Table/Structure Field list used by SAP ABAP Program SAPLM61O (Planned Order Processing)
SAP ABAP Program
SAPLM61O (Planned Order Processing) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AF61O - MSGLI | Long text of error message | SOURCE AF61O-MSGLI |
|
| 2 | AF61O - MSGLI | Long text of error message | SOURCE AF61O-MSGLI |
|
| 3 | ASP00 - STODA | Availability date from warehouse | SOURCE ASP00-STODA |
|
| 4 | CYBEDINF - ARBPL | Work center | SOURCE CYBEDINF-ARBPL |
|
| 5 | CYBEDINF - BEDREST | Remaining capacity requirements scheduled for operation | SOURCE CYBEDINF-BEDREST |
|
| 6 | CYBEDINF - KAPAR | Capacity category | SOURCE CYBEDINF-KAPAR |
|
| 7 | CYBEDINF - LTXA1 | Operation short text | SOURCE CYBEDINF-LTXA1 |
|
| 8 | CYBEDINF - UVORN | Suboperation | SOURCE CYBEDINF-UVORN |
|
| 9 | KBED - KEINH | Unit of of measure for displaying capacity requirements | SOURCE KBED-KEINH |
|
| 10 | KBED - PLNFL | Sequence | SOURCE KBED-PLNFL |
|
| 11 | KBED - SENDD | Latest finish / date | SOURCE KBED-SENDD |
|
| 12 | KBED - SENDU | Latest finish / time | SOURCE KBED-SENDU |
|
| 13 | KBED - SSTAD | Latest start / date | SOURCE KBED-SSTAD |
|
| 14 | KBED - SSTAU | Latest start / time | SOURCE KBED-SSTAU |
|
| 15 | KBED - VORNR | Operation/Activity Number | SOURCE KBED-VORNR |
|
| 16 | KBKO - GLTRS | Scheduled finish | SOURCE KBKO-GLTRS |
|
| 17 | KBKO - GLUZS | Earliest finish of operation (time) | SOURCE KBKO-GLUZS |
|
| 18 | KBKO - GSTRS | Scheduled start | SOURCE KBKO-GSTRS |
|
| 19 | KBKO - GSUZS | Earliest scheduled start: Execution (time) | SOURCE KBKO-GSUZS |
|
| 20 | KBKO - PLNAL | Group Counter | SOURCE KBKO-PLNAL |
|
| 21 | KBKO - PLNAL | Group Counter | SOURCE KBKO-PLNAL |
|
| 22 | KBKO - PLNNR | Key for Task List Group | SOURCE KBKO-PLNNR |
|
| 23 | KBKO - PLNNR | Key for Task List Group | SOURCE KBKO-PLNNR |
|
| 24 | KBKO - PLNTY | Task List Type | SOURCE KBKO-PLNTY |
|
| 25 | KBKO - PLNTY | Task List Type | SOURCE KBKO-PLNTY |
|
| 26 | KBKO - REDKZ | Reduction indicator for scheduling | SOURCE KBKO-REDKZ |
|
| 27 | KBKO - REDKZ | Reduction indicator for scheduling | SOURCE KBKO-REDKZ |
|
| 28 | KBKO - TERKZ | Scheduling type | SOURCE KBKO-TERKZ |
|
| 29 | KBKO - TERKZ | Scheduling type | SOURCE KBKO-TERKZ |
|
| 30 | MKAL - MDV01 | Production line for repetitive manufacturing | SOURCE MKAL-MDV01 |
|
| 31 | MT61D - BSTFE | Fixed lot size | SOURCE MT61D-BSTFE |
|
| 32 | MT61D - BSTFE | Fixed lot size | SOURCE MT61D-BSTFE |
|
| 33 | MT61D - BSTMA | Maximum lot size | SOURCE MT61D-BSTMA |
|
| 34 | MT61D - BSTMA | Maximum lot size | SOURCE MT61D-BSTMA |
|
| 35 | MT61D - BSTMI | Minimum lot size | SOURCE MT61D-BSTMI |
|
| 36 | MT61D - BSTMI | Minimum lot size | SOURCE MT61D-BSTMI |
|
| 37 | MT61D - BSTRF | Rounding value for purchase order quantity | SOURCE MT61D-BSTRF |
|
| 38 | MT61D - BSTRF | Rounding value for purchase order quantity | SOURCE MT61D-BSTRF |
|
| 39 | MT61D - DISLS | Lot size (materials planning) | SOURCE MT61D-DISLS |
|
| 40 | MT61D - DISLS | Lot size (materials planning) | SOURCE MT61D-DISLS |
|
| 41 | MT61D - DZEIT | In-house production time | SOURCE MT61D-DZEIT |
|
| 42 | MT61D - DZEIT | In-house production time | SOURCE MT61D-DZEIT |
|
| 43 | MT61D - EKGRP | Purchasing group | SOURCE MT61D-EKGRP |
|
| 44 | MT61D - EKGRP | Purchasing group | SOURCE MT61D-EKGRP |
|
| 45 | MT61D - FHORI | Scheduling Margin Key for Floats | SOURCE MT61D-FHORI |
|
| 46 | MT61D - FHORI | Scheduling Margin Key for Floats | SOURCE MT61D-FHORI |
|
| 47 | MT61D - MABST | Maximum stock level | SOURCE MT61D-MABST |
|
| 48 | MT61D - MABST | Maximum stock level | SOURCE MT61D-MABST |
|
| 49 | MT61D - MRPPP | PPC planning calendar | SOURCE MT61D-MRPPP |
|
| 50 | MT61D - MRPPP | PPC planning calendar | SOURCE MT61D-MRPPP |
|
| 51 | MT61D - PLIFZ | Planned delivery time in days | SOURCE MT61D-PLIFZ |
