Table/Structure Field list used by SAP ABAP Program RCNHEAD (Excel Value Table - Order Header)
SAP ABAP Program
RCNHEAD (Excel Value Table - Order Header) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AUFK_RMA - POSNR_RMA | Item number of the SD document | ||
| 2 | AUFK_RMA - POSNV_RMA | Item number of the SD document | ||
| 3 | AUFK_RMA - RMANR | Sales and Distribution Document Number | ||
| 4 | CAUFVTAB - ABARB | Confirmation: Degree of processing | ||
| 5 | CAUFVTAB - ABGSL | Results Analysis Key | ||
| 6 | CAUFVTAB - ABKRS | Processing group | ||
| 7 | CAUFVTAB - ADRNRA | Address number | ||
| 8 | CAUFVTAB - AEDAT | Change date for Order Master | ||
| 9 | CAUFVTAB - AENAM | Last changed by | ||
| 10 | CAUFVTAB - AENNR | Change Number | ||
| 11 | CAUFVTAB - AEZEIT | Changed at | ||
| 12 | CAUFVTAB - APLZT | General counter for order | ||
| 13 | CAUFVTAB - APRIO | Order priority | ||
| 14 | CAUFVTAB - ARSNR | Number of reservation/dependent requirements | ||
| 15 | CAUFVTAB - ARSPS | Order item number | ||
| 16 | CAUFVTAB - ASTKZ | Identifier for statistical order | ||
| 17 | CAUFVTAB - ATRKZ | Request ID | ||
| 18 | CAUFVTAB - AUART | Order Type | ||
| 19 | CAUFVTAB - AUFLD | Date of BOM Explosion/Routing Transfer | ||
| 20 | CAUFVTAB - AUFNR | Order Number | ||
| 21 | CAUFVTAB - AUFNT | Number of superior network | ||
| 22 | CAUFVTAB - AUFPL | Routing number of operations in the order | ||
| 23 | CAUFVTAB - AUFPT | Routing number of operations in the order | ||
| 24 | CAUFVTAB - AUTYP | Order category | ||
| 25 | CAUFVTAB - AWSLS | Variance Key | ||
| 26 | CAUFVTAB - BEDID | ID of the capacity requirements record | ||
| 27 | CAUFVTAB - BEMOT | Accounting Indicator | ||
| 28 | CAUFVTAB - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 29 | CAUFVTAB - BUKRS | Company Code | ||
| 30 | CAUFVTAB - CCKEY | Cost collector key | ||
| 31 | CAUFVTAB - CHSCH | Search procedure for batch determination | ||
| 32 | CAUFVTAB - CH_PROC | Process that has lead to the change of an object | ||
| 33 | CAUFVTAB - COLORDPROC | Collective order with/without automatic goods movement | ||
| 34 | CAUFVTAB - COMP_RES | OCM: Result of comparison of two order objects | ||
| 35 | CAUFVTAB - CONF_KEY | Identical object | ||
| 36 | CAUFVTAB - COSTUPD | Costs are updated | ||
| 37 | CAUFVTAB - CSPLIT | Apportionment structure | ||
| 38 | CAUFVTAB - CUOBJ | Configuration (internal object number) | ||
| 39 | CAUFVTAB - CY_SEQNR | Seq. number order | ||
| 40 | CAUFVTAB - DISPO | MRP controller for the order | ||
| 41 | CAUFVTAB - ERDAT | Created on | ||
| 42 | CAUFVTAB - ERFZEIT | Time created | ||
| 43 | CAUFVTAB - ERNAM | Entered by | ||
| 44 | CAUFVTAB - ETYPE | Equity type | ||
| 45 | CAUFVTAB - FEVOR | Production Supervisor | ||
| 46 | CAUFVTAB - FHORI | Scheduling Margin Key for Floats | ||
| 47 | CAUFVTAB - FLG_AOB | Indicator: relationships | ||
| 48 | CAUFVTAB - FLG_ARBEI | Indicator: Default value work is relevant | ||
| 49 | CAUFVTAB - FLG_MLTPS | Order with multiple items | ||
| 50 | CAUFVTAB - FREIZ | Release period (in days) | ||
| 51 | CAUFVTAB - FTRMI | Actual release date | ||
| 52 | CAUFVTAB - FTRMP | Planned release date | ||
| 53 | CAUFVTAB - FTRMS | Scheduled release date | ||
| 54 | CAUFVTAB - FTRPS | Scheduled release date (forecast) | ||
| 55 | CAUFVTAB - FUNC_AREA | Functional Area | ||
| 56 | CAUFVTAB - GAMNG | Total order quantity | ||
| 57 | CAUFVTAB - GASMG | Total scrap quantity in the order | ||
