Table/Structure Field list used by SAP ABAP View BIW_NWA_D (Data Collection: Network Activity Dates for BW)
SAP ABAP View
BIW_NWA_D (Data Collection: Network Activity Dates for BW) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
AFKO - AUFNR | Order Number | |
2 | ![]() |
AFKO - AUFNR | Order Number | |
3 | ![]() |
AFKO - DISPO | MRP controller for the order | |
4 | ![]() |
AFKO - DISPO | MRP controller for the order | |
5 | ![]() |
AFKO - MANDT | Client | |
6 | ![]() |
AFKO - MANDT | Client | |
7 | ![]() |
AFKO - PRONR | Project definition | |
8 | ![]() |
AFKO - PRONR | Project definition | |
9 | ![]() |
AFVC - ANFKO | Requesting cost center | |
10 | ![]() |
AFVC - ANFKO | Requesting cost center | |
11 | ![]() |
AFVC - ANFKOKRS | Controlling area of the requesting cost center | |
12 | ![]() |
AFVC - ANFKOKRS | Controlling area of the requesting cost center | |
13 | ![]() |
AFVC - APLZL | General counter for order | |
14 | ![]() |
AFVC - APLZL | General counter for order | |
15 | ![]() |
AFVC - ARBID | Object ID of the resource | |
16 | ![]() |
AFVC - ARBID | Object ID of the resource | |
17 | ![]() |
AFVC - AUFPL | Routing number of operations in the order | |
18 | ![]() |
AFVC - AUFPL | Routing number of operations in the order | |
19 | ![]() |
AFVC - BUKRS | Company Code | |
20 | ![]() |
AFVC - BUKRS | Company Code | |
21 | ![]() |
AFVC - EBELN | Purchasing Document Number | |
22 | ![]() |
AFVC - EBELN | Purchasing Document Number | |
23 | ![]() |
AFVC - EBELP | Item Number of Purchasing Document | |
24 | ![]() |
AFVC - EBELP | Item Number of Purchasing Document | |
25 | ![]() |
AFVC - EKGRP | Purchasing group for external processing | |
26 | ![]() |
AFVC - EKGRP | Purchasing group for external processing | |
27 | ![]() |
AFVC - EKORG | Purchasing organization | |
28 | ![]() |
AFVC - EKORG | Purchasing organization | |
29 | ![]() |
AFVC - GSBER | Business Area | |
30 | ![]() |
AFVC - GSBER | Business Area | |
31 | ![]() |
AFVC - INFNR | Number of purchasing info record | |
32 | ![]() |
AFVC - INFNR | Number of purchasing info record | |
33 | ![]() |
AFVC - LARNT | Activity Type | |
34 | ![]() |
AFVC - LARNT | Activity Type | |
35 | ![]() |
AFVC - LIFNR | Account Number of Vendor or Creditor | |
36 | ![]() |
AFVC - LIFNR | Account Number of Vendor or Creditor | |
37 | ![]() |
AFVC - LTXA1 | Operation short text | |
38 | ![]() |
AFVC - LTXA1 | Operation short text | |
39 | ![]() |
AFVC - MATKL | Material Group | |
40 | ![]() |
AFVC - MATKL | Material Group | |
41 | ![]() |
AFVC - NPRIO | Priority | |
42 | ![]() |
AFVC - NPRIO | Priority | |
43 | ![]() |
AFVC - OBJNR | Object number | |
44 | ![]() |
AFVC - OBJNR | Object number | |
45 | ![]() |
AFVC - PRCTR | Profit Center | |
46 | ![]() |
AFVC - PRCTR | Profit Center | |
47 | ![]() |
AFVC - PROJN | Work breakdown structure element (WBS element) | |
48 | ![]() |
AFVC - PROJN | Work breakdown structure element (WBS element) | |
49 | ![]() |
AFVC - SAKTO | Cost Element | |
50 | ![]() |
AFVC - SAKTO | Cost Element | |
51 | ![]() |
AFVC - SCOPE | Object Class | |
52 | ![]() |
AFVC - SCOPE | Object Class | |
53 | ![]() |
AFVC - STEUS | Control key | |
54 | ![]() |
AFVC - STEUS | Control key | |
55 | ![]() |
AFVC - SUMNR | Node number of the superior operation | |
56 | ![]() |