|
| 52 | MT61D - PLIFZ | Planned delivery time in days | SOURCE MT61D-PLIFZ |
|
| 53 | MT61D - RDPRF | Rounding Profile | SOURCE MT61D-RDPRF |
|
| 54 | MT61D - RDPRF | Rounding Profile | SOURCE MT61D-RDPRF |
|
| 55 | MT61D - WZEIT | Total replenishment lead time (in workdays) | SOURCE MT61D-WZEIT |
|
| 56 | MT61D - WZEIT | Total replenishment lead time (in workdays) | SOURCE MT61D-WZEIT |
|
| 57 | MT61D - WZEIT | Total replenishment lead time (in workdays) | SOURCE *MT61D-WZEIT |
|
| 58 | MT61D - WZEIT | Total replenishment lead time (in workdays) | SOURCE *MT61D-WZEIT |
|
| 59 | OPITD - ARBPL | Work center | SOURCE OPITD-ARBPL |
|
| 60 | OPITD - ARBPL | Work center | SOURCE OPITD-ARBPL |
|
| 61 | OPITD - OPIT | Schedule record item | SOURCE OPITD-OPIT |
|
| 62 | OPITD - OPIT | Schedule record item | SOURCE OPITD-OPIT |
|
| 63 | OPITD - PBEDA | Planned arrival date | SOURCE OPITD-PBEDA |
|
| 64 | OPITD - PBEDA | Planned arrival date | SOURCE OPITD-PBEDA |
|
| 65 | OPITD - PBETI | Planned arrival time | SOURCE OPITD-PBETI |
|
| 66 | OPITD - PBETI | Planned arrival time | SOURCE OPITD-PBETI |
|
| 67 | OPITD - PENDA | Planned exit date | SOURCE OPITD-PENDA |
|
| 68 | OPITD - PENDA | Planned exit date | SOURCE OPITD-PENDA |
|
| 69 | OPITD - PENTI | Planned exit time | SOURCE OPITD-PENTI |
|
| 70 | OPITD - PENTI | Planned exit time | SOURCE OPITD-PENTI |
|
| 71 | OPITD - SEQNR | Seq. number order | SOURCE OPITD-SEQNR |
|
| 72 | OPITD - SEQNR | Seq. number order | SOURCE OPITD-SEQNR |
|
| 73 | PLAF - AENNR | Change Number | SOURCE PLAF-AENNR |
|
| 74 | PLAF - AENNR | Change Number | SOURCE PLAF-AENNR |
|
| 75 | PLAF - AUFFX | Firming indicator for planned order data | SOURCE FIELD PLAF-AUFFX. |
|
| 76 | PLAF - AUFFX | Firming indicator for planned order data | SOURCE PLAF-AUFFX |
|
| 77 | PLAF - AUFFX | Firming indicator for planned order data | SOURCE PLAF-AUFFX |
|
| 78 | PLAF - AVMNG | Fixed quantity of scrap from production | SOURCE FIELD PLAF-AVMNG. |
|
| 79 | PLAF - AVMNG | Fixed quantity of scrap from production | SOURCE PLAF-AVMNG |
|
| 80 | PLAF - AVMNG | Fixed quantity of scrap from production | SOURCE PLAF-AVMNG |
|
| 81 | PLAF - BERID | MRP Area | SOURCE PLAF-BERID |
|
| 82 | PLAF - BERID | MRP Area | SOURCE PLAF-BERID |
|
| 83 | PLAF - BERID | MRP Area | SOURCE FIELD PLAF-BERID. |
|
| 84 | PLAF - DISPO | MRP controller | SOURCE PLAF-DISPO |
|
| 85 | PLAF - DISPO | MRP controller | SOURCE PLAF-DISPO |
|
| 86 | PLAF - EKORG | Purchasing organization | SOURCE FIELD PLAF-EKORG. |
|
| 87 | PLAF - EKORG | Purchasing organization | SOURCE FIELD PLAF-EKORG. |
|
| 88 | PLAF - EKORG | Purchasing organization | SOURCE PLAF-EKORG |
|
| 89 | PLAF - EKORG | Purchasing organization | SOURCE PLAF-EKORG |
|
| 90 | PLAF - EMATN | Material number corresponding to manufacturer part number | SOURCE PLAF-EMATN |
|
| 91 | PLAF - EMATN | Material number corresponding to manufacturer part number | SOURCE PLAF-EMATN |
|
| 92 | PLAF - EMLIF | Vendor to be supplied/who is to receive delivery | SOURCE PLAF-EMLIF |
|
| 93 | PLAF - EMLIF | Vendor to be supplied/who is to receive delivery | SOURCE PLAF-EMLIF |
|
| 94 | PLAF - ERFME | Unit of entry | SOURCE PLAF-ERFME |
|
| 95 | PLAF - ERFMG | Quantity in unit of entry | SOURCE FIELD PLAF-ERFMG |
|
| 96 | PLAF - ERFMG | Quantity in unit of entry | SOURCE MODULE CHECK_ERFMG on chain-request. |
|
| 97 | PLAF - ERFMG | Quantity in unit of entry | SOURCE FIELD PLAF-ERFMG. |
|
| 98 | PLAF - ERFMG | Quantity in unit of entry | SOURCE PLAF-ERFMG |
|
| 99 | PLAF - ERFMG | Quantity in unit of entry | SOURCE PLAF-ERFMG |
|
| 100 | PLAF - FLIEF | Fixed vendor | SOURCE FIELD PLAF-FLIEF. |
|
| 101 | PLAF - FLIEF | Fixed vendor | SOURCE FIELD PLAF-FLIEF. |
|
| 102 | PLAF - FLIEF | Fixed vendor | SOURCE PLAF-FLIEF |
|
| 103 | PLAF - FLIEF | Fixed vendor | SOURCE PLAF-FLIEF |