| 58 | CAUFVTAB - GETRI | Confirmed Order Finish Date | ||
| 59 | CAUFVTAB - GEUZI | Confirmed order finish (time) | ||
| 60 | CAUFVTAB - GLTPP | Finish date (forecast) | ||
| 61 | CAUFVTAB - GLTPS | Scheduled forecast finish | ||
| 62 | CAUFVTAB - GLTRI | Actual finish date | ||
| 63 | CAUFVTAB - GLTRP | Basic finish date | ||
| 64 | CAUFVTAB - GLTRS | Scheduled finish | ||
| 65 | CAUFVTAB - GLUPP | Forecast finish (time) | ||
| 66 | CAUFVTAB - GLUPS | Scheduled forecast finish time | ||
| 67 | CAUFVTAB - GLUZP | Basic finish (time) | ||
| 68 | CAUFVTAB - GLUZS | Scheduled finish time | ||
| 69 | CAUFVTAB - GMEIN | Common unit of measure for all order items | ||
| 70 | CAUFVTAB - GROID | ID of the capacity requirements record | ||
| 71 | CAUFVTAB - GSBER | Business Area | ||
| 72 | CAUFVTAB - GSTPP | Forecast start date | ||
| 73 | CAUFVTAB - GSTPS | Scheduled forecast start | ||
| 74 | CAUFVTAB - GSTRI | Actual start date | ||
| 75 | CAUFVTAB - GSTRP | Basic start date | ||
| 76 | CAUFVTAB - GSTRS | Scheduled start | ||
| 77 | CAUFVTAB - GSUPP | Forecast start (time) | ||
| 78 | CAUFVTAB - GSUPS | Scheduled start time (Forecast) | ||
| 79 | CAUFVTAB - GSUZI | Actual start time | ||
| 80 | CAUFVTAB - GSUZP | Basic start time | ||
| 81 | CAUFVTAB - GSUZS | Scheduled Start (Time) | ||
| 82 | CAUFVTAB - IASMG | Scrap confirmed for order | ||
| 83 | CAUFVTAB - IDAT2 | Technical completion date | ||
| 84 | CAUFVTAB - IGMNG | Yield confirmed from order confirmation | ||
| 85 | CAUFVTAB - IVPRO | Investment measure profile | ||
| 86 | CAUFVTAB - IZWEK | Reason for investment | ||
| 87 | CAUFVTAB - JV_JIBCL | JIB/JIBE Class | ||
| 88 | CAUFVTAB - JV_JIBSA | JIB/JIBE Subclass A | ||
| 89 | CAUFVTAB - JV_OCO | JV original cost object | ||
| 90 | CAUFVTAB - KALSM | Costing Sheet | ||
| 91 | CAUFVTAB - KAPPL | Application | ||
| 92 | CAUFVTAB - KAPVERSA | Version of Available Capacity | ||
| 93 | CAUFVTAB - KBED | Ind: do not create capacity requirements | ||
| 94 | CAUFVTAB - KDAUF_AUFK | Sales Order Number | ||
| 95 | CAUFVTAB - KDPOS_AUFK | Item number in Sales Order | ||
| 96 | CAUFVTAB - KKALKR | Indicator: Components will not be costed | ||
| 97 | CAUFVTAB - KLVARI | Costing variant for actual costs | ||
| 98 | CAUFVTAB - KLVARP | Costing variant for planned costs | ||
| 99 | CAUFVTAB - KOKRS | Controlling Area | ||
| 100 | CAUFVTAB - KOSTV | Responsible cost center | ||
| 101 | CAUFVTAB - KSTAR | Settlement cost element | ||
| 102 | CAUFVTAB - KSTEMPF | Indicator: Direct cost collector | ||
| 103 | CAUFVTAB - KTEXT | Description | ||
| 104 | CAUFVTAB - KVEWE | Usage of the Condition Table | ||
| 105 | CAUFVTAB - KZERB | Indicator: Project summarization | ||
| 106 | CAUFVTAB - LEAD_AUFNR | Leading order in current processing | ||
| 107 | CAUFVTAB - LKNOT | Left node in collective order | ||
| 108 | CAUFVTAB - LODIV | Lot size divisor | ||
| 109 | CAUFVTAB - LOEKZ | Deletion flag | ||
| 110 | CAUFVTAB - LTEXT | Long Text Exists | ||
| 111 | CAUFVTAB - MANDT | Client | ||
| 112 | CAUFVTAB - MAUFNR | Number of superior order | ||
| 113 | CAUFVTAB - MZAEHL | Internal counter | ||
| 114 | CAUFVTAB - NAUCOST | Indicator: Do not cost automatically | ||
| 115 | CAUFVTAB - NAUTERM | Indicator: Do not schedule automatically | ||
| 116 | CAUFVTAB - NETZKONT | Indicator for the account assignment of a network(hdr/act.) | ||
| 117 | CAUFVTAB - NOPCOST | Do not calculate planned costs for order | ||
| 118 | CAUFVTAB - NO_DISP | Effective for Materials Planning | ||
