Table/Structure Field list used by SAP ABAP Program RCNCNZVR (Project Info System: Excel control table for time line)
SAP ABAP Program
RCNCNZVR (Project Info System: Excel control table for time line) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | CNZVR - ABARBA | Percent of completion for work | ||
| 2 | CNZVR - AUFERLPLAN | Current order revenue plan | ||
| 3 | CNZVR - AUFERLPLAN_OC | Current Order Revenue Plan in Object Currency | ||
| 4 | CNZVR - AUFERLPLN2 | Order revenue plan (version 2) | ||
| 5 | CNZVR - AUFERLPLN2_OC | Order Revenue Plan (Version 2) in Object Currency | ||
| 6 | CNZVR - AUFKSTPLAN | Current order cost plan | ||
| 7 | CNZVR - AUFKSTPLAN_OC | Current Order Cost Plan in Object Currency | ||
| 8 | CNZVR - AUFKSTPLN2 | Order cost plan (version 2) | ||
| 9 | CNZVR - AUFKSTPLN2_OC | Order Cost Plan (Version 2) in Object Currency | ||
| 10 | CNZVR - AUFTRANF | Residual order plan | ||
| 11 | CNZVR - AUFTRANF_OC | Residual Order Plan in Object Currency | ||
| 12 | CNZVR - BUDGET | Budget of a Measure (App. Request Variant Was Replaced) | ||
| 13 | CNZVR - BUDGET_OC | Appropriation Budget (Appr.Request Variant Replaced) in OC | ||
| 14 | CNZVR - DATUB | Valid-to date | ||
| 15 | CNZVR - DATUV | Valid-From Date | ||
| 16 | CNZVR - DEBFINPLN | Current cash budget, debit side | ||
| 17 | CNZVR - DEBFINPLN_OC | Current Debit Side Cash Budget in Object Currency | ||
| 18 | CNZVR - DZHLNG | Total debit side payments (down payments and payments) | ||
| 19 | CNZVR - DZHLNG_OC | Total Customer Payments (Down Payments and Payments) OC | ||
| 20 | CNZVR - EARBEH | Unit for work | ||
| 21 | CNZVR - EARBEI | Work | ||
| 22 | CNZVR - EV_ACT_CORR1 | Budgeted cost of work performed, adjusted | ||
| 23 | CNZVR - EV_ACT_CORR1_OC | Budgeted cost of work performed, adjusted | ||
| 24 | CNZVR - EV_ACT_ORG1 | Budgeted cost of work performed | ||
| 25 | CNZVR - EV_ACT_ORG1_OC | Budgeted cost of work performed | ||
| 26 | CNZVR - EV_ACT_QUAN_CORR1 | Budgeted cost of work performed, adjusted quantity | ||
| 27 | CNZVR - EV_ACT_QUAN_CORR1_UNIT | BCWP, Adjusted Quantity (Unit) | ||
| 28 | CNZVR - EV_ACT_QUAN_ORG1 | Budgeted cost of work performed, quantity | ||
| 29 | CNZVR - EV_ACT_QUAN_ORG1_UNIT | BCWP, Unit of Measure | ||
| 30 | CNZVR - EV_COST_INDX_CORR | Cost Index Based on EV_ACT_CORR1 | ||
| 31 | CNZVR - EV_COST_INDX_ORG | Cost Index Based on EV_ACT_ORG1 | ||
| 32 | CNZVR - EV_COST_VAR_CORR | Cost Variance Based on EV_ACT_CORR1 | ||
| 33 | CNZVR - EV_COST_VAR_CORR_OC | Schedule Variance Based on EV_ACT_CORR1 | ||
| 34 | CNZVR - EV_COST_VAR_ORG | Cost Variance Based on EV_ACT_ORG1 | ||
| 35 | CNZVR - EV_COST_VAR_ORG_OC | Cost Variance Based on EV_ACT_ORG1 | ||
| 36 | CNZVR - EV_PLAN_ORG1 | Budgeted cost of work scheduled | ||
| 37 | CNZVR - EV_PLAN_ORG1_OC | Budgeted cost of work scheduled | ||
| 38 | CNZVR - EV_PLAN_QUAN_ORG1 | Budgeted cost of work scheduled, quantity | ||
