Table/Structure Field list used by SAP ABAP Program RPEGMASSF03 (Include RCCPMASSF03)
SAP ABAP Program
RPEGMASSF03 (Include RCCPMASSF03) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | BAL_S_MSG - PROBCLASS | Application log: Message problem class | ||
| 2 | BOOLE - BOOLE | Data element for domain BOOLE: TRUE (='X') and FALSE (=' ') | ||
| 3 | CM61M - VPLAN | Single-Character Flag | ||
| 4 | CM61W - DISPD | Date for planning (basis of comparison for time-phased plng) | ||
| 5 | EKPO - EBELN | Purchasing Document Number | ||
| 6 | EKPO - EBELP | Item Number of Purchasing Document | ||
| 7 | GRPGA - GRPNR | Grouping WBS element | ||
| 8 | GRPGA - PSPNR | Work Breakdown Structure Element (WBS Element) | ||
| 9 | GRPGV - DISGR | MRP Group | ||
| 10 | GRPGV - GRPNR | Grouping WBS element | ||
| 11 | GRPGV - WERKS | Plant | ||
| 12 | LKO74 - LIST | Indicator "Generate Detailed List" | ||
| 13 | MARA - MATNR | Material Number | ||
| 14 | MARC - MATNR | Material Number | ||
| 15 | MDKP - AHDIS | MRP relevancy for dependent requirements | ||
| 16 | MDKP - BESKZ | Procurement Type | ||
| 17 | MDKP - BSTFX | Fixed lot size | ||
| 18 | MDKP - BSTMA | Maximum lot size | ||
| 19 | MDKP - BSTMI | Minimum lot size | ||
| 20 | MDKP - BSTRF | Rounding value for purchase order quantity | ||
| 21 | MDKP - CFLAG | Aggregated MRP list | ||
| 22 | MDKP - DISLS | Lot size (materials planning) | ||
| 23 | MDKP - DISMM | MRP Type | ||
| 24 | MDKP - DISPO | MRP controller | ||
| 25 | MDKP - DISST | Low-level code | ||
| 26 | MDKP - DSDAT | MRP date | ||
| 27 | MDKP - EISBE | Safety stock | ||
| 28 | MDKP - EKGRP | Purchasing group | ||
| 29 | MDKP - FABKZ | Indicator: Item Relevant to JIT Delivery Schedules | ||
| 30 | MDKP - GRREL | Relevant for requirements grouping for project stock | ||
| 31 | MDKP - HOEBE | Maximum stock level | ||
| 32 | MDKP - LFRHY | Planning cycle | ||
| 33 | MDKP - MAABC | ABC indicator | ||
| 34 | MDKP - MATNR | Material Number | ||
| 35 | MDKP - MEINS | Base Unit of Measure | ||
| 36 | MDKP - MINBE | Reorder point | ||
| 37 | MDKP - MRPPP | PPC planning calendar | ||
| 38 | MDKP - MTART | Material type | ||
| 39 | MDKP - PERIV | Fiscal Year Variant | ||
| 40 | MDKP - PLWRK | Plant | ||
| 41 | MDKP - RDPRF | Rounding Profile | ||
| 42 | MDKP - RWPRO | Range of coverage profile | ||
| 43 | MDKP - SAUFT | Ind.: Repetitive mfg allowed | ||
| 44 | MDKP - SHFLG | Safety time indicator (with or without safety time) | ||
| 45 | MDKP - SHPRO | Period profile for safety time | ||
| 46 | MDKP - SHZET | Safety time (in workdays) | ||
| 47 | MDKP - SOBSL | Special procurement type | ||
| 48 | MDKP - WEBAZ | Goods receipt processing time in days | ||
| 49 | MDKP_DATA - AHDIS | MRP relevancy for dependent requirements | ||
| 50 | MDKP_DATA - BESKZ | Procurement Type | ||
| 51 | MDKP_DATA - BSTFX | Fixed lot size | ||
| 52 | MDKP_DATA - BSTMA | Maximum lot size | ||
| 53 | MDKP_DATA - BSTMI | Minimum lot size | ||
| 54 | MDKP_DATA - BSTRF | Rounding value for purchase order quantity | ||
| 55 | MDKP_DATA - CFLAG | Aggregated MRP list | ||
| 56 | MDKP_DATA - DISLS | Lot size (materials planning) | ||
| 57 | MDKP_DATA - DISMM | MRP Type | ||
| 58 | MDKP_DATA - DISPO | MRP controller | ||
| 59 | MDKP_DATA - DISST | Low-level code | ||
| 60 | MDKP_DATA - DSDAT | MRP date | ||
| 61 | MDKP_DATA - EISBE | Safety stock | ||
| 62 | MDKP_DATA - EKGRP | Purchasing group | ||
| 63 | MDKP_DATA - FABKZ | Indicator: Item Relevant to JIT Delivery Schedules | ||