| 119 | CAUFVTAB - OBJID | Object ID | ||
| 120 | CAUFVTAB - OBJNR | Object number | ||
| 121 | CAUFVTAB - OBJTYPE | Change indicator | ||
| 122 | CAUFVTAB - OTYPE | Joint Venture Object Type | ||
| 123 | CAUFVTAB - PAENR | Change Number | ||
| 124 | CAUFVTAB - PDATV | Valid-From Date | ||
| 125 | CAUFVTAB - PKOSA | Cost collector for production process PROCNR | ||
| 126 | CAUFVTAB - PLART | Basis for scheduling | ||
| 127 | CAUFVTAB - PLAUF | Date for routing transfer | ||
| 128 | CAUFVTAB - PLGKZ | Identifier for planning with line items | ||
| 129 | CAUFVTAB - PLGRP | Responsible planner group/department | ||
| 130 | CAUFVTAB - PLNAL | Group Counter | ||
| 131 | CAUFVTAB - PLNAW | Application of the task list | ||
| 132 | CAUFVTAB - PLNBEZ | Material Number | ||
| 133 | CAUFVTAB - PLNME | Task list unit of measure | ||
| 134 | CAUFVTAB - PLNNR | Key for Task List Group | ||
| 135 | CAUFVTAB - PLNTY | Task List Type | ||
| 136 | CAUFVTAB - PLSVB | To lot size | ||
| 137 | CAUFVTAB - PLSVN | From Lot Size | ||
| 138 | CAUFVTAB - PNETENDD | Outline finish of collective order (date) | ||
| 139 | CAUFVTAB - PNETENDT | Outline finish time | ||
| 140 | CAUFVTAB - PNETSTARTD | Outline start of collective network (date) | ||
| 141 | CAUFVTAB - PNETSTARTT | Start time of a collective order | ||
| 142 | CAUFVTAB - POSNR_RMA | Item number of the SD document | ||
| 143 | CAUFVTAB - POSNV_RMA | Item number of the SD document | ||
| 144 | CAUFVTAB - PRCTR | Profit Center | ||
| 145 | CAUFVTAB - PROCNR | Production Process | ||
| 146 | CAUFVTAB - PRODNET | Indicator: Order is part of collective order | ||
| 147 | CAUFVTAB - PROFID | Network profile | ||
| 148 | CAUFVTAB - PRONR | Project definition | ||
| 149 | CAUFVTAB - PROTY | Process Category (Procurement/Consumption) | ||
| 150 | CAUFVTAB - PRUEFLOS | Inspection Lot Number | ||
| 151 | CAUFVTAB - PSPEL | Work Breakdown Structure Element (WBS Element) | ||
| 152 | CAUFVTAB - PVERW | Task list usage | ||
| 153 | CAUFVTAB - RATID | ID of the capacity requirements record | ||
| 154 | CAUFVTAB - RDKZP | Reduction indicator for scheduling (forecast) | ||
| 155 | CAUFVTAB - RECID | Recovery Indicator | ||
| 156 | CAUFVTAB - REDKZ | Reduction indicator for scheduling | ||
| 157 | CAUFVTAB - REFNR | Reference order number | ||
| 158 | CAUFVTAB - REVLV | Revision level | ||
| 159 | CAUFVTAB - RGEKZ | Indicator: Backflush | ||
| 160 | CAUFVTAB - RKNOT | Right node of a collective order | ||
| 161 | CAUFVTAB - RMANR | Sales and Distribution Document Number | ||
| 162 | CAUFVTAB - RMNGA | Total confirmed rework quantity | ||
| 163 | CAUFVTAB - RMZHL | Internal counter | ||
| 164 | CAUFVTAB - RSHID | Object ID of the resource | ||
| 165 | CAUFVTAB - RSHTY | Object types of the CIM resource | ||
| 166 | CAUFVTAB - RSNID | Object ID of the resource | ||
| 167 | CAUFVTAB - RSNTY | Object types of the CIM resource | ||
| 168 | CAUFVTAB - RSNUM | Number of reservation/dependent requirements | ||
| 169 | CAUFVTAB - RSORD | Refurbishment order indicator (PM) | ||
| 170 | CAUFVTAB - RUECK | Completion confirmation number for the operation | ||
| 171 | CAUFVTAB - SAENR | Change Number | ||
| 172 | CAUFVTAB - SBMEH | Base Unit of Measure | ||
| 173 | CAUFVTAB - SBMNG | Base quantity | ||
| 174 | CAUFVTAB - SCOPE | Object Class | ||
| 175 | CAUFVTAB - SDATV | Valid-From Date | ||
| 176 | CAUFVTAB - SFCPF | Production Scheduling Profile | ||
| 177 | CAUFVTAB - SICHZ | Float after production (in days) | ||
