Table/Structure Field list used by SAP ABAP Program RVGTISVA (GTIS General Variables and Screen Variables)
SAP ABAP Program
RVGTISVA (GTIS General Variables and Screen Variables) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | BCSECTION - UNIT | Unit in time axis of bar chart | ||
| 2 | BCSECTION - SIZE | Width of section in time axis of bar chart | ||
| 3 | GGAEL - BEG | SAP Graphics: Seconds since 30.12.1899 | ||
| 4 | GGAEL - DUR | SAP Graphics: Seconds since 30.12.1899 | ||
| 5 | KNA1 - LAND1 | Country Key | ||
| 6 | KNA1 - NAME1 | Name 1 | ||
| 7 | KNA1 - ORT01 | City | ||
| 8 | KNA1 - PSTLZ | Postal Code | ||
| 9 | LFA1 - NAME1 | Name 1 | ||
| 10 | LIKP - LFART | Delivery Type | ||
| 11 | LIKP - VBELN | Delivery | ||
| 12 | NET_GRAPH - WINID | Window ID in graphic | ||
| 13 | NET_NVALS - VAL | Value in value table | ||
| 14 | RV56A - SELKZ | Selection flag | ||
| 15 | SYST - INDEX | ABAP System Field: Loop Index | ||
| 16 | SYST - LILLI | ABAP System Field: Selected List Line | ||
| 17 | SYST - LOOPC | ABAP System Field: Visible Lines of Step Loop | ||
| 18 | VTSP - TKNUM | Shipment Number | ||
| 19 | VTSP - TSNUM | Stage of transport number | ||
| 20 | VTSP - TPNUM | Shipment item | ||
| 21 | VTTK - DPTBG | Planned date for start of shipment | ||
| 22 | VTTK - UPTBG | Planned transport start time | ||
| 23 | VTTK - VSART | Shipping type | ||
| 24 | VTTS - DATBG | Stage: Current date for start of shipment | ||
| 25 | VTTS - DATEN | Stage: Actual Date for End of Shipment | ||
| 26 | VTTS - DPTBG | Stage: Planned date for start of shipment | ||
| 27 | VTTS - DPTEN | Stage: Planned date for end of shipment | ||
| 28 | VTTS - KNOTA | Departure Point | ||
| 29 | VTTS - KNOTZ | Destination point | ||
| 30 | VTTS - TDLNR | Number of forwarding agent in the shipment stage | ||
| 31 | VTTS - TSRFO | Stage of transport sequence | ||
| 32 | VTTS - UATBG | Stage: Current shipment start time | ||
| 33 | VTTS - UATEN | Stage: Actual shipment end time | ||
| 34 | VTTS - UPTBG | Stage: Planned shipment start time | ||
| 35 | VTTS - UPTEN | Stage: Planned shipemnt end time |