| 64 | MDKP_DATA - GRREL | Relevant for requirements grouping for project stock | ||
| 65 | MDKP_DATA - HOEBE | Maximum stock level | ||
| 66 | MDKP_DATA - LFRHY | Planning cycle | ||
| 67 | MDKP_DATA - MAABC | ABC indicator | ||
| 68 | MDKP_DATA - MEINS | Base Unit of Measure | ||
| 69 | MDKP_DATA - MINBE | Reorder point | ||
| 70 | MDKP_DATA - MRPPP | PPC planning calendar | ||
| 71 | MDKP_DATA - MTART | Material type | ||
| 72 | MDKP_DATA - PERIV | Fiscal Year Variant | ||
| 73 | MDKP_DATA - RDPRF | Rounding Profile | ||
| 74 | MDKP_DATA - RWPRO | Range of coverage profile | ||
| 75 | MDKP_DATA - SAUFT | Ind.: Repetitive mfg allowed | ||
| 76 | MDKP_DATA - SHFLG | Safety time indicator (with or without safety time) | ||
| 77 | MDKP_DATA - SHPRO | Period profile for safety time | ||
| 78 | MDKP_DATA - SHZET | Safety time (in workdays) | ||
| 79 | MDKP_DATA - SOBSL | Special procurement type | ||
| 80 | MDKP_DATA - WEBAZ | Goods receipt processing time in days | ||
| 81 | MDPB - BDZEI | Independent requirements pointer | ||
| 82 | MDPB - BEDAE | Requirements type | ||
| 83 | MDPB - MATNR | Material Number | ||
| 84 | MDPB - PBDNR | Requirements Plan Number | ||
| 85 | MDPB - PDATU | Delivery/order finish date | ||
| 86 | MDPB - PSPEL | Work Breakdown Structure Element (WBS Element) | ||
| 87 | MDPB - VERSB | Version number for independent requirements | ||
| 88 | MDPB - WERKS | Plant | ||
| 89 | MDPS - AUFVR | Source number for order | ||
| 90 | MDPS - BAART | P.O./Order type | ||
| 91 | MDPS - DAT00 | Receipt/Requirements date | ||
| 92 | MDPS - DEL12 | MRP element number | ||
| 93 | MDPS - DELET | Scheduling number planning element | ||
| 94 | MDPS - DELKZ | MRP element | ||
| 95 | MDPS - DELNR | MRP element number | ||
| 96 | MDPS - DELPS | MRP element item | ||
| 97 | MDPS - DELVR | MRP element | ||
| 98 | MDPS - EINVR | Source schedule line number | ||
| 99 | MDPS - MNG01 | Quantity received or quantity required | ||
| 100 | MDPS - PLAAB | Material requirements planning segment | ||
| 101 | MDPS - PLANR | Planning segment number | ||
| 102 | MDPS - PLUMI | Receipt/issue indicator | ||
| 103 | MDPS - POSVR | Source item number | ||
| 104 | MDPS - VERSB | Version number for independent requirements | ||
| 105 | MDPS - VRFKZ | Availability indicator | ||
| 106 | MDRS - PSPEL | WBS Element | ||
| 107 | MDSB - BAUGR | Material number of higher-level assembly | ||
| 108 | MDSB - WERKS | Plant | ||
| 109 | MDSEBX - BAUGR | Material number of higher-level assembly | ||
| 110 | MDSEBX - DELET | Scheduling number planning element | ||
| 111 | MDSEBX - DELKZ | MRP element | ||
| 112 | MDSEBX - DELNR | MRP element number | ||
| 113 | MDSEBX - DELPS | MRP element item | ||
| 114 | MDSEBX - MATNR | Material Number | ||
| 115 | MDSEBX - REKUR | Checkbox | ||
| 116 | MDSEBX - RSEIN | Scheduling number planning element | ||
| 117 | MDSEBX - RSNUM | MRP element number | ||
| 118 | MDSEBX - RSPOS | MRP element item | ||
| 119 | MDSEBX - WERK2 | Plant | ||
| 120 | MDSEBX - WERKS | Plant | ||
| 121 | MDTB - PLANR | Planning segment number | ||
| 122 | MDZU - BAART | P.O./Order type | ||
| 123 | MDZU - DELET | Scheduling number planning element | ||
| 124 | MDZU - DELKZ | MRP element | ||
| 125 | MDZU - DELNR | MRP element number | ||
| 126 | MDZU - DELPS | MRP element item | ||
| 127 | MDZU - MATNR | Material Number | ||
| 128 | MDZU - MNG02 | Quantity received or quantity required | ||
| 129 | MDZU - VERSB | Version number for independent requirements | ||