|
| 104 | PLAF - GSBTR | Total commitment date of plnd ord. after ATP check f.comps. | SOURCE PLAF-GSBTR |
|
| 105 | PLAF - GSBTR | Total commitment date of plnd ord. after ATP check f.comps. | SOURCE PLAF-GSBTR |
|
| 106 | PLAF - GSMNG | Total planned order quantity | SOURCE FIELD PLAF-GSMNG. |
|
| 107 | PLAF - GSMNG | Total planned order quantity | SOURCE MODULE CHECK_GSMNG ON REQUEST. |
|
| 108 | PLAF - GSMNG | Total planned order quantity | SOURCE PLAF-GSMNG |
|
| 109 | PLAF - GSMNG | Total planned order quantity | SOURCE PLAF-GSMNG |
|
| 110 | PLAF - GSMNG | Total planned order quantity | SOURCE PLAF-GSMNG |
|
| 111 | PLAF - GSMNG | Total planned order quantity | SOURCE FIELD PLAF-GSMNG |
|
| 112 | PLAF - GSMNG | Total planned order quantity | SOURCE PLAF-GSMNG |
|
| 113 | PLAF - GSMNG | Total planned order quantity | SOURCE FIELD PLAF-GSMNG. |
|
| 114 | PLAF - GSMNG | Total planned order quantity | SOURCE FIELD PLAF-GSMNG. |
|
| 115 | PLAF - GSMNG | Total planned order quantity | SOURCE MODULE CHECK_GSMNG ON REQUEST. |
|
| 116 | PLAF - GSMNG | Total planned order quantity | SOURCE FIELD PLAF-GSMNG |
|
| 117 | PLAF - GSMNG | Total planned order quantity | SOURCE PLAF-GSMNG |
|
| 118 | PLAF - GSMNG | Total planned order quantity | SOURCE PLAF-GSMNG |
|
| 119 | PLAF - GSMNG | Total planned order quantity | SOURCE MODULE CHECK_GSMNG ON REQUEST. |
|
| 120 | PLAF - GSMNG | Total planned order quantity | SOURCE FIELD PLAF-GSMNG. |
|
| 121 | PLAF - GSMNG | Total planned order quantity | SOURCE FIELD PLAF-GSMNG |
|
| 122 | PLAF - KAPFX | Indicator: capacity for planned order dispatched | SOURCE PLAF-KAPFX |
|
| 123 | PLAF - KAPFX | Indicator: capacity for planned order dispatched | SOURCE PLAF-KAPFX |
|
| 124 | PLAF - KDAUF | Sales Order Number | SOURCE PLAF-KDAUF |
|
| 125 | PLAF - KDAUF | Sales Order Number | SOURCE PLAF-KDAUF |
|
| 126 | PLAF - KDAUF | Sales Order Number | SOURCE FIELD PLAF-KDAUF. |
|
| 127 | PLAF - KDAUF | Sales Order Number | SOURCE FIELD PLAF-KDAUF. |
|
| 128 | PLAF - KDPOS | Item number in Sales Order | SOURCE FIELD PLAF-KDPOS. |
|
| 129 | PLAF - KDPOS | Item number in Sales Order | SOURCE FIELD PLAF-KDPOS. |
|
| 130 | PLAF - KDPOS | Item number in Sales Order | SOURCE PLAF-KDPOS |
|
| 131 | PLAF - KNTTP | Account assignment category | SOURCE FIELD PLAF-KNTTP |
|
| 132 | PLAF - KNTTP | Account assignment category | SOURCE MODULE CHECK_PLAF_KNTTP. |
|
| 133 | PLAF - KNTTP | Account assignment category | SOURCE PLAF-KNTTP |
|
| 134 | PLAF - KNTTP | Account assignment category | SOURCE PLAF-KNTTP |
|
| 135 | PLAF - KONNR | Number of principal purchase agreement | SOURCE FIELD: PLAF-KONNR, PLAF-KTPNR, |
|
| 136 | PLAF - KONNR | Number of principal purchase agreement | SOURCE PLAF-SRM_CONTRACT_ID, |
|
| 137 | PLAF - KONNR | Number of principal purchase agreement | SOURCE PLAF-SRM_CONTRACT_ITM |
|
| 138 | PLAF - KONNR | Number of principal purchase agreement | SOURCE MODULE CHECK_CTR_IDS ON CHAIN-REQUEST. |
|
| 139 | PLAF - KONNR | Number of principal purchase agreement | SOURCE FIELD PLAF-KONNR. |
|
| 140 | PLAF - KONNR | Number of principal purchase agreement | SOURCE FIELD PLAF-KONNR. |
|
| 141 | PLAF - KONNR | Number of principal purchase agreement | SOURCE PLAF-KONNR |
|
| 142 | PLAF - KONNR | Number of principal purchase agreement | SOURCE PLAF-KONNR |
|
| 143 | PLAF - KTPNR | Item number of principal purchase agreement | SOURCE FIELD: PLAF-KONNR, PLAF-KTPNR, |
|
| 144 | PLAF - KTPNR | Item number of principal purchase agreement | SOURCE PLAF-SRM_CONTRACT_ID, |
|
| 145 | PLAF - KTPNR | Item number of principal purchase agreement | SOURCE PLAF-SRM_CONTRACT_ITM |
|
| 146 | PLAF - KTPNR | Item number of principal purchase agreement | SOURCE MODULE CHECK_CTR_IDS ON CHAIN-REQUEST. |
|
| 147 | PLAF - KTPNR | Item number of principal purchase agreement | SOURCE FIELD PLAF-KTPNR. |