| 178 | CAUFVTAB - SICHZ_TRM | Scheduled float after production in days | ||
| 179 | CAUFVTAB - SIZECL | Scale of investment objects | ||
| 180 | CAUFVTAB - SLSBS | To Lot Size | ||
| 181 | CAUFVTAB - SLSVN | From Lot Size | ||
| 182 | CAUFVTAB - SPLSTAT | Status of an order in a split hierarchy | ||
| 183 | CAUFVTAB - STATS | Status Profile | ||
| 184 | CAUFVTAB - STLAL | Alternative BOM | ||
| 185 | CAUFVTAB - STLAN | BOM Usage | ||
| 186 | CAUFVTAB - STLBEZ | Material Number | ||
| 187 | CAUFVTAB - STLNR | Bill of Material | ||
| 188 | CAUFVTAB - STLST | BOM Statuses | ||
| 189 | CAUFVTAB - STLTY | BOM Category | ||
| 190 | CAUFVTAB - STUFE | Level (in Multi-Level BOM Explosions) | ||
| 191 | CAUFVTAB - ST_ARBID | Object ID | ||
| 192 | CAUFVTAB - TERHW | Scheduling note from order scheduling | ||
| 193 | CAUFVTAB - TERKZ | Scheduling type | ||
| 194 | CAUFVTAB - TRKZP | Scheduling type (forecast) | ||
| 195 | CAUFVTAB - TRMDT | Date of the last scheduling | ||
| 196 | CAUFVTAB - TXJCD | Tax Jurisdiction | ||
| 197 | CAUFVTAB - UMWKZ | Reason for environmental investment | ||
| 198 | CAUFVTAB - UPTER | Indicator: Change to Scheduled Dates | ||
| 199 | CAUFVTAB - USER4 | Estimated total costs of order | ||
| 200 | CAUFVTAB - VNAME | Joint venture | ||
| 201 | CAUFVTAB - VORGZ | Float before production (in days) | ||
| 202 | CAUFVTAB - VORGZ_TRM | Scheduled float before production in days | ||
| 203 | CAUFVTAB - VSNMR_V | Sales document version number | ||
| 204 | CAUFVTAB - VWEGX | Path (for Multi-Level BOM Explosions) | ||
| 205 | CAUFVTAB - WAERS | Order Currency | ||
| 206 | CAUFVTAB - WEGXX | Path (for Multi-Level BOM Explosions) | ||
| 207 | CAUFVTAB - WERKS | Plant | ||
| 208 | CAUFVTAB - ZAEHL | Internal counter | ||
| 209 | CAUFVTAB - ZKRIZ | Counter for additional criteria | ||
| 210 | CAUFVTAB - ZSCHL | Overhead key | ||
| 211 | GJV_DATA_0 - ETYPE | Equity type | ||
| 212 | GJV_DATA_0 - RECID | Recovery Indicator | ||
| 213 | GJV_DATA_0 - VNAME | Joint venture | ||
| 214 | GJV_DATA_1 - ETYPE | Equity type | ||
| 215 | GJV_DATA_1 - JV_JIBCL | JIB/JIBE Class | ||
| 216 | GJV_DATA_1 - JV_JIBSA | JIB/JIBE Subclass A | ||
| 217 | GJV_DATA_1 - OTYPE | Joint Venture Object Type | ||
| 218 | GJV_DATA_1 - RECID | Recovery Indicator | ||
| 219 | GJV_DATA_1 - VNAME | Joint venture | ||
| 220 | GJV_DATA_4 - ETYPE | Equity type | ||
| 221 | GJV_DATA_4 - JV_JIBCL | JIB/JIBE Class | ||
| 222 | GJV_DATA_4 - JV_JIBSA | JIB/JIBE Subclass A | ||
| 223 | GJV_DATA_4 - JV_OCO | JV original cost object | ||
| 224 | GJV_DATA_4 - OTYPE | Joint Venture Object Type | ||
| 225 | GJV_DATA_4 - RECID | Recovery Indicator | ||
| 226 | GJV_DATA_4 - VNAME | Joint venture | ||
| 227 | IOHEADER - ABARB | Confirmation: Degree of processing | ||
| 228 | IOHEADER - ABGSL | Results Analysis Key | ||
| 229 | IOHEADER - ABKRS | Processing group | ||
| 230 | IOHEADER - ADRNRA | Address number | ||
| 231 | IOHEADER - AEDAT | Change date for Order Master | ||
| 232 | IOHEADER - AENAM | Last changed by | ||
| 233 | IOHEADER - AENNR | Change Number | ||
| 234 | IOHEADER - AEZEIT | Changed at | ||
| 235 | IOHEADER - APLZT | General counter for order | ||
| 236 | IOHEADER - APRIO | Order priority | ||
| 237 | IOHEADER - APROZ | Scrap percentage | ||
| 238 | IOHEADER - ARSNR | Number of reservation/dependent requirements | ||
| 239 | IOHEADER - ARSPS | Order item number | ||
| 240 | IOHEADER - ARTTEXT | Text, 40 Characters Long | ||
| 241 | IOHEADER - ASTEX | User status active | ||
