Table/Structure Field list used by SAP ABAP Program RJBRSVA39 (ALM Simulation)
SAP ABAP Program
RJBRSVA39 (ALM Simulation) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | ATRMO - AUSWT | Evaluation type in Risk Management | ||
| 2 | ATSYC - AUSWT | Evaluation type in Risk Management | ||
| 3 | JBAPLANV - BUKRS | Company Code | ||
| 4 | JBAPLANV - PHID | Portfolio Hierarchy | ||
| 5 | JBAPLANV - RPLANV | Planning Variant | ||
| 6 | JBAPLANV - SICHTID | View of an Analysis Structure | ||
| 7 | JBAPLANV - VERDREGEL | Summarization Rule | ||
| 8 | JBIGAPP0 - PSAVE | RM Gap Analysis: Saving of Calculated Results | ||
| 9 | JBIGAPP0 - SZVERLAUF | Scenario Progression | ||
| 10 | JBIGAPP0 - SZENWAHL | Selection of Scenario or Scenario Progression | ||
| 11 | JBIGAPP0 - SZENA | Scenario | ||
| 12 | JBIGAPP0 - SPREADAUSWEIS | Processing Indicator for Spreads | ||
| 13 | JBIGAPP0 - SELDAT | ALM: Evaluation Date | ||
| 14 | JBIGAPP0 - LFDNR | RM Gap/ALM Sequence No. of a Scenario or Scen. Progression | ||
| 15 | JBIGAPP0 - DETAILPROT | Detailed Log | ||
| 16 | JBIGAPP1 - SAVE_ID | ID of a saved gap evaluation result | ||
| 17 | JBIGAPP1 - SAVE_TEXT | Short Name | ||
| 18 | JBIGAPP2 - ANZGW | Evaluation Currency for Gap Analysis | ||
| 19 | JBIGAPP2 - RMBID | Analysis Structure | ||
| 20 | JBIGAPP2 - DATUM | ALM: Horizon | ||
| 21 | JBIGAPP4 - FMODPLAN | Indicator for Modifying the Planning Variant | ||
| 22 | JBIGAPP4 - RPLANV | Planning Variant | ||
| 23 | JBIGAPP4 - RPLANVPROT | Log of Elasticity | ||
| 24 | JBRBG2 - GAPART | ALM Valuation Type | ||
| 25 | JBRDBRTBSTD - RIDBSTD | Internal Number for Position of Generic Transactions | ||
| 26 | JBRDBSIMLF - RSIMLFNR | Number of a Simulation Run or Planning Run | ||
| 27 | JBRGAPPARAMETER - SZVERLAUF | Scenario Progression | ||
| 28 | JBRGAPPARAMETER - SZENWAHL | Selection of Scenario or Scenario Progression | ||
| 29 | JBRGAPPARAMETER - SZENA | Scenario | ||
| 30 | JBRGAPPARAMETER - SPREADAUSWEIS | Processing Indicator for Spreads | ||
| 31 | JBRGAPPARAMETER - SONE_ALL | Simulation Based on One or All Scenario Progressions | ||
| 32 | JBRGAPPARAMETER - SELDAT | ALM: Evaluation Date | ||
| 33 | JBRGAPPARAMETER - SAVE_TEXT | Short Name | ||
| 34 | JBRGAPPARAMETER - SAVE_ID | ID of a saved gap evaluation result | ||
| 35 | JBRGAPPARAMETER - RPLANV | Planning Variant | ||
| 36 | JBRGAPPARAMETER - RPLANVPROT | Log of Elasticity | ||
| 37 | JBRGAPPARAMETER - ANZGW | Evaluation Currency for Gap Analysis | ||
| 38 | JBRGAPPARAMETER - DATUM | ALM: Horizon | ||
| 39 | JBRGAPPARAMETER - DETAILPROT | Detailed Log | ||
| 40 | JBRGAPPARAMETER - FMODPLAN | Indicator for Modifying the Planning Variant | ||
| 41 | JBRGAPPARAMETER - LFDNR | RM Gap/ALM Sequence No. of a Scenario or Scen. Progression | ||
| 42 | JBRGAPPARAMETER - PSAVE | RM Gap Analysis: Saving of Calculated Results | ||
| 43 | JBRGAPPARAMETER - RMBID | Analysis Structure | ||
| 44 | JBRLZB - LZB | Maturity Band | ||
| 45 | JBRLZBP - LZB | Maturity Band | ||
| 46 | JBRPHBAUM - PKNOTEN | Node in Portfolio Hierarchy | ||
| 47 | JBRPHBAUM1 - PHID | Portfolio Hierarchy | ||
| 48 | JBRPHBAUMS - PHID | Portfolio Hierarchy | ||
| 49 | JBRPHBAUMS - PKNOTEN | Node in Portfolio Hierarchy | ||
| 50 | JBRPHBAUMS - SICHTID | View of an Analysis Structure | ||
| 51 | JBRSI - SICHTID | View of an Analysis Structure | ||
| 52 | JBRSIM - SICHTID | View of an Analysis Structure | ||
| 53 | JBRSVADOKU - SZVERLAUF | Scenario Progression | ||
| 54 | JBRSVADOKU - SZENA | Scenario | ||
| 55 | JBRSVGAPRES2 - SAVE_ID | ID of a saved gap evaluation result | ||
| 56 | JBRSZENRAN - LOW | Scenario | ||
| 57 | JBRSZTAB - FLAGSZ | Selection of Scenario or Scenario Progression | ||
| 58 | JBRSZTAB - LFDNR | RM Gap/ALM Sequence No. of a Scenario or Scen. Progression | ||
| 59 | JBRSZTAB - SZENA | Scenario | ||
| 60 | JBRSZTAB - SZVERLAUF | Scenario progression | ||
| 61 | SSCRFIELDS - UCOMM | Function Code | ||
| 62 | SYST - MSGID | ABAP System Field: Message ID | ||
| 63 | SYST - UZEIT | ABAP System Field: Current Time of Application Server | ||
| 64 | SYST - MSGV4 | ABAP System Field: Message Variable | ||
| 65 | SYST - MSGV3 | ABAP System Field: Message Variable | ||
| 66 | SYST - MSGV2 | ABAP System Field: Message Variable | ||
| 67 | SYST - MSGV1 | ABAP System Field: Message Variable | ||
| 68 | SYST - MSGNO | ABAP System Field: Message Number | ||
| 69 | SYST - DATUM | ABAP System Field: Current Date of Application Server | ||
| 70 | SYST - BATCH | ABAP System Field: Background Processing Active | ||
| 71 | TKCKC - APPLC | Application class for drilldown reporting | ||
| 72 | VTVSZKO - SZENARI | Scenario | ||
| 73 | VTVSZVLKO - SZVERLAUF | Scenario progression |