|
| 148 | PLAF - KTPNR | Item number of principal purchase agreement | SOURCE FIELD PLAF-KTPNR. |
|
| 149 | PLAF - KTPNR | Item number of principal purchase agreement | SOURCE PLAF-KTPNR |
|
| 150 | PLAF - KZAVC | Indicator for type of availability check | SOURCE PLAF-KZAVC |
|
| 151 | PLAF - KZAVC | Indicator for type of availability check | SOURCE PLAF-KZAVC |
|
| 152 | PLAF - KZVBR | Consumption posting | SOURCE PLAF-KZVBR |
|
| 153 | PLAF - KZVBR | Consumption posting | SOURCE PLAF-KZVBR |
|
| 154 | PLAF - LGORT | Storage location | SOURCE FIELD PLAF-LGORT. |
|
| 155 | PLAF - LGORT | Storage location | SOURCE FIELD PLAF-LGORT |
|
| 156 | PLAF - LGORT | Storage location | SOURCE MODULE GET_LGORT. |
|
| 157 | PLAF - LGORT | Storage location | SOURCE PLAF-LGORT |
|
| 158 | PLAF - LGORT | Storage location | SOURCE PLAF-LGORT |
|
| 159 | PLAF - MATNR | Planning material | SOURCE PLAF-MATNR |
|
| 160 | PLAF - MATNR | Planning material | SOURCE PLAF-MATNR |
|
| 161 | PLAF - MATNR | Planning material | SOURCE FIELD PLAF-MATNR. |
|
| 162 | PLAF - MDACC | Action: planned order processing | SOURCE FIELD PLAF-MDACC |
|
| 163 | PLAF - MDACC | Action: planned order processing | SOURCE MODULE GET_ACCTO. |
|
| 164 | PLAF - MDACC | Action: planned order processing | SOURCE PLAF-MDACC |
|
| 165 | PLAF - MDACC | Action: planned order processing | SOURCE PLAF-MDACC |
|
| 166 | PLAF - MDACD | Date of action: planned order | SOURCE PLAF-MDACD |
|
| 167 | PLAF - MDACD | Date of action: planned order | SOURCE PLAF-MDACD |
|
| 168 | PLAF - MDACH | Action control: planned order processing | SOURCE PLAF-MDACH |
|
| 169 | PLAF - MDACH | Action control: planned order processing | SOURCE PLAF-MDACH |
|
| 170 | PLAF - MDACH | Action control: planned order processing | SOURCE MODULE GET_ACCTO. |
|
| 171 | PLAF - MDACH | Action control: planned order processing | SOURCE FIELD PLAF-MDACH |
|
| 172 | PLAF - MDACT | Time of action: Planned order processing | SOURCE PLAF-MDACT |
|
| 173 | PLAF - MDACT | Time of action: Planned order processing | SOURCE PLAF-MDACT |
|
| 174 | PLAF - MEDKZ | Indicator for Distributed Planned Order | SOURCE PLAF-MEDKZ |
|
| 175 | PLAF - MEDKZ | Indicator for Distributed Planned Order | SOURCE PLAF-MEDKZ |
|
| 176 | PLAF - MEINS | Base Unit of Measure | SOURCE PLAF-MEINS |
|
| 177 | PLAF - MEINS | Base Unit of Measure | SOURCE PLAF-MEINS |
|
| 178 | PLAF - MEINS | Base Unit of Measure | SOURCE PLAF-MEINS |
|
| 179 | PLAF - PAART | Order type | SOURCE PLAF-PAART |
|
| 180 | PLAF - PALTR | Explosion date | SOURCE PLAF-PALTR |
|
| 181 | PLAF - PALTR | Explosion date | SOURCE PLAF-PALTR |
|
| 182 | PLAF - PBDNR | Requirements Plan Number | SOURCE PLAF-PBDNR |
|
| 183 | PLAF - PBDNR | Requirements Plan Number | SOURCE PLAF-PBDNR |
|
| 184 | PLAF - PEDTI | End Time of Planned Order | SOURCE PLAF-PEDTI |
|
| 185 | PLAF - PEDTR | Order finish date in the planned order | SOURCE PLAF-PEDTR |
|
| 186 | PLAF - PEDTR | Order finish date in the planned order | SOURCE PLAF-PEDTR |
|
| 187 | PLAF - PEDTR | Order finish date in the planned order | SOURCE FIELD PLAF-PEDTR. |
|
| 188 | PLAF - PEDTR | Order finish date in the planned order | SOURCE FIELD PLAF-PEDTR. |
|
| 189 | PLAF - PEDTR | Order finish date in the planned order | SOURCE FIELD PLAF-PEDTR. |
|
| 190 | PLAF - PEDTR | Order finish date in the planned order | SOURCE FIELD PLAF-PEDTR. |
|
| 191 | PLAF - PEDTR | Order finish date in the planned order | SOURCE PLAF-PEDTR |
|
| 192 | PLAF - PEDTR | Order finish date in the planned order | SOURCE PLAF-PEDTR |
|
| 193 | PLAF - PEDTR | Order finish date in the planned order | SOURCE FIELD PLAF-PEDTR. |
|
| 194 | PLAF - PEDTR | Order finish date in the planned order | SOURCE FIELD PLAF-PEDTR. |
|
| 195 | PLAF - PEDTR | Order finish date in the planned order | SOURCE PLAF-PEDTR |