| 242 | IOHEADER - ASTKZ | Identifier for statistical order | ||
| 243 | IOHEADER - ASTTX | Field displaying user status | ||
| 244 | IOHEADER - ATRKZ | Request ID | ||
| 245 | IOHEADER - AUART | Order Type | ||
| 246 | IOHEADER - AUDISP | Ind: Reservation applicable to MRP;Purc. req. is created | ||
| 247 | IOHEADER - AUFLD | Date of BOM Explosion/Routing Transfer | ||
| 248 | IOHEADER - AUFNR | Order Number | ||
| 249 | IOHEADER - AUFNT | Number of superior network | ||
| 250 | IOHEADER - AUFPL | Routing number of operations in the order | ||
| 251 | IOHEADER - AUFPT | Routing number of operations in the order | ||
| 252 | IOHEADER - AUTYP | Order category | ||
| 253 | IOHEADER - AWSLS | Variance Key | ||
| 254 | IOHEADER - BAUMNG | Base quantity | ||
| 255 | IOHEADER - BEDID | ID of the capacity requirements record | ||
| 256 | IOHEADER - BEMOT | Accounting Indicator | ||
| 257 | IOHEADER - BMEINS | Base Unit of Measure | ||
| 258 | IOHEADER - BMENGE | Base quantity | ||
| 259 | IOHEADER - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 260 | IOHEADER - BSDIF | Difference betw. rqmts. date and order date in fact.cal.days | ||
| 261 | IOHEADER - BSFAK | Confirmation factor confirmed qty. for order quantity | ||
| 262 | IOHEADER - BUKRS | Company Code | ||
| 263 | IOHEADER - CCKEY | Cost collector key | ||
| 264 | IOHEADER - CHARG | Batch Number | ||
| 265 | IOHEADER - CHSCH | Search procedure for batch determination | ||
| 266 | IOHEADER - CH_PROC | Process that has lead to the change of an object | ||
| 267 | IOHEADER - COLORDPROC | Collective order with/without automatic goods movement | ||
| 268 | IOHEADER - COMP_RES | OCM: Result of comparison of two order objects | ||
| 269 | IOHEADER - CONF_KEY | Identical object | ||
| 270 | IOHEADER - COSTUPD | Costs are updated | ||
| 271 | IOHEADER - CREA_APL | Application code, where the order/network was created | ||
| 272 | IOHEADER - CSPLIT | Apportionment structure | ||
| 273 | IOHEADER - CUOBJ | Configuration (internal object number) | ||
| 274 | IOHEADER - CY_SEQNR | Seq. number order | ||
| 275 | IOHEADER - DISPO | MRP controller for the order | ||
| 276 | IOHEADER - ERDAT | Created on | ||
| 277 | IOHEADER - ERFZEIT | Time created | ||
| 278 | IOHEADER - ERNAM | Entered by | ||
| 279 | IOHEADER - ETYPE | Equity type | ||
| 280 | IOHEADER - FEVOR | Production Supervisor | ||
| 281 | IOHEADER - FHORI | Scheduling Margin Key for Floats | ||
| 282 | IOHEADER - FLG_AOB | Indicator: relationships | ||
| 283 | IOHEADER - FLG_ARBEI | Indicator: Default value work is relevant | ||
| 284 | IOHEADER - FLG_MLTPS | Order with multiple items | ||
| 285 | IOHEADER - FREIZ | Release period (in days) | ||
| 286 | IOHEADER - FTRMI | Actual release date | ||
| 287 | IOHEADER - FTRMP | Planned release date | ||
| 288 | IOHEADER - FTRMS | Scheduled release date | ||
| 289 | IOHEADER - FTRPS | Scheduled release date (forecast) | ||
| 290 | IOHEADER - FUNC_AREA | Functional Area | ||
| 291 | IOHEADER - GAMNG | Total order quantity | ||
| 292 | IOHEADER - GASMG | Total scrap quantity in the order | ||
| 293 | IOHEADER - GETRI | Confirmed Order Finish Date | ||
| 294 | IOHEADER - GEUZI | Confirmed order finish (time) | ||
| 295 | IOHEADER - GIAMG | Expected variance from planned qty to be delivered to stock | ||
| 296 | IOHEADER - GLTPP | Finish date (forecast) | ||
| 297 | IOHEADER - GLTPS | Scheduled forecast finish | ||
| 298 | IOHEADER - GLTRI | Actual finish date | ||
| 299 | IOHEADER - GLTRP | Basic finish date | ||