AFVC - SUMNR | Node number of the superior operation | |
57 | ![]() |
AFVC - VORNR | Operation/Activity Number | |
58 | ![]() |
AFVC - VORNR | Operation/Activity Number | |
59 | ![]() |
AFVC - WAERS | Currency Key | |
60 | ![]() |
AFVC - WAERS | Currency Key | |
61 | ![]() |
AFVC - WERKS | Plant | |
62 | ![]() |
AFVC - WERKS | Plant | |
63 | ![]() |
AFVV - ABRUE | Teardown | |
64 | ![]() |
AFVV - ABRUE | Teardown | |
65 | ![]() |
AFVV - ARBEH | Unit for work | |
66 | ![]() |
AFVV - ARBEH | Unit for work | |
67 | ![]() |
AFVV - ARBEI | Work involved in the activity | |
68 | ![]() |
AFVV - ARBEI | Work involved in the activity | |
69 | ![]() |
AFVV - ARUZE | Unit of measure for teardown | |
70 | ![]() |
AFVV - ARUZE | Unit of measure for teardown | |
71 | ![]() |
AFVV - BEARP | Processing time (forecast) | |
72 | ![]() |
AFVV - BEARP | Processing time (forecast) | |
73 | ![]() |
AFVV - BEARZ | Processing time | |
74 | ![]() |
AFVV - BEARZ | Processing time | |
75 | ![]() |
AFVV - BEAZE | Unit of measure for processing time | |
76 | ![]() |
AFVV - BEAZE | Unit of measure for processing time | |
77 | ![]() |
AFVV - BEAZP | Unit of processing time (Forecast) | |
78 | ![]() |
AFVV - BEAZP | Unit of processing time (Forecast) | |
79 | ![]() |
AFVV - DAUME | Unit for the minimum duration | |
80 | ![]() |
AFVV - DAUME | Unit for the minimum duration | |
81 | ![]() |
AFVV - DAUMI | Minimum activity duration | |
82 | ![]() |
AFVV - DAUMI | Minimum activity duration | |
83 | ![]() |
AFVV - DAUNE | Normal duration/unit | |
84 | ![]() |
AFVV - DAUNE | Normal duration/unit | |
85 | ![]() |
AFVV - DAUNO | Normal duration of the activity | |
86 | ![]() |
AFVV - DAUNO | Normal duration of the activity | |
87 | ![]() |
AFVV - EINSA | Constraint on the basic start date for the activity | |
88 | ![]() |
AFVV - EINSA | Constraint on the basic start date for the activity | |
89 | ![]() |
AFVV - EINSE | Constraint on the finish date of the activity | |
90 | ![]() |
AFVV - EINSE | Constraint on the finish date of the activity | |
91 | ![]() |
AFVV - EPANF | Dispatched start date for operation | |
92 | ![]() |
AFVV - EPANF | Dispatched start date for operation | |
93 | ![]() |
AFVV - EPANZ | Dispatched start time for operation | |
94 | ![]() |
AFVV - EPANZ | Dispatched start time for operation | |
95 | ![]() |
AFVV - EPEND | Dispatched finish date | |
96 | ![]() |
AFVV - EPEND | Dispatched finish date | |
97 | ![]() |
AFVV - EPENZ | Dispatched finish time | |
98 | ![]() |
AFVV - EPENZ | Dispatched finish time | |
99 | ![]() |
AFVV - EWDAM | Minimum duration (from forecast) for activity | |
100 | ![]() |
AFVV - EWDAM | Minimum duration (from forecast) for activity | |
101 | ![]() |
AFVV - EWDAN | Normal duration (from forecast) of activity | |
102 | ![]() |
AFVV - EWDAN | Normal duration (from forecast) of activity | |
103 | ![]() |
AFVV - EWDME | Unit for forecast minimum duration | |
104 | ![]() |
AFVV - EWDME | Unit for forecast minimum duration | |
105 | ![]() |
AFVV - EWDNE | Unit for forecast normal duration | |
106 | ![]() |
AFVV - EWDNE | Unit for forecast normal duration | |
107 | ![]() |
AFVV - EWEND | Forecast finish date | |
108 | ![]() |
AFVV - EWEND | Forecast finish date | |
109 | ![]() |
AFVV - EWENZ | Forecast finish time for the activity | |