|
| 196 | PLAF - PEDTR | Order finish date in the planned order | SOURCE PLAF-PEDTR |
|
| 197 | PLAF - PEDTR | Order finish date in the planned order | SOURCE PLAF-PEDTR |
|
| 198 | PLAF - PEDTR | Order finish date in the planned order | SOURCE PLAF-PEDTR |
|
| 199 | PLAF - PEDTR | Order finish date in the planned order | SOURCE FIELD PLAF-PEDTR. |
|
| 200 | PLAF - PEDTR | Order finish date in the planned order | SOURCE FIELD PLAF-PEDTR. |
|
| 201 | PLAF - PEDTR | Order finish date in the planned order | SOURCE FIELD PLAF-PEDTR. |
|
| 202 | PLAF - PEDTR | Order finish date in the planned order | SOURCE FIELD PLAF-PEDTR. |
|
| 203 | PLAF - PEDTR | Order finish date in the planned order | SOURCE FIELD PLAF-PEDTR. |
|
| 204 | PLAF - PERTR | Planned opening date in planned order | SOURCE FIELD PLAF-PERTR. |
|
| 205 | PLAF - PERTR | Planned opening date in planned order | SOURCE FIELD PLAF-PERTR. |
|
| 206 | PLAF - PERTR | Planned opening date in planned order | SOURCE FIELD PLAF-PERTR. |
|
| 207 | PLAF - PERTR | Planned opening date in planned order | SOURCE PLAF-PERTR |
|
| 208 | PLAF - PERTR | Planned opening date in planned order | SOURCE PLAF-PERTR |
|
| 209 | PLAF - PERTR | Planned opening date in planned order | SOURCE PLAF-PERTR |
|
| 210 | PLAF - PERTR | Planned opening date in planned order | SOURCE PLAF-PERTR |
|
| 211 | PLAF - PERTR | Planned opening date in planned order | SOURCE FIELD PLAF-PERTR. |
|
| 212 | PLAF - PERTR | Planned opening date in planned order | SOURCE FIELD PLAF-PERTR. |
|
| 213 | PLAF - PERTR | Planned opening date in planned order | SOURCE FIELD PLAF-PERTR. |
|
| 214 | PLAF - PERTR | Planned opening date in planned order | SOURCE PLAF-PERTR |
|
| 215 | PLAF - PERTR | Planned opening date in planned order | SOURCE PLAF-PERTR |
|
| 216 | PLAF - PERTR | Planned opening date in planned order | SOURCE FIELD PLAF-PERTR. |
|
| 217 | PLAF - PERTR | Planned opening date in planned order | SOURCE FIELD PLAF-PERTR. |
|
| 218 | PLAF - PERTR | Planned opening date in planned order | SOURCE FIELD PLAF-PERTR. |
|
| 219 | PLAF - PLGRP | Production Supervisor | SOURCE PLAF-PLGRP |
|
| 220 | PLAF - PLGRP | Production Supervisor | SOURCE PLAF-PLGRP |
|
| 221 | PLAF - PLNUM | Planned order number | SOURCE PLAF-PLNUM |
|
| 222 | PLAF - PLNUM | Planned order number | SOURCE MODULE CHECK_NEW_PLNUM ON INPUT. |
|
| 223 | PLAF - PLNUM | Planned order number | SOURCE FIELD PLAF-PLNUM |
|
| 224 | PLAF - PLSCN | Planning Scenario of Long-Term Planning | SOURCE PLAF-PLSCN |
|
| 225 | PLAF - PLSCN | Planning Scenario of Long-Term Planning | SOURCE PLAF-PLSCN |
|
| 226 | PLAF - PLWRK | Planning Plant | SOURCE FIELD PLAF-PLWRK |
|
| 227 | PLAF - PLWRK | Planning Plant | SOURCE MODULE CHECK_PLWRK. |
|
| 228 | PLAF - PLWRK | Planning Plant | SOURCE FIELD PLAF-PLWRK. |
|
| 229 | PLAF - PLWRK | Planning Plant | SOURCE PLAF-PLWRK |
|
| 230 | PLAF - PLWRK | Planning Plant | SOURCE PLAF-PLWRK |
|
| 231 | PLAF - PSPEL | WBS Element | SOURCE FIELD PLAF-PSPEL MODULE CHECK_PSPEL_PR ON REQUEST. |
|
| 232 | PLAF - PSPEL | WBS Element | SOURCE FIELD PLAF-PSPEL. |
|
| 233 | PLAF - PSPEL | WBS Element | SOURCE PLAF-PSPEL |
|
| 234 | PLAF - PSPEL | WBS Element | SOURCE PLAF-PSPEL |
|
| 235 | PLAF - PSTTI | Start Time of Planned Order | SOURCE PLAF-PSTTI |
|
| 236 | PLAF - PSTTR | Order start date in planned order | SOURCE PLAF-PSTTR |
|
| 237 | PLAF - PSTTR | Order start date in planned order | SOURCE PLAF-PSTTR |
|
| 238 | PLAF - PSTTR | Order start date in planned order | SOURCE FIELD PLAF-PSTTR. |
|
| 239 | PLAF - PSTTR | Order start date in planned order | SOURCE FIELD PLAF-PSTTR. |
|
| 240 | PLAF - PSTTR | Order start date in planned order | SOURCE FIELD PLAF-PSTTR. |
|
| 241 | PLAF - PSTTR | Order start date in planned order | SOURCE FIELD PLAF-PSTTR. |
|
| 242 | PLAF - PSTTR | Order start date in planned order | SOURCE FIELD PLAF-PSTTR. |
|
| 243 | PLAF - PSTTR | Order start date in planned order | SOURCE FIELD PLAF-PSTTR. |
|
| 244 | PLAF - PSTTR | Order start date in planned order | SOURCE PLAF-PSTTR |
|
| 245 | PLAF - PSTTR | Order start date in planned order | SOURCE PLAF-PSTTR |
|
| 246 | PLAF - PSTTR | Order start date in planned order | SOURCE PLAF-PSTTR |
|
| 247 | PLAF - PSTTR | Order start date in planned order | SOURCE PLAF-PSTTR |
|
| 248 | PLAF - PSTTR | Order start date in planned order | SOURCE PLAF-PSTTR |
|
| 249 | PLAF - PSTTR | Order start date in planned order | SOURCE PLAF-PSTTR |
|
| 250 | PLAF - PSTTR | Order start date in planned order | SOURCE FIELD PLAF-PSTTR. |
|
| 251 | PLAF - PSTTR | Order start date in planned order | SOURCE FIELD PLAF-PSTTR. |
|
| 252 | PLAF - PSTTR | Order start date in planned order | SOURCE FIELD PLAF-PSTTR. |
|
| 253 | PLAF - PWWRK | Production plant in planned order | SOURCE PLAF-PWWRK |
|
| 254 | PLAF - PWWRK | Production plant in planned order | SOURCE PLAF-PWWRK |
|
| 255 | PLAF - PWWRK | Production plant in planned order | SOURCE FIELD PLAF-PWWRK. |
|
| 256 | PLAF - PWWRK | Production plant in planned order | SOURCE MODULE CHECK_PWWRK. |
|
| 257 | PLAF - PWWRK | Production plant in planned order | SOURCE FIELD PLAF-PWWRK |
|
| 258 | PLAF - QUNUM | Number of quota arrangement | SOURCE PLAF-QUNUM |
|
| 259 | PLAF - QUNUM | Number of quota arrangement | SOURCE PLAF-QUNUM |
|
| 260 | PLAF - QUPOS | Quota arrangement item | SOURCE PLAF-QUPOS |
|
| 261 | PLAF - REMFL | Repetitive Manufacturing indicator | SOURCE PLAF-REMFL |
|
| 262 | PLAF - REMFL | Repetitive Manufacturing indicator | SOURCE PLAF-REMFL |
|
| 263 | PLAF - RESLO | Issuing Storage Location for Stock Transport Order | SOURCE FIELD PLAF-RESLO. |
|
| 264 | PLAF - RESLO | Issuing Storage Location for Stock Transport Order | SOURCE PLAF-RESLO |
|
| 265 | PLAF - RESLO | Issuing Storage Location for Stock Transport Order | SOURCE PLAF-RESLO |
|
| 266 | PLAF - REVLV | Revision level | SOURCE PLAF-REVLV |
|
| 267 | PLAF - REVLV | Revision level | SOURCE PLAF-REVLV |
|
| 268 | PLAF - SEQNR | Seq. number order | SOURCE PLAF-SEQNR |
|
| 269 | PLAF - SEQNR | Seq. number order | SOURCE PLAF-SEQNR |
|
| 270 | PLAF - SEQNR | Seq. number order | SOURCE PLAF-SEQNR |
|
| 271 | PLAF - SEQNR | Seq. number order | SOURCE PLAF-SEQNR |
|
| 272 | PLAF - SERNR | BOM explosion number | SOURCE FIELD PLAF-SERNR. |
|
| 273 | PLAF - SERNR | BOM explosion number | SOURCE FIELD PLAF-SERNR. |
|
| 274 | PLAF - SERNR | BOM explosion number | SOURCE PLAF-SERNR |
|
| 275 | PLAF - SERNR | BOM explosion number | SOURCE PLAF-SERNR |
|
| 276 | PLAF - SOBES | Special procurement type | SOURCE PLAF-SOBES |
|
| 277 | PLAF - SOBKZ | Special Stock Indicator | SOURCE PLAF-SOBKZ |
|
| 278 | PLAF - SOBKZ | Special Stock Indicator | SOURCE PLAF-SOBKZ |
|
| 279 | PLAF - SRM_CONTRACT_ID | Central Contract | SOURCE FIELD: PLAF-KONNR, PLAF-KTPNR, |
|
| 280 | PLAF - SRM_CONTRACT_ID | Central Contract | SOURCE PLAF-SRM_CONTRACT_ID, |
|
| 281 | PLAF - SRM_CONTRACT_ID | Central Contract | SOURCE PLAF-SRM_CONTRACT_ITM |
|
| 282 | PLAF - SRM_CONTRACT_ID | Central Contract | SOURCE MODULE CHECK_CTR_IDS ON CHAIN-REQUEST. |
|
| 283 | PLAF - SRM_CONTRACT_ID | Central Contract | SOURCE FIELD PLAF-SRM_CONTRACT_ID. |
|
| 284 | PLAF - SRM_CONTRACT_ID | Central Contract | SOURCE PLAF-SRM_CONTRACT_ID |
|
| 285 | PLAF - SRM_CONTRACT_ID | Central Contract | SOURCE PLAF-SRM_CONTRACT_ID |
|
| 286 | PLAF - SRM_CONTRACT_ITM | Central Contract Item Number | SOURCE FIELD: PLAF-KONNR, PLAF-KTPNR, |
|
| 287 | PLAF - SRM_CONTRACT_ITM | Central Contract Item Number | SOURCE PLAF-SRM_CONTRACT_ID, |
|
| 288 | PLAF - SRM_CONTRACT_ITM | Central Contract Item Number | SOURCE PLAF-SRM_CONTRACT_ITM |
|