| 300 | IOHEADER - GLTRS | Scheduled finish | ||
| 301 | IOHEADER - GLUPP | Forecast finish (time) | ||
| 302 | IOHEADER - GLUPS | Scheduled forecast finish time | ||
| 303 | IOHEADER - GLUZP | Basic finish (time) | ||
| 304 | IOHEADER - GLUZS | Scheduled finish time | ||
| 305 | IOHEADER - GMEIN | Common unit of measure for all order items | ||
| 306 | IOHEADER - GROID | ID of the capacity requirements record | ||
| 307 | IOHEADER - GSBER | Business Area | ||
| 308 | IOHEADER - GSBTR | Overall commitment date | ||
| 309 | IOHEADER - GSTPP | Forecast start date | ||
| 310 | IOHEADER - GSTPS | Scheduled forecast start | ||
| 311 | IOHEADER - GSTRI | Actual start date | ||
| 312 | IOHEADER - GSTRP | Basic start date | ||
| 313 | IOHEADER - GSTRS | Scheduled start | ||
| 314 | IOHEADER - GSUPP | Forecast start (time) | ||
| 315 | IOHEADER - GSUPS | Scheduled start time (Forecast) | ||
| 316 | IOHEADER - GSUZI | Actual start time | ||
| 317 | IOHEADER - GSUZP | Basic start time | ||
| 318 | IOHEADER - GSUZS | Scheduled Start (Time) | ||
| 319 | IOHEADER - GWEMG | Delivered quantity | ||
| 320 | IOHEADER - IAPRZ | Scrap percentage | ||
| 321 | IOHEADER - IASMG | Scrap confirmed for order | ||
| 322 | IOHEADER - ICON_MSGTY | Application Log: Message Type Visualization | ||
| 323 | IOHEADER - IDAT2 | Technical completion date | ||
| 324 | IOHEADER - IGMNG | Yield confirmed from order confirmation | ||
| 325 | IOHEADER - INDEX_NODE | Field defined as in SY-TABIX | ||
| 326 | IOHEADER - IVPRO | Investment measure profile | ||
| 327 | IOHEADER - IZWEK | Reason for investment | ||
| 328 | IOHEADER - JV_JIBCL | JIB/JIBE Class | ||
| 329 | IOHEADER - JV_JIBSA | JIB/JIBE Subclass A | ||
| 330 | IOHEADER - JV_OCO | JV original cost object | ||
| 331 | IOHEADER - KALSM | Costing Sheet | ||
| 332 | IOHEADER - KAPPL | Application | ||
| 333 | IOHEADER - KAPVERSA | Version of Available Capacity | ||
| 334 | IOHEADER - KBED | Ind: do not create capacity requirements | ||
| 335 | IOHEADER - KDAUF_AUFK | Sales Order Number | ||
| 336 | IOHEADER - KDPOS_AUFK | Item number in Sales Order | ||
| 337 | IOHEADER - KKALKR | Indicator: Components will not be costed | ||
| 338 | IOHEADER - KLVARI | Costing variant for actual costs | ||
| 339 | IOHEADER - KLVARP | Costing variant for planned costs | ||
| 340 | IOHEADER - KOKRS | Controlling Area | ||
| 341 | IOHEADER - KOSTV | Responsible cost center | ||
| 342 | IOHEADER - KSTAR | Settlement cost element | ||
| 343 | IOHEADER - KSTEMPF | Indicator: Direct cost collector | ||
| 344 | IOHEADER - KTEXT | Description | ||
| 345 | IOHEADER - KVEWE | Usage of the Condition Table | ||
| 346 | IOHEADER - KZAVC | Indicator for type of availability check | ||
| 347 | IOHEADER - KZERB | Indicator: Project summarization | ||
| 348 | IOHEADER - KZ_MARK | Single-Character Flag | ||
| 349 | IOHEADER - K_SALDO | Order balance in controlling-area currency | ||
| 350 | IOHEADER - LEAD_AUFNR | Leading order in current processing | ||
| 351 | IOHEADER - LKNOT | Left node in collective order | ||
| 352 | IOHEADER - LODIV | Lot size divisor | ||
| 353 | IOHEADER - LOEKZ | Deletion flag | ||
| 354 | IOHEADER - LOSGR | Costing lot size | ||
| 355 | IOHEADER - LTEXT | Long Text Exists | ||
| 356 | IOHEADER - MANDT | Client | ||
| 357 | IOHEADER - MATNR | Material Number for Order | ||
| 358 | IOHEADER - MATXT | Material description | ||
| 359 | IOHEADER - MAUFNR | Number of superior order | ||
| 360 | IOHEADER - MDV01 | Production line | ||