| 39 | CNZVR - EV_PLAN_QUAN_ORG1_UNIT | BCWS, Unit of Measure | ||
| 40 | CNZVR - EV_SCHED_INDX_CORR | Date Index Based on POC_ACT_CORR_AGG1 | ||
| 41 | CNZVR - EV_SCHED_INDX_ORG | Date Index Based on POC_ACT_ORG_AGG1 | ||
| 42 | CNZVR - EV_SCHED_VAR_CORR | Schedule Variance Based on EV_ACT_CORR1 | ||
| 43 | CNZVR - EV_SCHED_VAR_CORR_OC | Cost Variance Based on EV_ACT_CORR1 | ||
| 44 | CNZVR - EV_SCHED_VAR_ORG | Schedule Variance Based on EV_ACT_ORG1 | ||
| 45 | CNZVR - EV_SCHED_VAR_ORG_OC | Schedule Variance Based on EV_ACT_ORG1 | ||
| 46 | CNZVR - FESTPROBL | Fixed price commitment | ||
| 47 | CNZVR - FESTPROBL_OC | Fixed Price Commitment in Object Currency | ||
| 48 | CNZVR - FREIGABE | Release | ||
| 49 | CNZVR - FREIGABE_OC | Release in Object Currency | ||
| 50 | CNZVR - GJAHR | Fiscal Year | ||
| 51 | CNZVR - IARBEH | Unit for work | ||
| 52 | CNZVR - IARBEI | Actual work | ||
| 53 | CNZVR - ISTERLOESE | Actual revenues | ||
| 54 | CNZVR - ISTERLOESE_OC | Actual Revenues in Object Currency | ||
| 55 | CNZVR - ISTKOSTEN | Actual costs | ||
| 56 | CNZVR - ISTKOSTEN_OC | Act. Costs in Object Currency | ||
| 57 | CNZVR - KREDFINPLN | Current financial budget, credit side | ||
| 58 | CNZVR - KREDFINPLN_OC | Current Credit Side Cash Budget in Object Currency | ||
| 59 | CNZVR - KSTOBLGES | Total cost commitment | ||
| 60 | CNZVR - KSTOBLGES_OC | Total Cost Commitment in Object Currency | ||
| 61 | CNZVR - KZHLNG | Total credit side payments (down payments and payments) | ||
| 62 | CNZVR - KZHLNG_OC | Total Vendor Payments (Down Payments and Payments) OC | ||
| 63 | CNZVR - MEINH | Unit of Measure for Display | ||
| 64 | CNZVR - OWAERS | Object currency for network activity | ||
| 65 | CNZVR - PARBEH | Unit for work | ||
| 66 | CNZVR - PARBEI | Forecast work | ||
| 67 | CNZVR - PERIO | Period | ||
| 68 | CNZVR - POC_ACT_CORR_AGG1 | Adjusted aggregated actual POC | ||
| 69 | CNZVR - POC_ACT_CORR_NAGG1 | Adjusted non-aggregated actual percentage of completion | ||
| 70 | CNZVR - POC_ACT_ORG_AGG1 | Aggregated actual POC | ||
| 71 | CNZVR - POC_ACT_ORG_NAGG1 | Non-aggregated actual percentage of completion | ||
| 72 | CNZVR - POC_PLAN_ORG_AGG1 | Aggregate planned percentage of completion | ||
| 73 | CNZVR - POC_PLAN_ORG_NAGG1 | Non-aggregated planned percentage of completion | ||
| 74 | CNZVR - PROERLPLAN | Current project revenue plan | ||
| 75 | CNZVR - PROERLPLAN_OC | Current Project Revenue Plan in Object Currency | ||
| 76 | CNZVR - PROERLPLN2 | Project revenue plan (version 2) | ||
| 77 | CNZVR - PROERLPLN2_OC | Project Revenue Plan (Version 2) in Object Currency | ||
| 78 | CNZVR - PROKSTPLAN | Current project cost plan | ||
| 79 | CNZVR - PROKSTPLAN_OC | Current Project Cost Plan in Object Currency | ||
| 80 | CNZVR - PROKSTPLN2 | Project cost plan (version 2) | ||
| 81 | CNZVR - PROKSTPLN2_OC | Project Cost Plan (Version 2) in Object Currency | ||
| 82 | CNZVR - RARBEH | Unit for work | ||
| 83 | CNZVR - RARBEI | Remaining work | ||
| 84 | CNZVR - VARBEH | Unit for work | ||
| 85 | CNZVR - VARBEI | Tentative work | ||
| 86 | CNZVR - WAERS | Currency Key | ||
| 87 | RCJ_EV - EV_ACT_CORR1 | Budgeted cost of work performed, adjusted | ||
| 88 | RCJ_EV - EV_ACT_CORR1_OC | Budgeted cost of work performed, adjusted | ||
| 89 | RCJ_EV - EV_ACT_ORG1 | Budgeted cost of work performed | ||
| 90 | RCJ_EV - EV_ACT_ORG1_OC | Budgeted cost of work performed | ||
| 91 | RCJ_EV - EV_ACT_QUAN_CORR1 | Budgeted cost of work performed, adjusted quantity | ||
| 92 | RCJ_EV - EV_ACT_QUAN_CORR1_UNIT | BCWP, Adjusted Quantity (Unit) | ||
| 93 | RCJ_EV - EV_ACT_QUAN_ORG1 | Budgeted cost of work performed, quantity | ||
| 94 | RCJ_EV - EV_ACT_QUAN_ORG1_UNIT | BCWP, Unit of Measure | ||
| 95 | RCJ_EV - EV_COST_INDX_CORR | Cost Index Based on EV_ACT_CORR1 | ||
| 96 | RCJ_EV - EV_COST_INDX_ORG | Cost Index Based on EV_ACT_ORG1 | ||
| 97 | RCJ_EV - EV_COST_VAR_CORR | Cost Variance Based on EV_ACT_CORR1 | ||
| 98 | RCJ_EV - EV_COST_VAR_CORR_OC | Schedule Variance Based on EV_ACT_CORR1 | ||
| 99 | RCJ_EV - EV_COST_VAR_ORG | Cost Variance Based on EV_ACT_ORG1 | ||
| 100 | RCJ_EV - EV_COST_VAR_ORG_OC | Cost Variance Based on EV_ACT_ORG1 | ||
| 101 | RCJ_EV - EV_PLAN_ORG1 | Budgeted cost of work scheduled | ||
| 102 | RCJ_EV - EV_PLAN_ORG1_OC | Budgeted cost of work scheduled | ||
| 103 | RCJ_EV - EV_PLAN_QUAN_ORG1 | Budgeted cost of work scheduled, quantity | ||
| 104 | RCJ_EV - EV_PLAN_QUAN_ORG1_UNIT | BCWS, Unit of Measure | ||
| 105 | RCJ_EV - EV_SCHED_INDX_CORR | Date Index Based on POC_ACT_CORR_AGG1 | ||
| 106 | RCJ_EV - EV_SCHED_INDX_ORG | Date Index Based on POC_ACT_ORG_AGG1 | ||
| 107 | RCJ_EV - EV_SCHED_VAR_CORR | Schedule Variance Based on EV_ACT_CORR1 | ||
| 108 | RCJ_EV - EV_SCHED_VAR_CORR_OC | Cost Variance Based on EV_ACT_CORR1 | ||
| 109 | RCJ_EV - EV_SCHED_VAR_ORG | Schedule Variance Based on EV_ACT_ORG1 | ||
| 110 | RCJ_EV - EV_SCHED_VAR_ORG_OC | Schedule Variance Based on EV_ACT_ORG1 | ||
| 111 | RCJ_EV - POC_ACT_CORR_AGG1 | Adjusted aggregated actual POC | ||
| 112 | RCJ_EV - POC_ACT_CORR_NAGG1 | Adjusted non-aggregated actual percentage of completion | ||
| 113 | RCJ_EV - POC_ACT_ORG_AGG1 | Aggregated actual POC | ||
| 114 | RCJ_EV - POC_ACT_ORG_NAGG1 | Non-aggregated actual percentage of completion | ||
| 115 | RCJ_EV - POC_PLAN_ORG_AGG1 | Aggregate planned percentage of completion | ||
| 116 | RCJ_EV - POC_PLAN_ORG_NAGG1 | Non-aggregated planned percentage of completion | ||
| 117 | RCJ_EVDEGREE - POC_ACT_CORR_AGG1 | Adjusted aggregated actual POC | ||
| 118 | RCJ_EVDEGREE - POC_ACT_CORR_NAGG1 | Adjusted non-aggregated actual percentage of completion | ||
| 119 | RCJ_EVDEGREE - POC_ACT_ORG_AGG1 | Aggregated actual POC | ||