| 289 | PLAF - SRM_CONTRACT_ITM | Central Contract Item Number | SOURCE MODULE CHECK_CTR_IDS ON CHAIN-REQUEST. |
|
| 290 | PLAF - SRM_CONTRACT_ITM | Central Contract Item Number | SOURCE FIELD PLAF-SRM_CONTRACT_ITM. |
|
| 291 | PLAF - SRM_CONTRACT_ITM | Central Contract Item Number | SOURCE PLAF-SRM_CONTRACT_ITM |
|
| 292 | PLAF - STALT | Alternative BOM | SOURCE PLAF-STALT |
|
| 293 | PLAF - STALT | Alternative BOM | SOURCE PLAF-STALT |
|
| 294 | PLAF - STLAN | BOM Usage | SOURCE PLAF-STLAN |
|
| 295 | PLAF - STLAN | BOM Usage | SOURCE PLAF-STLAN |
|
| 296 | PLAF - STLFX | Fixing indicator for BOM explosion | SOURCE FIELD PLAF-STLFX. |
|
| 297 | PLAF - STLFX | Fixing indicator for BOM explosion | SOURCE PLAF-STLFX |
|
| 298 | PLAF - STLFX | Fixing indicator for BOM explosion | SOURCE PLAF-STLFX |
|
| 299 | PLAF - STSTA | BOM Statuses | SOURCE PLAF-STSTA |
|
| 300 | PLAF - STSTA | BOM Statuses | SOURCE PLAF-STSTA |
|
| 301 | PLAF - TERED | Finish date for production | SOURCE PLAF-TERED |
|
| 302 | PLAF - TERST | Start date for production | SOURCE PLAF-TERST |
|
| 303 | PLAF - TLMNG | Partial lot quantity | SOURCE PLAF-TLMNG |
|
| 304 | PLAF - TLMNG | Partial lot quantity | SOURCE PLAF-TLMNG |
|
| 305 | PLAF - TLMNG | Partial lot quantity | SOURCE FIELD PLAF-TLMNG. |
|
| 306 | PLAF - TLMNG | Partial lot quantity | SOURCE FIELD PLAF-TLMNG. |
|
| 307 | PLAF - TLMNG | Partial lot quantity | SOURCE PLAF-TLMNG |
|
| 308 | PLAF - TLMNG | Partial lot quantity | SOURCE PLAF-TLMNG |
|
| 309 | PLAF - TLMNG | Partial lot quantity | SOURCE FIELD PLAF-TLMNG. |
|
| 310 | PLAF - TLMNG | Partial lot quantity | SOURCE FIELD PLAF-TLMNG. |
|
| 311 | PLAF - UMSKZ | Conversion indicator for planned order | SOURCE FIELD PLAF-UMSKZ |
|
| 312 | PLAF - UMSKZ | Conversion indicator for planned order | SOURCE MODULE CHECK_UMSKZ. |
|
| 313 | PLAF - UMSKZ | Conversion indicator for planned order | SOURCE PLAF-UMSKZ |
|
| 314 | PLAF - UMSKZ | Conversion indicator for planned order | SOURCE PLAF-UMSKZ |
|
| 315 | PLAF - VERID | Production Version | SOURCE FIELD PLAF-VERID. |
|
| 316 | PLAF - VERID | Production Version | SOURCE FIELD PLAF-VERID. |
|
| 317 | PLAF - VERID | Production Version | SOURCE PLAF-VERID |
|
| 318 | PLAF - VERID | Production Version | SOURCE PLAF-VERID |
|
| 319 | PLAF - VERID | Production Version | SOURCE PLAF-VERID |
|
| 320 | PLAF - VERID | Production Version | SOURCE PLAF-VERID |
|
| 321 | PLAF - VERTO | Distribution key for quantity produced | SOURCE PLAF-VERTO |
|
| 322 | PLAF - VERTO | Distribution key for quantity produced | SOURCE PLAF-VERTO |
|
| 323 | PLAF - VFMNG | Planned order: committed quantity | SOURCE PLAF-VFMNG |
|
| 324 | PLAF - VFMNG | Planned order: committed quantity | SOURCE PLAF-VFMNG |
|
| 325 | PLAF - WAMNG | Issued quantity | SOURCE PLAF-WAMNG |
|
| 326 | PLAF - WAMNG | Issued quantity | SOURCE PLAF-WAMNG |
|
| 327 | PLAF - WEBAZ | Goods receipt processing time in days | SOURCE PLAF-WEBAZ |
|
| 328 | PLAF - WEBAZ | Goods receipt processing time in days | SOURCE PLAF-WEBAZ |
|
| 329 | PLAF - WEBAZ | Goods receipt processing time in days | SOURCE FIELD PLAF-WEBAZ. "1687273 |
|
| 330 | PLAF - WEBAZ | Goods receipt processing time in days | SOURCE FIELD PLAF-WEBAZ. |
|
| 331 | PLAF - WEBAZ | Goods receipt processing time in days | SOURCE PLAF-WEBAZ |
|
| 332 | PLAF - WEBAZ | Goods receipt processing time in days | SOURCE PLAF-WEBAZ |
|
| 333 | PLAF - WEBAZ | Goods receipt processing time in days | SOURCE FIELD PLAF-WEBAZ. |
|
| 334 | PLAF - WEMNG | Quantity of goods received | SOURCE PLAF-WEMNG |
|
| 335 | PLAF - WEMNG | Quantity of goods received | SOURCE PLAF-WEMNG |
|
| 336 | PLKO - STATU | Status | SOURCE PLKO-STATU |
|
| 337 | PLKO - STATU | Status | SOURCE PLKO-STATU |
|
| 338 | PLKO - VAGRP | Responsible planner group/department | SOURCE PLKO-VAGRP |
|
| 339 | PLKO - VAGRP | Responsible planner group/department | SOURCE PLKO-VAGRP |