| 361 | IOHEADER - MDV02 | Planning identification 2 | ||
| 362 | IOHEADER - MIMEZ | Expected yield variance | ||
| 363 | IOHEADER - MSGTY | Message Category in Availability Log | ||
| 364 | IOHEADER - MZAEHL | Internal counter | ||
| 365 | IOHEADER - M_BAUGR | Superior assembly | ||
| 366 | IOHEADER - NAUCOST | Indicator: Do not cost automatically | ||
| 367 | IOHEADER - NAUTERM | Indicator: Do not schedule automatically | ||
| 368 | IOHEADER - NETZKONT | Indicator for the account assignment of a network(hdr/act.) | ||
| 369 | IOHEADER - NOPCOST | Do not calculate planned costs for order | ||
| 370 | IOHEADER - NO_DISP | Effective for Materials Planning | ||
| 371 | IOHEADER - OBJID | Object ID | ||
| 372 | IOHEADER - OBJNR | Object number | ||
| 373 | IOHEADER - OBJTYPE | Change indicator | ||
| 374 | IOHEADER - OTYPE | Joint Venture Object Type | ||
| 375 | IOHEADER - O_SALDO | Order balance in order currency | ||
| 376 | IOHEADER - PAENR | Change Number | ||
| 377 | IOHEADER - PDATV | Valid-From Date | ||
| 378 | IOHEADER - PKOSA | Cost collector for production process PROCNR | ||
| 379 | IOHEADER - PLART | Basis for scheduling | ||
| 380 | IOHEADER - PLAUF | Date for routing transfer | ||
| 381 | IOHEADER - PLGKZ | Identifier for planning with line items | ||
| 382 | IOHEADER - PLGRP | Responsible planner group/department | ||
| 383 | IOHEADER - PLNAL | Group Counter | ||
| 384 | IOHEADER - PLNAW | Application of the task list | ||
| 385 | IOHEADER - PLNBEZ | Material Number | ||
| 386 | IOHEADER - PLNME | Task list unit of measure | ||
| 387 | IOHEADER - PLNNR | Key for Task List Group | ||
| 388 | IOHEADER - PLNTY | Task List Type | ||
| 389 | IOHEADER - PLSVB | To lot size | ||
| 390 | IOHEADER - PLSVN | From Lot Size | ||
| 391 | IOHEADER - PLWRK | Planning Plant | ||
| 392 | IOHEADER - PNETENDD | Outline finish of collective order (date) | ||
| 393 | IOHEADER - PNETENDT | Outline finish time | ||
| 394 | IOHEADER - PNETSTARTD | Outline start of collective network (date) | ||
| 395 | IOHEADER - PNETSTARTT | Start time of a collective order | ||
| 396 | IOHEADER - POSID | Work Breakdown Structure Element (WBS Element) | ||
| 397 | IOHEADER - POSNR_RMA | Item number of the SD document | ||
| 398 | IOHEADER - POSNV_RMA | Item number of the SD document | ||
| 399 | IOHEADER - PRCTR | Profit Center | ||
| 400 | IOHEADER - PROBCLASS | Application Log: Log problem class | ||
| 401 | IOHEADER - PROCNR | Production Process | ||
| 402 | IOHEADER - PRODNET | Indicator: Order is part of collective order | ||
| 403 | IOHEADER - PROFID | Network profile | ||
| 404 | IOHEADER - PROJN | Work Breakdown Structure Element (WBS Element) | ||
| 405 | IOHEADER - PRONR | Project definition | ||
| 406 | IOHEADER - PROTY | Process Category (Procurement/Consumption) | ||
| 407 | IOHEADER - PROZENT | Unit for the Rate (Percent) | ||
| 408 | IOHEADER - PRUEFLOS | Inspection Lot Number | ||
| 409 | IOHEADER - PSPEL | Work Breakdown Structure Element (WBS Element) | ||
| 410 | IOHEADER - PSPEX | ID/Object key | ||
| 411 | IOHEADER - PVERW | Task list usage | ||
| 412 | IOHEADER - RATID | ID of the capacity requirements record | ||
| 413 | IOHEADER - RDKZP | Reduction indicator for scheduling (forecast) | ||
| 414 | IOHEADER - RECID | Recovery Indicator | ||
| 415 | IOHEADER - REDKZ | Reduction indicator for scheduling | ||
| 416 | IOHEADER - REFNR | Reference order number | ||
| 417 | IOHEADER - RETCODE | Result of availability check | ||