110 | ![]() |
AFVV - EWENZ | Forecast finish time for the activity | |
111 | ![]() |
AFVV - EWSTA | Forecast date constraint on activity start | |
112 | ![]() |
AFVV - EWSTA | Forecast date constraint on activity start | |
113 | ![]() |
AFVV - EWSTD | Forecasted start date for the activity | |
114 | ![]() |
AFVV - EWSTD | Forecasted start date for the activity | |
115 | ![]() |
AFVV - EWSTE | Forecast date constraint on activity finish | |
116 | ![]() |
AFVV - EWSTE | Forecast date constraint on activity finish | |
117 | ![]() |
AFVV - EWSTZ | Forecast start time of the activity | |
118 | ![]() |
AFVV - EWSTZ | Forecast start time of the activity | |
119 | ![]() |
AFVV - FPAVD | Earliest scheduled start date (forecast) | |
120 | ![]() |
AFVV - FPAVD | Earliest scheduled start date (forecast) | |
121 | ![]() |
AFVV - FPAVZ | Earliest scheduled start time (forecast) | |
122 | ![]() |
AFVV - FPAVZ | Earliest scheduled start time (forecast) | |
123 | ![]() |
AFVV - FPEDD | Earliest scheduled finish date (forecast) | |
124 | ![]() |
AFVV - FPEDD | Earliest scheduled finish date (forecast) | |
125 | ![]() |
AFVV - FPEDZ | Earliest scheduled finish time (forecast) | |
126 | ![]() |
AFVV - FPEDZ | Earliest scheduled finish time (forecast) | |
127 | ![]() |
AFVV - FSAVD | Earliest scheduled start: Execution (date) | |
128 | ![]() |
AFVV - FSAVD | Earliest scheduled start: Execution (date) | |
129 | ![]() |
AFVV - FSAVZ | Earliest scheduled start: Execution (time) | |
130 | ![]() |
AFVV - FSAVZ | Earliest scheduled start: Execution (time) | |
131 | ![]() |
AFVV - FSEDD | Earliest scheduled finish: Execution (date) | |
132 | ![]() |
AFVV - FSEDD | Earliest scheduled finish: Execution (date) | |
133 | ![]() |
AFVV - FSEDZ | Earliest scheduled finish: Execution (time) | |
134 | ![]() |
AFVV - FSEDZ | Earliest scheduled finish: Execution (time) | |
135 | ![]() |
AFVV - FSELD | Earliest scheduled finish: Wait (date) | |
136 | ![]() |
AFVV - FSELD | Earliest scheduled finish: Wait (date) | |
137 | ![]() |
AFVV - FSELZ | Earliest scheduled finish: Wait (time) | |
138 | ![]() |
AFVV - FSELZ | Earliest scheduled finish: Wait (time) | |
139 | ![]() |
AFVV - FSSAD | Earliest scheduled start: Teardown (date) | |
140 | ![]() |
AFVV - FSSAD | Earliest scheduled start: Teardown (date) | |
141 | ![]() |
AFVV - FSSAZ | Earliest scheduled start: Teardown (time) | |
142 | ![]() |
AFVV - FSSAZ | Earliest scheduled start: Teardown (time) | |
143 | ![]() |
AFVV - FSSBD | Earliest scheduled start: Processing (date) | |
144 | ![]() |
AFVV - FSSBD | Earliest scheduled start: Processing (date) | |
145 | ![]() |
AFVV - FSSBZ | Earliest scheduled start: Processing (time) | |
146 | ![]() |
AFVV - FSSBZ | Earliest scheduled start: Processing (time) | |
147 | ![]() |
AFVV - FSSLD | Earliest scheduled start: Wait (date) | |
148 | ![]() |
AFVV - FSSLD | Earliest scheduled start: Wait (date) | |
149 | ![]() |
AFVV - FSSLZ | Earliest scheduled start: Wait (time) | |
150 | ![]() |
AFVV - FSSLZ | Earliest scheduled start: Wait (time) | |
151 | ![]() |
AFVV - IEAVD | Actual finish of operation (date) | |
152 | ![]() |
AFVV - IEAVD | Actual finish of operation (date) | |
153 | ![]() |
AFVV - IEBD | Actual finish: Processing (date) | |
154 | ![]() |