|
| 340 | RF61O - BERTX | MRP area text | SOURCE RF61O-BERTX |
|
| 341 | RF61O - BSTDK | Customer purchase order date | SOURCE RF61O-BSTDK |
|
| 342 | RF61O - DSNAM | Name of MRP controller | SOURCE RF61O-DSNAM |
|
| 343 | RF61O - DSTEL | MRP controller's telephone number | SOURCE RF61O-DSTEL |
|
| 344 | RF61O - EKNAM | Description of purchasing group | SOURCE RF61O-EKNAM |
|
| 345 | RF61O - EKTEL | Telephone number of purchasing group (buyer group) | SOURCE RF61O-EKTEL |
|
| 346 | RF61O - FEVTX | Description of production scheduler | SOURCE RF61O-FEVTX |
|
| 347 | RF61O - GLTRS | Scheduled finish | SOURCE RF61O-GLTRS |
|
| 348 | RF61O - GLUZS | Scheduled finish time | SOURCE RF61O-GLUZS |
|
| 349 | RF61O - GSTRS | Scheduled start | SOURCE RF61O-GSTRS |
|
| 350 | RF61O - GSUZS | Scheduled Start (Time) | SOURCE RF61O-GSUZS |
|
| 351 | RF61O - KNTTX | Account Assignment Category Description | SOURCE RF61O-KNTTX |
|
| 352 | RF61O - KOPLN | Leading planned order for direct production | SOURCE RF61O-KOPLN |
|
| 353 | RF61O - KOPLN | Leading planned order for direct production | SOURCE RF61O-KOPLN |
|
| 354 | RF61O - LIFTX | Name 1 | SOURCE RF61O-LIFTX |
|
| 355 | RF61O - MAKTX | Material description | SOURCE RF61O-MAKTX |
|
| 356 | RF61O - MBDAT | Material Staging/Availability Date | SOURCE RF61O-MBDAT |
|
| 357 | RF61O - MDV01 | Aggregation field for production versions | SOURCE RF61O-MDV01 |
|
| 358 | RF61O - MNTGA | Assembly type | SOURCE RF61O-MNTGA |
|
| 359 | RF61O - MNTGA | Assembly type | SOURCE RF61O-MNTGA |
|
| 360 | RF61O - MSGLI | Long text of error message | SOURCE RF61O-MSGLI |
|
| 361 | RF61O - MSGLI | Long text of error message | SOURCE *RF61O-MSGLI |
|
| 362 | RF61O - PLNFL | Sequence | SOURCE RF61O-PLNFL |
|
| 363 | RF61O - SEQQI | Quickinfo for an icon | SOURCE RF61O-SEQQI |
|
| 364 | RF61O - SEQST | Carrier field for icons | SOURCE RF61O-SEQST |
|
| 365 | RF61O - STODA | Availability date from warehouse | SOURCE RF61O-STODA |
|
| 366 | RF61O - STODA | Availability date from warehouse | SOURCE RF61O-STODA |
|
| 367 | RF61O - STODA | Availability date from warehouse | SOURCE RF61O-STODA |
|
| 368 | RF61O - STODA | Availability date from warehouse | SOURCE RF61O-STODA |
|
| 369 | RF61O - STODA | Availability date from warehouse | SOURCE RF61O-STODA |
|
| 370 | RF61O - TLANZ | Number of partial lots | SOURCE FIELD RF61O-TLANZ. |
|
| 371 | RF61O - TLANZ | Number of partial lots | SOURCE FIELD RF61O-TLANZ. |
|
| 372 | RF61O - TLANZ | Number of partial lots | SOURCE RF61O-TLANZ |
|
| 373 | RF61O - TLANZ | Number of partial lots | SOURCE FIELD RF61O-TLANZ. |
|
| 374 | RF61O - TLANZ | Number of partial lots | SOURCE FIELD RF61O-TLANZ. |
|
| 375 | RF61O - TLANZ | Number of partial lots | SOURCE RF61O-TLANZ |
|
| 376 | RF61O - UEAUF | Superior order for direct procurement | SOURCE *RF61O-UEAUF |
|
| 377 | RF61O - UEAUF | Superior order for direct procurement | SOURCE *RF61O-UEAUF |
|
| 378 | RF61O - UEPLN | Superior planned order for direct production/procurement | SOURCE RF61O-UEPLN |
|
| 379 | RF61O - UEPLN | Superior planned order for direct production/procurement | SOURCE RF61O-UEPLN |
|
| 380 | RF61O - UEPLN | Superior planned order for direct production/procurement | SOURCE *RF61O-UEPLN |
|
| 381 | RF61O - UEPLN | Superior planned order for direct production/procurement | SOURCE *RF61O-UEPLN |
|
| 382 | RF61O - WRKTX | Name | SOURCE RF61O-WRKTX |
|
| 383 | T46AT - MDACS | Action code description | SOURCE T46AT-MDACS |
|
| 384 | TC26T - TXT | Description of the capacity category | SOURCE TC26T-TXT |
|
| 385 | TC26T - TXT | Description of the capacity category | SOURCE TC26T-TXT |
|
| 386 | VBAK - BSTDK | Customer purchase order date | SOURCE VBAK-BSTDK |
|
| 387 | VBBE - MBDAT | Material Staging/Availability Date | SOURCE VBBE-MBDAT |