| 130 | MDZU - WERKS | Plant | ||
| 131 | MT61D - AHDIS | MRP relevancy for dependent requirements | ||
| 132 | MT61D - BESKZ | Procurement Type | ||
| 133 | MT61D - BSTFE | Fixed lot size | ||
| 134 | MT61D - BSTMA | Maximum lot size | ||
| 135 | MT61D - BSTMI | Minimum lot size | ||
| 136 | MT61D - BSTRF | Rounding value for purchase order quantity | ||
| 137 | MT61D - DISGR | MRP Group | ||
| 138 | MT61D - DISLS | Lot size (materials planning) | ||
| 139 | MT61D - DISMM | MRP Type | ||
| 140 | MT61D - DISPO | MRP controller | ||
| 141 | MT61D - DISST | Low-level code | ||
| 142 | MT61D - EISBE | Safety stock | ||
| 143 | MT61D - EKGRP | Purchasing group | ||
| 144 | MT61D - FABKZ | Indicator: Item Relevant to JIT Delivery Schedules | ||
| 145 | MT61D - LFRHY | Planning cycle | ||
| 146 | MT61D - MAABC | ABC indicator | ||
| 147 | MT61D - MABST | Maximum stock level | ||
| 148 | MT61D - MATNR | Material Number | ||
| 149 | MT61D - MEINS | Base Unit of Measure | ||
| 150 | MT61D - MINBE | Reorder point | ||
| 151 | MT61D - MRPPP | PPC planning calendar | ||
| 152 | MT61D - MTART | Material type | ||
| 153 | MT61D - PERIV | Fiscal Year Variant | ||
| 154 | MT61D - RDPRF | Rounding Profile | ||
| 155 | MT61D - RWPRO | Range of coverage profile | ||
| 156 | MT61D - SAUFT | Ind.: Repetitive mfg allowed | ||
| 157 | MT61D - SHFLG | Safety time indicator (with or without safety time) | ||
| 158 | MT61D - SHPRO | Period profile for safety time | ||
| 159 | MT61D - SHZET | Safety time (in workdays) | ||
| 160 | MT61D - SOBSL | Special procurement type | ||
| 161 | MT61D - WEBAZ | Goods receipt processing time in days | ||
| 162 | MT61D - WERKS | Plant | ||
| 163 | PEG_ADMIN - CPUDT | Accounting document entry date | ||
| 164 | PEG_ADMIN - GRPNR | Grouping WBS element | ||
| 165 | PEG_ADMIN - WERKS | Plant | ||
| 166 | PEG_EBAN - BANFN | Purchase requisition number | ||
| 167 | PEG_EBAN - BNFPO | Item number of purchase requisition | ||
| 168 | PEG_EBAN - MATNR | Material Number | ||
| 169 | PEG_EBAN - WERKS | Plant | ||
| 170 | PEG_GROUPTWERKS - GRPNR | Grouping WBS element | ||
| 171 | PEG_GROUPTWERKS - WERKS | Plant | ||
| 172 | PEG_MDBS_SMALL - EBELN | Purchasing Document Number | ||
| 173 | PEG_MDBS_SMALL - EBELP | Item Number of Purchasing Document | ||
| 174 | PEG_MDBS_SMALL - ETENR | Schedule line | ||
| 175 | PEG_MDBS_SMALL - MATNR | Material Number | ||
| 176 | PEG_MDBS_SMALL - PSPNR | WBS Element | ||
| 177 | PEG_MDBS_SMALL - WERKS | Plant | ||
| 178 | PEG_MDFA_SMALL - AFTYP | Order category | ||
| 179 | PEG_MDFA_SMALL - AUFNR | Order Number | ||
| 180 | PEG_MDFA_SMALL - MATNR | Material Number for Order | ||
| 181 | PEG_MDFA_SMALL - PLWRK | Planning plant for the order | ||
| 182 | PEG_MDFA_SMALL - POSNR | Order item number | ||
| 183 | PEG_MDFA_SMALL - PSPEL | Work breakdown structure element (WBS element) | ||
| 184 | PEG_MDFA_SMALL - PWWRK | Plant | ||
| 185 | PEG_MDRS - APLZL | Internal counter | ||
| 186 | PEG_MDRS - AUFPL | Routing number of operations in the order | ||
| 187 | PEG_MDRS - MATNR | Material Number | ||
| 188 | PEG_MDRS - PSPEL | WBS Element | ||
| 189 | PEG_MDRS - RSNUM | Number of reservation/dependent requirements | ||
| 190 | PEG_MDRS - RSPOS | Item Number of Reservation / Dependent Requirements | ||
| 191 | PEG_MDRS - SBTER | Latest requirements date | ||
| 192 | PEG_MDRS - UMWRK | Receiving plant/issuing plant | ||
| 193 | PEG_PLAF - MATNR | Planning material | ||
| 194 | PEG_PLAF - PLNUM | Planned order number | ||