AFVV - IEBD | Actual finish: Processing (date) | |
155 | ![]() |
AFVV - IEBZ | Actual processing finish (time) | |
156 | ![]() |
AFVV - IEBZ | Actual processing finish (time) | |
157 | ![]() |
AFVV - IEDD | Actual finish: Execution (date) | |
158 | ![]() |
AFVV - IEDD | Actual finish: Execution (date) | |
159 | ![]() |
AFVV - IEDZ | Actual finish: Execution (time) | |
160 | ![]() |
AFVV - IEDZ | Actual finish: Execution (time) | |
161 | ![]() |
AFVV - IERD | Actual finish: Setup (date) | |
162 | ![]() |
AFVV - IERD | Actual finish: Setup (date) | |
163 | ![]() |
AFVV - IERZ | Actual finish: Setup (time) | |
164 | ![]() |
AFVV - IERZ | Actual finish: Setup (time) | |
165 | ![]() |
AFVV - ISAD | Actual start: Teardown (date) | |
166 | ![]() |
AFVV - ISAD | Actual start: Teardown (date) | |
167 | ![]() |
AFVV - ISAVD | Actual operation start (date) | |
168 | ![]() |
AFVV - ISAVD | Actual operation start (date) | |
169 | ![]() |
AFVV - ISAZ | Actual start: Teardown (time) | |
170 | ![]() |
AFVV - ISAZ | Actual start: Teardown (time) | |
171 | ![]() |
AFVV - ISBD | Actual start: Processing (date) | |
172 | ![]() |
AFVV - ISBD | Actual start: Processing (date) | |
173 | ![]() |
AFVV - ISBZ | Actual start: Processing (time) | |
174 | ![]() |
AFVV - ISBZ | Actual start: Processing (time) | |
175 | ![]() |
AFVV - ISDD | Actual start: Execution (date) | |
176 | ![]() |
AFVV - ISDD | Actual start: Execution (date) | |
177 | ![]() |
AFVV - ISDZ | Actual start: Execution/setup (time) | |
178 | ![]() |
AFVV - ISDZ | Actual start: Execution/setup (time) | |
179 | ![]() |
AFVV - ISMNW | Actual work | |
180 | ![]() |
AFVV - ISMNW | Actual work | |
181 | ![]() |
AFVV - NTANF | Constraint for activity start (Basic) | |
182 | ![]() |
AFVV - NTANF | Constraint for activity start (Basic) | |
183 | ![]() |
AFVV - NTANZ | Constraint for activity start time (Basic) | |
184 | ![]() |
AFVV - NTANZ | Constraint for activity start time (Basic) | |
185 | ![]() |
AFVV - NTEND | Constraint for finish of activity (Basic) | |
186 | ![]() |
AFVV - NTEND | Constraint for finish of activity (Basic) | |
187 | ![]() |
AFVV - NTENZ | Basic finish time of the activity | |
188 | ![]() |
AFVV - NTENZ | Basic finish time of the activity | |
189 | ![]() |
AFVV - PDAE | Unit of the forecasted duration from the confirmation | |
190 | ![]() |
AFVV - PDAE | Unit of the forecasted duration from the confirmation | |
191 | ![]() |
AFVV - PDAU | Forecasted duration of activity from confirmation | |
192 | ![]() |
AFVV - PDAU | Forecasted duration of activity from confirmation | |
193 | ![]() |
AFVV - PEDD | Forecast finish date of operation from confirmation | |
194 | ![]() |
AFVV - PEDD | Forecast finish date of operation from confirmation | |
195 | ![]() |
AFVV - PEDZ | Forecast finish time of operation from confirmation | |
196 | ![]() |
AFVV - PEDZ | Forecast finish time of operation from confirmation | |
197 | ![]() |
AFVV - PLIFZ | Planned delivery time in days | |
198 | ![]() |
AFVV - PLIFZ | Planned delivery time in days | |
199 | ![]() |
AFVV - PUFFP | Free float (from forecast) | |
200 | ![]() |
AFVV - PUFFP | Free float (from forecast) | |
201 | ![]() |
AFVV - PUFFR | Free float | |
202 | ![]() |
AFVV - PUFFR | Free float | |
203 | ![]() |
AFVV - PUFGP | Total float (from forecast) | |
204 | ![]() |
AFVV - PUFGP | Total float (from forecast) | |
205 | ![]() |
AFVV - PUFGS | Total float | |
206 | ![]() |
AFVV - PUFGS | Total float | |
207 | ![]() |
AFVV - RSTZE | Unit of measure for setup time | |
208 | ![]() |
AFVV - RSTZE | Unit of measure for setup time | |
209 | ![]() |
AFVV - RUEST | Setup time | |
210 | ![]() |
AFVV - RUEST | Setup time | |
211 | ![]() |
AFVV - SPAVD | Latest scheduled start date (forecast) | |
212 | ![]() |
AFVV - SPAVD | Latest scheduled start date (forecast) | |
213 | ![]() |
AFVV - SPAVZ | Latest scheduled start time (forecast) | |
214 | ![]() |
AFVV - SPAVZ | Latest scheduled start time (forecast) | |
215 | ![]() |
AFVV - SPEDD | Latest scheduled finish date (forecast) | |
216 | ![]() |
AFVV - SPEDD | Latest scheduled finish date (forecast) | |
217 | ![]() |
AFVV - SPEDZ | Latest scheduled finish time (forecast) | |
218 | ![]() |
AFVV - SPEDZ | Latest scheduled finish time (forecast) | |
219 | ![]() |
AFVV - SSAVD | Latest scheduled start: Execution (date) | |
220 | ![]() |
AFVV - SSAVD | Latest scheduled start: Execution (date) | |
221 | ![]() |
AFVV - SSAVZ | Latest scheduled start: Execution (time) | |
222 | ![]() |
AFVV - SSAVZ | Latest scheduled start: Execution (time) | |
223 | ![]() |
AFVV - SSEDD | Latest scheduled finish: Execution (date) | |
224 | ![]() |
AFVV - SSEDD | Latest scheduled finish: Execution (date) | |
225 | ![]() |
AFVV - SSEDZ | Latest scheduled finish: Execution (time) | |
226 | ![]() |
AFVV - SSEDZ | Latest scheduled finish: Execution (time) | |
227 | ![]() |
AFVV - SSELD | Latest scheduled finish: Wait time (date) | |
228 | ![]() |
AFVV - SSELD | Latest scheduled finish: Wait time (date) | |
229 | ![]() |
AFVV - SSELZ | Latest scheduled finish: Wait time | |
230 | ![]() |
AFVV - SSELZ | Latest scheduled finish: Wait time | |
231 | ![]() |
AFVV - SSSAD | Latest scheduled start: Teardown (date) | |
232 | ![]() |
AFVV - SSSAD | Latest scheduled start: Teardown (date) | |
233 | ![]() |
AFVV - SSSAZ | Latest scheduled start: Teardown (time) | |
234 | ![]() |
AFVV - SSSAZ | Latest scheduled start: Teardown (time) | |
235 | ![]() |
AFVV - SSSBD | Latest scheduled start: Processing (date) | |
236 | ![]() |
AFVV - SSSBD | Latest scheduled start: Processing (date) | |
237 | ![]() |
AFVV - SSSBZ | Latest scheduled start: Processing (time) | |
238 | ![]() |
AFVV - SSSBZ | Latest scheduled start: Processing (time) | |
239 | ![]() |
AFVV - SSSLD | Latest scheduled start: Wait time (date) | |
240 | ![]() |
AFVV - SSSLD | Latest scheduled start: Wait time (date) | |
241 | ![]() |
AFVV - SSSLZ | Latest scheduled start: Wait time | |
242 | ![]() |
AFVV - SSSLZ | Latest scheduled start: Wait time | |
243 | ![]() |
AUFK - AEDAT | Change date for Order Master | |
244 | ![]() |
AUFK - AEDAT | Change date for Order Master | |
245 | ![]() |
AUFK - AUTYP | Order category | |
246 | ![]() |
AUFK - AUTYP | Order category | |
247 | ![]() |
AUFK - ERDAT | Created on | |
248 | ![]() |
AUFK - ERDAT | Created on | |
249 | ![]() |
AUFK - KOKRS | Controlling Area | |
250 | ![]() |
AUFK - KOKRS | Controlling Area | |
251 | ![]() |
AUFK - PSPEL | Work breakdown structure element (WBS element) | |
252 | ![]() |
AUFK - PSPEL | Work breakdown structure element (WBS element) |