| 418 | IOHEADER - REVLV | Revision level | ||
| 419 | IOHEADER - RGEKZ | Indicator: Backflush | ||
| 420 | IOHEADER - RKNOT | Right node of a collective order | ||
| 421 | IOHEADER - RMANR | Sales and Distribution Document Number | ||
| 422 | IOHEADER - RMNGA | Total confirmed rework quantity | ||
| 423 | IOHEADER - RMZHL | Internal counter | ||
| 424 | IOHEADER - RSHID | Object ID of the resource | ||
| 425 | IOHEADER - RSHTY | Object types of the CIM resource | ||
| 426 | IOHEADER - RSNID | Object ID of the resource | ||
| 427 | IOHEADER - RSNTY | Object types of the CIM resource | ||
| 428 | IOHEADER - RSNUM | Number of reservation/dependent requirements | ||
| 429 | IOHEADER - RSORD | Refurbishment order indicator (PM) | ||
| 430 | IOHEADER - RUECK | Completion confirmation number for the operation | ||
| 431 | IOHEADER - SAENR | Change Number | ||
| 432 | IOHEADER - SAUFNR | Run schedule header number | ||
| 433 | IOHEADER - SBMEH | Base Unit of Measure | ||
| 434 | IOHEADER - SBMNG | Base quantity | ||
| 435 | IOHEADER - SCOPE | Object Class | ||
| 436 | IOHEADER - SDATV | Valid-From Date | ||
| 437 | IOHEADER - SFCPF | Production Scheduling Profile | ||
| 438 | IOHEADER - SICHZ | Float after production (in days) | ||
| 439 | IOHEADER - SICHZ_TRM | Scheduled float after production in days | ||
| 440 | IOHEADER - SIZECL | Scale of investment objects | ||
| 441 | IOHEADER - SLSBS | To Lot Size | ||
| 442 | IOHEADER - SLSVN | From Lot Size | ||
| 443 | IOHEADER - SOBKZ | Special Stock Indicator | ||
| 444 | IOHEADER - SPLSTAT | Status of an order in a split hierarchy | ||
| 445 | IOHEADER - STATS | Status Profile | ||
| 446 | IOHEADER - STLAL | Alternative BOM | ||
| 447 | IOHEADER - STLAN | BOM Usage | ||
| 448 | IOHEADER - STLBEZ | Material Number | ||
| 449 | IOHEADER - STLNR | Bill of Material | ||
| 450 | IOHEADER - STLST | BOM Statuses | ||
| 451 | IOHEADER - STLTY | BOM Category | ||
| 452 | IOHEADER - STTXT | System Status | ||
| 453 | IOHEADER - STUFE | Level (in Multi-Level BOM Explosions) | ||
| 454 | IOHEADER - ST_ARBID | Object ID | ||
| 455 | IOHEADER - TERHW | Scheduling note from order scheduling | ||
| 456 | IOHEADER - TERKZ | Scheduling type | ||
| 457 | IOHEADER - TRKZP | Scheduling type (forecast) | ||
| 458 | IOHEADER - TRMDT | Date of the last scheduling | ||
| 459 | IOHEADER - TXJCD | Tax Jurisdiction | ||
| 460 | IOHEADER - TXTKZ | Long Text Language | ||
| 461 | IOHEADER - TYPKZ | Type of object causing the load (order category) | ||
| 462 | IOHEADER - UMWKZ | Reason for environmental investment | ||
| 463 | IOHEADER - UPTER | Indicator: Change to Scheduled Dates | ||
| 464 | IOHEADER - USER4 | Estimated total costs of order | ||
| 465 | IOHEADER - VFMNG | Committed quantity for order acc. to ATP check components | ||
| 466 | IOHEADER - VNAME | Joint venture | ||
| 467 | IOHEADER - VORGZ | Float before production (in days) | ||
| 468 | IOHEADER - VORGZ_TRM | Scheduled float before production in days | ||
| 469 | IOHEADER - VSNMR_V | Sales document version number | ||
| 470 | IOHEADER - VWEGX | Path (for Multi-Level BOM Explosions) | ||
| 471 | IOHEADER - WAERS | Order Currency | ||
| 472 | IOHEADER - WEGXX | Path (for Multi-Level BOM Explosions) | ||
| 473 | IOHEADER - WERKS | Plant | ||
| 474 | IOHEADER - ZAEHL | Internal counter | ||
| 475 | IOHEADER - ZKRIZ | Counter for additional criteria | ||
| 476 | IOHEADER - ZSCHL | Overhead key | ||
| 477 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables |