |
184 | Table/Structure Field | AFVV - OFMNW | Forecasted work (actual + remaining) | |
185 | Table/Structure Field | AFVV - RSTZE | Unit of measure for setup time | |
186 | Table/Structure Field | AFVV - RSTZE | Unit of measure for setup time | |
187 | Table/Structure Field | AFVV - RUEST | Setup time | |
188 | Table/Structure Field | AFVV - RUEST | Setup time | |
189 | Table/Structure Field | AFVV - SSAVD | Latest scheduled start: Execution (date) | |
190 | Table/Structure Field | AFVV - SSAVD | Latest scheduled start: Execution (date) | |
191 | Table/Structure Field | AFVV - SSAVZ | Latest scheduled start: Execution (time) | |
192 | Table/Structure Field | AFVV - SSAVZ | Latest scheduled start: Execution (time) | |
193 | Table/Structure Field | AFVV - SSEDD | Latest scheduled finish: Execution (date) | |
194 | Table/Structure Field | AFVV - SSEDD | Latest scheduled finish: Execution (date) | |
195 | Table/Structure Field | AFVV - SSEDZ | Latest scheduled finish: Execution (time) | |
196 | Table/Structure Field | AFVV - SSEDZ | Latest scheduled finish: Execution (time) | |
197 | Table/Structure Field | AFVV - SSELD | Latest scheduled finish: Wait time (date) | |
198 | Table/Structure Field | AFVV - SSELD | Latest scheduled finish: Wait time (date) | |
199 | Table/Structure Field | AFVV - SSELZ | Latest scheduled finish: Wait time | |
200 | Table/Structure Field | AFVV - SSELZ | Latest scheduled finish: Wait time | |
201 | Table/Structure Field | AFVV - SSSAD | Latest scheduled start: Teardown (date) | |
202 | Table/Structure Field | AFVV - SSSAD | Latest scheduled start: Teardown (date) | |
203 | Table/Structure Field | AFVV - SSSAZ | Latest scheduled start: Teardown (time) | |
204 | Table/Structure Field | AFVV - SSSAZ | Latest scheduled start: Teardown (time) | |
205 | Table/Structure Field | AFVV - SSSBD | Latest scheduled start: Processing (date) | |
206 | Table/Structure Field | AFVV - SSSBD | Latest scheduled start: Processing (date) | |
207 | Table/Structure Field | AFVV - SSSBZ | Latest scheduled start: Processing (time) | |
208 | Table/Structure Field | AFVV - SSSBZ | Latest scheduled start: Processing (time) | |
209 | Table/Structure Field | AFVV - SSSLD | Latest scheduled start: Wait time (date) | |
210 | Table/Structure Field | AFVV - SSSLD | Latest scheduled start: Wait time (date) | |
211 | Table/Structure Field | AFVV - SSSLZ | Latest scheduled start: Wait time | |
212 | Table/Structure Field | AFVV - SSSLZ | Latest scheduled start: Wait time | |
213 | Table/Structure Field | AFVV - TRANZ | Move time used for scheduling | |
214 | Table/Structure Field | AFVV - TRANZ | Move time used for scheduling | |
215 | Table/Structure Field | AFVV - TRAZE | Unit of measure for move time | |
216 | Table/Structure Field | AFVV - TRAZE | Unit of measure for move time | |
217 | Table/Structure Field | AFVV - WARTZ | Queue time used for scheduling | |
218 | Table/Structure Field | AFVV - WARTZ | Queue time used for scheduling | |
219 | Table/Structure Field | AFVV - WRTZE | Unit of measure for queue time | |
220 | Table/Structure Field | AFVV - WRTZE | Unit of measure for queue time | |
221 | Table/Structure Field | AFVV - ZEIER | Unit for the break time | |
222 | Table/Structure Field | AFVV - ZEIER | Unit for the break time | |
223 | Table/Structure Field | AFVV - ZMERH | Break | |
224 | Table/Structure Field | AFVV - ZMERH | Break |