| 120 | RCJ_EVDEGREE - POC_ACT_ORG_NAGG1 | Non-aggregated actual percentage of completion | ||
| 121 | RCJ_EVDEGREE - POC_PLAN_ORG_AGG1 | Aggregate planned percentage of completion | ||
| 122 | RCJ_EVDEGREE - POC_PLAN_ORG_NAGG1 | Non-aggregated planned percentage of completion | ||
| 123 | RCJ_EVQUANT - EV_ACT_QUAN_CORR1 | Budgeted cost of work performed, adjusted quantity | ||
| 124 | RCJ_EVQUANT - EV_ACT_QUAN_CORR1_UNIT | BCWP, Adjusted Quantity (Unit) | ||
| 125 | RCJ_EVQUANT - EV_ACT_QUAN_ORG1 | Budgeted cost of work performed, quantity | ||
| 126 | RCJ_EVQUANT - EV_ACT_QUAN_ORG1_UNIT | BCWP, Unit of Measure | ||
| 127 | RCJ_EVQUANT - EV_PLAN_QUAN_ORG1 | Budgeted cost of work scheduled, quantity | ||
| 128 | RCJ_EVQUANT - EV_PLAN_QUAN_ORG1_UNIT | BCWS, Unit of Measure | ||
| 129 | RCJ_EVVALUE - EV_ACT_CORR1 | Budgeted cost of work performed, adjusted | ||
| 130 | RCJ_EVVALUE - EV_ACT_ORG1 | Budgeted cost of work performed | ||
| 131 | RCJ_EVVALUE - EV_PLAN_ORG1 | Budgeted cost of work scheduled | ||
| 132 | RCJ_EVVALUE_OC - EV_ACT_CORR1_OC | Budgeted cost of work performed, adjusted | ||
| 133 | RCJ_EVVALUE_OC - EV_ACT_ORG1_OC | Budgeted cost of work performed | ||
| 134 | RCJ_EVVALUE_OC - EV_PLAN_ORG1_OC | Budgeted cost of work scheduled | ||
| 135 | RCJ_EV_APPEND - EV_ACT_CORR1_OC | Budgeted cost of work performed, adjusted | ||
| 136 | RCJ_EV_APPEND - EV_ACT_ORG1_OC | Budgeted cost of work performed | ||
| 137 | RCJ_EV_APPEND - EV_COST_VAR_CORR_OC | Schedule Variance Based on EV_ACT_CORR1 | ||
| 138 | RCJ_EV_APPEND - EV_COST_VAR_ORG_OC | Cost Variance Based on EV_ACT_ORG1 | ||
| 139 | RCJ_EV_APPEND - EV_PLAN_ORG1_OC | Budgeted cost of work scheduled | ||
| 140 | RCJ_EV_APPEND - EV_SCHED_VAR_CORR_OC | Cost Variance Based on EV_ACT_CORR1 | ||
| 141 | RCJ_EV_APPEND - EV_SCHED_VAR_ORG_OC | Schedule Variance Based on EV_ACT_ORG1 | ||
| 142 | RCJ_EV_OC - EV_ACT_CORR1_OC | Budgeted cost of work performed, adjusted | ||
| 143 | RCJ_EV_OC - EV_ACT_ORG1_OC | Budgeted cost of work performed | ||
| 144 | RCJ_EV_OC - EV_COST_VAR_CORR_OC | Schedule Variance Based on EV_ACT_CORR1 | ||
| 145 | RCJ_EV_OC - EV_COST_VAR_ORG_OC | Cost Variance Based on EV_ACT_ORG1 | ||
| 146 | RCJ_EV_OC - EV_PLAN_ORG1_OC | Budgeted cost of work scheduled | ||
| 147 | RCJ_EV_OC - EV_SCHED_VAR_CORR_OC | Cost Variance Based on EV_ACT_CORR1 | ||
| 148 | RCJ_EV_OC - EV_SCHED_VAR_ORG_OC | Schedule Variance Based on EV_ACT_ORG1 | ||
| 149 | RCJ_RPSCO_LIS - AUFERLPLAN | Current order revenue plan | ||
| 150 | RCJ_RPSCO_LIS - AUFERLPLAN_OC | Current Order Revenue Plan in Object Currency | ||
| 151 | RCJ_RPSCO_LIS - AUFERLPLN2 | Order revenue plan (version 2) | ||
| 152 | RCJ_RPSCO_LIS - AUFERLPLN2_OC | Order Revenue Plan (Version 2) in Object Currency | ||
| 153 | RCJ_RPSCO_LIS - AUFKSTPLAN | Current order cost plan | ||
| 154 | RCJ_RPSCO_LIS - AUFKSTPLAN_OC | Current Order Cost Plan in Object Currency | ||
| 155 | RCJ_RPSCO_LIS - AUFKSTPLN2 | Order cost plan (version 2) | ||
| 156 | RCJ_RPSCO_LIS - AUFKSTPLN2_OC | Order Cost Plan (Version 2) in Object Currency | ||
| 157 | RCJ_RPSCO_LIS - AUFTRANF | Residual order plan | ||
| 158 | RCJ_RPSCO_LIS - AUFTRANF_OC | Residual Order Plan in Object Currency | ||
| 159 | RCJ_RPSCO_LIS - BUDGET | Budget of a Measure (App. Request Variant Was Replaced) | ||
| 160 | RCJ_RPSCO_LIS - BUDGET_OC | Appropriation Budget (Appr.Request Variant Replaced) in OC | ||
| 161 | RCJ_RPSCO_LIS - DEBFINPLN | Current cash budget, debit side | ||
| 162 | RCJ_RPSCO_LIS - DEBFINPLN_OC | Current Debit Side Cash Budget in Object Currency | ||
| 163 | RCJ_RPSCO_LIS - DZHLNG | Total debit side payments (down payments and payments) | ||
| 164 | RCJ_RPSCO_LIS - DZHLNG_OC | Total Customer Payments (Down Payments and Payments) OC | ||
| 165 | RCJ_RPSCO_LIS - FESTPROBL | Fixed price commitment | ||
| 166 | RCJ_RPSCO_LIS - FESTPROBL_OC | Fixed Price Commitment in Object Currency | ||
| 167 | RCJ_RPSCO_LIS - FREIGABE | Release | ||
| 168 | RCJ_RPSCO_LIS - FREIGABE_OC | Release in Object Currency | ||
| 169 | RCJ_RPSCO_LIS - ISTERLOESE | Actual revenues | ||
| 170 | RCJ_RPSCO_LIS - ISTERLOESE_OC | Actual Revenues in Object Currency | ||
| 171 | RCJ_RPSCO_LIS - ISTKOSTEN | Actual costs | ||
| 172 | RCJ_RPSCO_LIS - ISTKOSTEN_OC | Act. Costs in Object Currency | ||
| 173 | RCJ_RPSCO_LIS - KREDFINPLN | Current financial budget, credit side | ||
| 174 | RCJ_RPSCO_LIS - KREDFINPLN_OC | Current Credit Side Cash Budget in Object Currency | ||
| 175 | RCJ_RPSCO_LIS - KSTOBLGES | Total cost commitment | ||
| 176 | RCJ_RPSCO_LIS - KSTOBLGES_OC | Total Cost Commitment in Object Currency | ||
| 177 | RCJ_RPSCO_LIS - KZHLNG | Total credit side payments (down payments and payments) | ||
| 178 | RCJ_RPSCO_LIS - KZHLNG_OC | Total Vendor Payments (Down Payments and Payments) OC | ||
| 179 | RCJ_RPSCO_LIS - PROERLPLAN | Current project revenue plan | ||
| 180 | RCJ_RPSCO_LIS - PROERLPLAN_OC | Current Project Revenue Plan in Object Currency | ||
| 181 | RCJ_RPSCO_LIS - PROERLPLN2 | Project revenue plan (version 2) | ||
| 182 | RCJ_RPSCO_LIS - PROERLPLN2_OC | Project Revenue Plan (Version 2) in Object Currency | ||
| 183 | RCJ_RPSCO_LIS - PROKSTPLAN | Current project cost plan | ||
| 184 | RCJ_RPSCO_LIS - PROKSTPLAN_OC | Current Project Cost Plan in Object Currency | ||
| 185 | RCJ_RPSCO_LIS - PROKSTPLN2 | Project cost plan (version 2) | ||
| 186 | RCJ_RPSCO_LIS - PROKSTPLN2_OC | Project Cost Plan (Version 2) in Object Currency | ||
| 187 | RCJ_RPSCO_LIS_APPEND - AUFERLPLAN_OC | Current Order Revenue Plan in Object Currency | ||
| 188 | RCJ_RPSCO_LIS_APPEND - AUFERLPLN2_OC | Order Revenue Plan (Version 2) in Object Currency | ||
| 189 | RCJ_RPSCO_LIS_APPEND - AUFKSTPLAN_OC | Current Order Cost Plan in Object Currency | ||