| 195 | PEG_PLAF - PLWRK | Planning Plant | ||
| 196 | PEG_REPLEN - ASQTY | Allocated Quantity | ||
| 197 | PEG_REPLEN - DAT00 | Receipt/Requirements date | ||
| 198 | PEG_REPLEN - GAMNG | Total order quantity | ||
| 199 | PEG_REPLEN - GRPNR | Grouping WBS element | ||
| 200 | PEG_REPLEN - INSTK | Assigned Quantity is in Stock | ||
| 201 | PEG_REPLEN - LQTY | Assigned, Missing Quantity | ||
| 202 | PEG_REPLEN - MATNR | Material Number | ||
| 203 | PEG_REPLEN - MEINS | Base Unit of Measure | ||
| 204 | PEG_REPLEN - OPENQ | Open Quantity (Still to be Assigned) | ||
| 205 | PEG_REPLEN - PRITY | Priority for the address lines | ||
| 206 | PEG_REPLEN - PSPNR | WBS Element | ||
| 207 | PEG_REPLEN - REPOBJ | Object number of replenishment elem. used for static pegging | ||
| 208 | PEG_REPLEN - SCPQTY | Assigned Scrap Quantity | ||
| 209 | PEG_REPLEN - WERKS | Plant | ||
| 210 | PEG_TACTASS - GRPNR | Grouping WBS element | ||
| 211 | PEG_TACTASS - PEGISSUE | Pegging: Date of Goods Issue | ||
| 212 | PEG_TACTASS - WERKS | Plant | ||
| 213 | PEG_TASS - ASQTY | Allocated Quantity | ||
| 214 | PEG_TASS - ASS_PSPNR | Assigned WBS Element | ||
| 215 | PEG_TASS - BRK_OBJNR | Object Number for Breakpoint | ||
| 216 | PEG_TASS - GAMNG | Total Order Quantity | ||
| 217 | PEG_TASS - GRPNR | Grouping WBS element | ||
| 218 | PEG_TASS - INSTK | Assigned Quantity is in Stock | ||
| 219 | PEG_TASS - LQTY | Assigned, Missing Quantity | ||
| 220 | PEG_TASS - MANDT | Client | ||
| 221 | PEG_TASS - MATNR | Material Number | ||
| 222 | PEG_TASS - MEINS | Base Unit of Measure | ||
| 223 | PEG_TASS - REPOBJ | Object Number Replenishment Element | ||
| 224 | PEG_TASS - SCPQTY | Assigned Scrap Quantity | ||
| 225 | PEG_TASS - TOPDAT | Requirements Date for Causing Requirement | ||
| 226 | PEG_TASS - WERKS | Plant | ||
| 227 | PEG_TASS - XSSQTY | Assigned Surplus Quantity | ||
| 228 | PEG_TCTRL - EXC_PSPNR | WBS Element | ||
| 229 | PEG_TCTRL - FIXRL | Pegging Logic | ||
| 230 | PEG_TSTK - GRPNR | Grouping WBS element | ||
| 231 | PEG_TSTK - UPDAT | Date on which object was last changed | ||
| 232 | PEG_TSTK - WERKS | Plant | ||
| 233 | PROJ - PSPNR | Current number for project or project item | ||
| 234 | PRPS - PGPRF | Distribution profile | ||
| 235 | PRPS - PSPNR | WBS Element | ||
| 236 | PRPS2_INC - PGPRF | Distribution profile | ||
| 237 | PRPS_INC - PGPRF | Distribution profile | ||
| 238 | RESB - APLZL | Internal counter | ||
| 239 | SYST - BATCH | ABAP System Field: Background Processing Active | ||
| 240 | SYST - DATLO | ABAP System Field: Local Date of Current User | ||
| 241 | SYST - LANGU | ABAP System Field: Language Key of Text Environment | ||
| 242 | SYST - MANDT | ABAP System Field: Client ID of Current User | ||
| 243 | SYST - MSGV2 | ABAP System Field: Message Variable | ||
| 244 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 245 | SYST - UCOMM | ABAP System Field: PAI-Triggering Function Code | ||
| 246 | T001W - WERKS | Plant | ||
| 247 | T399D - COMPM | Transparent storage: MRP lists | ||
| 248 | T438A - DISMM | MRP Type | ||
| 249 | TBLP - GRPS | Transfer Posting on Grouping WBS Element Level | ||
| 250 | TBLP - POSNR_R | Receiver WBS element | ||
| 251 | TBLP - POSNR_S | Sender WBS element | ||
| 252 | TBLP - TLIND | Indicator for Transfer/Loan | ||
| 253 | VBBE - ETENR | Schedule line | ||
| 254 | VBBE - POSNR | Sales Document Item | ||
| 255 | VBBE - PSPEL | WBS Element | ||
| 256 | VBBE - VBELN | Sales Document |