| 190 | RCJ_RPSCO_LIS_APPEND - AUFKSTPLN2_OC | Order Cost Plan (Version 2) in Object Currency | ||
| 191 | RCJ_RPSCO_LIS_APPEND - AUFTRANF_OC | Residual Order Plan in Object Currency | ||
| 192 | RCJ_RPSCO_LIS_APPEND - BUDGET_OC | Appropriation Budget (Appr.Request Variant Replaced) in OC | ||
| 193 | RCJ_RPSCO_LIS_APPEND - DEBFINPLN_OC | Current Debit Side Cash Budget in Object Currency | ||
| 194 | RCJ_RPSCO_LIS_APPEND - DZHLNG_OC | Total Customer Payments (Down Payments and Payments) OC | ||
| 195 | RCJ_RPSCO_LIS_APPEND - FESTPROBL_OC | Fixed Price Commitment in Object Currency | ||
| 196 | RCJ_RPSCO_LIS_APPEND - FREIGABE_OC | Release in Object Currency | ||
| 197 | RCJ_RPSCO_LIS_APPEND - ISTERLOESE_OC | Actual Revenues in Object Currency | ||
| 198 | RCJ_RPSCO_LIS_APPEND - ISTKOSTEN_OC | Act. Costs in Object Currency | ||
| 199 | RCJ_RPSCO_LIS_APPEND - KREDFINPLN_OC | Current Credit Side Cash Budget in Object Currency | ||
| 200 | RCJ_RPSCO_LIS_APPEND - KSTOBLGES_OC | Total Cost Commitment in Object Currency | ||
| 201 | RCJ_RPSCO_LIS_APPEND - KZHLNG_OC | Total Vendor Payments (Down Payments and Payments) OC | ||
| 202 | RCJ_RPSCO_LIS_APPEND - PROERLPLAN_OC | Current Project Revenue Plan in Object Currency | ||
| 203 | RCJ_RPSCO_LIS_APPEND - PROERLPLN2_OC | Project Revenue Plan (Version 2) in Object Currency | ||
| 204 | RCJ_RPSCO_LIS_APPEND - PROKSTPLAN_OC | Current Project Cost Plan in Object Currency | ||
| 205 | RCJ_RPSCO_LIS_APPEND - PROKSTPLN2_OC | Project Cost Plan (Version 2) in Object Currency | ||
| 206 | RCJ_RPSCO_LIS_OC - AUFERLPLAN_OC | Current Order Revenue Plan in Object Currency | ||
| 207 | RCJ_RPSCO_LIS_OC - AUFERLPLN2_OC | Order Revenue Plan (Version 2) in Object Currency | ||
| 208 | RCJ_RPSCO_LIS_OC - AUFKSTPLAN_OC | Current Order Cost Plan in Object Currency | ||
| 209 | RCJ_RPSCO_LIS_OC - AUFKSTPLN2_OC | Order Cost Plan (Version 2) in Object Currency | ||
| 210 | RCJ_RPSCO_LIS_OC - AUFTRANF_OC | Residual Order Plan in Object Currency | ||
| 211 | RCJ_RPSCO_LIS_OC - BUDGET_OC | Appropriation Budget (Appr.Request Variant Replaced) in OC | ||
| 212 | RCJ_RPSCO_LIS_OC - DEBFINPLN_OC | Current Debit Side Cash Budget in Object Currency | ||
| 213 | RCJ_RPSCO_LIS_OC - DZHLNG_OC | Total Customer Payments (Down Payments and Payments) OC | ||
| 214 | RCJ_RPSCO_LIS_OC - FESTPROBL_OC | Fixed Price Commitment in Object Currency | ||
| 215 | RCJ_RPSCO_LIS_OC - FREIGABE_OC | Release in Object Currency | ||
| 216 | RCJ_RPSCO_LIS_OC - ISTERLOESE_OC | Actual Revenues in Object Currency | ||
| 217 | RCJ_RPSCO_LIS_OC - ISTKOSTEN_OC | Act. Costs in Object Currency | ||
| 218 | RCJ_RPSCO_LIS_OC - KREDFINPLN_OC | Current Credit Side Cash Budget in Object Currency | ||
| 219 | RCJ_RPSCO_LIS_OC - KSTOBLGES_OC | Total Cost Commitment in Object Currency | ||
| 220 | RCJ_RPSCO_LIS_OC - KZHLNG_OC | Total Vendor Payments (Down Payments and Payments) OC | ||
| 221 | RCJ_RPSCO_LIS_OC - PROERLPLAN_OC | Current Project Revenue Plan in Object Currency | ||
| 222 | RCJ_RPSCO_LIS_OC - PROERLPLN2_OC | Project Revenue Plan (Version 2) in Object Currency | ||
| 223 | RCJ_RPSCO_LIS_OC - PROKSTPLAN_OC | Current Project Cost Plan in Object Currency | ||
| 224 | RCJ_RPSCO_LIS_OC - PROKSTPLN2_OC | Project Cost Plan (Version 2) in Object Currency | ||
| 225 | RPSCO_LISC - AUFERLPLAN | Current order revenue plan | ||
| 226 | RPSCO_LISC - AUFERLPLAN_OC | Current Order Revenue Plan in Object Currency | ||
| 227 | RPSCO_LISC - AUFERLPLN2 | Order revenue plan (version 2) | ||
| 228 | RPSCO_LISC - AUFERLPLN2_OC | Order Revenue Plan (Version 2) in Object Currency | ||
| 229 | RPSCO_LISC - AUFKSTPLAN | Current order cost plan | ||
| 230 | RPSCO_LISC - AUFKSTPLAN_OC | Current Order Cost Plan in Object Currency | ||
| 231 | RPSCO_LISC - AUFKSTPLN2 | Order cost plan (version 2) | ||
| 232 | RPSCO_LISC - AUFKSTPLN2_OC | Order Cost Plan (Version 2) in Object Currency | ||
| 233 | RPSCO_LISC - AUFTRANF | Residual order plan | ||
| 234 | RPSCO_LISC - AUFTRANF_OC | Residual Order Plan in Object Currency | ||
| 235 | RPSCO_LISC - BUDGET | Budget of a Measure (App. Request Variant Was Replaced) | ||
| 236 | RPSCO_LISC - BUDGET_OC | Appropriation Budget (Appr.Request Variant Replaced) in OC | ||
| 237 | RPSCO_LISC - DEBFINPLN | Current cash budget, debit side | ||
| 238 | RPSCO_LISC - DEBFINPLN_OC | Current Debit Side Cash Budget in Object Currency | ||
| 239 | RPSCO_LISC - DZHLNG | Total debit side payments (down payments and payments) | ||
| 240 | RPSCO_LISC - DZHLNG_OC | Total Customer Payments (Down Payments and Payments) OC | ||
| 241 | RPSCO_LISC - EV_ACT_CORR1 | Budgeted cost of work performed, adjusted | ||
| 242 | RPSCO_LISC - EV_ACT_CORR1_OC | Budgeted cost of work performed, adjusted | ||
| 243 | RPSCO_LISC - EV_ACT_ORG1 | Budgeted cost of work performed | ||
| 244 | RPSCO_LISC - EV_ACT_ORG1_OC | Budgeted cost of work performed | ||
| 245 | RPSCO_LISC - EV_ACT_QUAN_CORR1 | Budgeted cost of work performed, adjusted quantity | ||
| 246 | RPSCO_LISC - EV_ACT_QUAN_CORR1_UNIT | BCWP, Adjusted Quantity (Unit) | ||
| 247 | RPSCO_LISC - EV_ACT_QUAN_ORG1 | Budgeted cost of work performed, quantity | ||
| 248 | RPSCO_LISC - EV_ACT_QUAN_ORG1_UNIT | BCWP, Unit of Measure | ||
| 249 | RPSCO_LISC - EV_COST_INDX_CORR | Cost Index Based on EV_ACT_CORR1 | ||
| 250 | RPSCO_LISC - EV_COST_INDX_ORG | Cost Index Based on EV_ACT_ORG1 | ||
| 251 | RPSCO_LISC - EV_COST_VAR_CORR | Cost Variance Based on EV_ACT_CORR1 | ||
| 252 | RPSCO_LISC - EV_COST_VAR_CORR_OC | Schedule Variance Based on EV_ACT_CORR1 | ||
| 253 | RPSCO_LISC - EV_COST_VAR_ORG | Cost Variance Based on EV_ACT_ORG1 | ||
| 254 | RPSCO_LISC - EV_COST_VAR_ORG_OC | Cost Variance Based on EV_ACT_ORG1 | ||
| 255 | RPSCO_LISC - EV_PLAN_ORG1 | Budgeted cost of work scheduled | ||
| 256 | RPSCO_LISC - EV_PLAN_ORG1_OC | Budgeted cost of work scheduled | ||
| 257 | RPSCO_LISC - EV_PLAN_QUAN_ORG1 | Budgeted cost of work scheduled, quantity | ||
| 258 | RPSCO_LISC - EV_PLAN_QUAN_ORG1_UNIT | BCWS, Unit of Measure | ||
| 259 | RPSCO_LISC - EV_SCHED_INDX_CORR | Date Index Based on POC_ACT_CORR_AGG1 | ||
| 260 | RPSCO_LISC - EV_SCHED_INDX_ORG | Date Index Based on POC_ACT_ORG_AGG1 | ||
| 261 | RPSCO_LISC - EV_SCHED_VAR_CORR | Schedule Variance Based on EV_ACT_CORR1 | ||
| 262 | RPSCO_LISC - EV_SCHED_VAR_CORR_OC | Cost Variance Based on EV_ACT_CORR1 | ||
| 263 | RPSCO_LISC - EV_SCHED_VAR_ORG | Schedule Variance Based on EV_ACT_ORG1 | ||
| 264 | RPSCO_LISC - EV_SCHED_VAR_ORG_OC | Schedule Variance Based on EV_ACT_ORG1 | ||
| 265 | RPSCO_LISC - FESTPROBL | Fixed price commitment | ||
| 266 | RPSCO_LISC - FESTPROBL_OC | Fixed Price Commitment in Object Currency | ||
| 267 | RPSCO_LISC - FREIGABE | Release | ||
| 268 | RPSCO_LISC - FREIGABE_OC | Release in Object Currency | ||
| 269 | RPSCO_LISC - ISTERLOESE | Actual revenues | ||
| 270 | RPSCO_LISC - ISTERLOESE_OC | Actual Revenues in Object Currency | ||
| 271 | RPSCO_LISC - ISTKOSTEN | Actual costs | ||
| 272 | RPSCO_LISC - ISTKOSTEN_OC | Act. Costs in Object Currency | ||
| 273 | RPSCO_LISC - KREDFINPLN | Current financial budget, credit side | ||
| 274 | RPSCO_LISC - KREDFINPLN_OC | Current Credit Side Cash Budget in Object Currency | ||
| 275 | RPSCO_LISC - KSTOBLGES | Total cost commitment | ||
| 276 | RPSCO_LISC - KSTOBLGES_OC | Total Cost Commitment in Object Currency | ||
| 277 | RPSCO_LISC - KZHLNG | Total credit side payments (down payments and payments) | ||
| 278 | RPSCO_LISC - KZHLNG_OC | Total Vendor Payments (Down Payments and Payments) OC | ||
| 279 | RPSCO_LISC - POC_ACT_CORR_AGG1 | Adjusted aggregated actual POC | ||
| 280 | RPSCO_LISC - POC_ACT_CORR_NAGG1 | Adjusted non-aggregated actual percentage of completion | ||
| 281 | RPSCO_LISC - POC_ACT_ORG_AGG1 | Aggregated actual POC | ||
| 282 | RPSCO_LISC - POC_ACT_ORG_NAGG1 | Non-aggregated actual percentage of completion | ||
| 283 | RPSCO_LISC - POC_PLAN_ORG_AGG1 | Aggregate planned percentage of completion | ||
| 284 | RPSCO_LISC - POC_PLAN_ORG_NAGG1 | Non-aggregated planned percentage of completion | ||
| 285 | RPSCO_LISC - PROERLPLAN | Current project revenue plan | ||
| 286 | RPSCO_LISC - PROERLPLAN_OC | Current Project Revenue Plan in Object Currency | ||
| 287 | RPSCO_LISC - PROERLPLN2 | Project revenue plan (version 2) | ||
| 288 | RPSCO_LISC - PROERLPLN2_OC | Project Revenue Plan (Version 2) in Object Currency | ||
| 289 | RPSCO_LISC - PROKSTPLAN | Current project cost plan | ||
| 290 | RPSCO_LISC - PROKSTPLAN_OC | Current Project Cost Plan in Object Currency | ||
| 291 | RPSCO_LISC - PROKSTPLN2 | Project cost plan (version 2) | ||
| 292 | RPSCO_LISC - PROKSTPLN2_OC | Project Cost Plan (Version 2) in Object Currency |