Table/Structure Field list used by SAP ABAP Program RCNCNZVR (Project Info System: Excel control table for time line)
SAP ABAP Program
RCNCNZVR (Project Info System: Excel control table for time line) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
CNZVR - ABARBA | Percent of completion for work | |
2 | ![]() |
CNZVR - AUFERLPLAN | Current order revenue plan | |
3 | ![]() |
CNZVR - AUFERLPLAN_OC | Current Order Revenue Plan in Object Currency | |
4 | ![]() |
CNZVR - AUFERLPLN2 | Order revenue plan (version 2) | |
5 | ![]() |
CNZVR - AUFERLPLN2_OC | Order Revenue Plan (Version 2) in Object Currency | |
6 | ![]() |
CNZVR - AUFKSTPLAN | Current order cost plan | |
7 | ![]() |
CNZVR - AUFKSTPLAN_OC | Current Order Cost Plan in Object Currency | |
8 | ![]() |
CNZVR - AUFKSTPLN2 | Order cost plan (version 2) | |
9 | ![]() |
CNZVR - AUFKSTPLN2_OC | Order Cost Plan (Version 2) in Object Currency | |
10 | ![]() |
CNZVR - AUFTRANF | Residual order plan | |
11 | ![]() |
CNZVR - AUFTRANF_OC | Residual Order Plan in Object Currency | |
12 | ![]() |
CNZVR - BUDGET | Budget of a Measure (App. Request Variant Was Replaced) | |
13 | ![]() |
CNZVR - BUDGET_OC | Appropriation Budget (Appr.Request Variant Replaced) in OC | |
14 | ![]() |
CNZVR - DATUB | Valid-to date | |
15 | ![]() |
CNZVR - DATUV | Valid-From Date | |
16 | ![]() |
CNZVR - DEBFINPLN | Current cash budget, debit side | |
17 | ![]() |
CNZVR - DEBFINPLN_OC | Current Debit Side Cash Budget in Object Currency | |
18 | ![]() |
CNZVR - DZHLNG | Total debit side payments (down payments and payments) | |
19 | ![]() |
CNZVR - DZHLNG_OC | Total Customer Payments (Down Payments and Payments) OC | |
20 | ![]() |
CNZVR - EARBEH | Unit for work | |
21 | ![]() |
CNZVR - EARBEI | Work | |
22 | ![]() |
CNZVR - EV_ACT_CORR1 | Budgeted cost of work performed, adjusted | |
23 | ![]() |
CNZVR - EV_ACT_CORR1_OC | Budgeted cost of work performed, adjusted | |
24 | ![]() |
CNZVR - EV_ACT_ORG1 | Budgeted cost of work performed | |
25 | ![]() |
CNZVR - EV_ACT_ORG1_OC | Budgeted cost of work performed | |
26 | ![]() |
CNZVR - EV_ACT_QUAN_CORR1 | Budgeted cost of work performed, adjusted quantity | |
27 | ![]() |
CNZVR - EV_ACT_QUAN_CORR1_UNIT | BCWP, Adjusted Quantity (Unit) | |
28 | ![]() |
CNZVR - EV_ACT_QUAN_ORG1 | Budgeted cost of work performed, quantity | |
29 | ![]() |
CNZVR - EV_ACT_QUAN_ORG1_UNIT | BCWP, Unit of Measure | |
30 | ![]() |
CNZVR - EV_COST_INDX_CORR | Cost Index Based on EV_ACT_CORR1 | |
31 | ![]() |
CNZVR - EV_COST_INDX_ORG | Cost Index Based on EV_ACT_ORG1 | |
32 | ![]() |
CNZVR - EV_COST_VAR_CORR | Cost Variance Based on EV_ACT_CORR1 | |
33 | ![]() |
CNZVR - EV_COST_VAR_CORR_OC | Schedule Variance Based on EV_ACT_CORR1 | |
34 | ![]() |
CNZVR - EV_COST_VAR_ORG | Cost Variance Based on EV_ACT_ORG1 | |
35 | ![]() |
CNZVR - EV_COST_VAR_ORG_OC | Cost Variance Based on EV_ACT_ORG1 | |
36 | ![]() |
CNZVR - EV_PLAN_ORG1 | Budgeted cost of work scheduled | |
37 | ![]() |
CNZVR - EV_PLAN_ORG1_OC | Budgeted cost of work scheduled | |
38 | ![]() |
CNZVR - EV_PLAN_QUAN_ORG1 | Budgeted cost of work scheduled, quantity | |
39 | ![]() |
CNZVR - EV_PLAN_QUAN_ORG1_UNIT | BCWS, Unit of Measure | |
40 | ![]() |
CNZVR - EV_SCHED_INDX_CORR | Date Index Based on POC_ACT_CORR_AGG1 | |
41 | ![]() |
CNZVR - EV_SCHED_INDX_ORG | Date Index Based on POC_ACT_ORG_AGG1 | |
42 | ![]() |
CNZVR - EV_SCHED_VAR_CORR | Schedule Variance Based on EV_ACT_CORR1 | |
43 | ![]() |
CNZVR - EV_SCHED_VAR_CORR_OC | Cost Variance Based on EV_ACT_CORR1 | |
44 | ![]() |
CNZVR - EV_SCHED_VAR_ORG | Schedule Variance Based on EV_ACT_ORG1 | |
45 | ![]() |
CNZVR - EV_SCHED_VAR_ORG_OC | Schedule Variance Based on EV_ACT_ORG1 | |
46 | ![]() |
CNZVR - FESTPROBL | Fixed price commitment | |
47 | ![]() |
CNZVR - FESTPROBL_OC | Fixed Price Commitment in Object Currency | |
48 | ![]() |
CNZVR - FREIGABE | Release | |
49 | ![]() |
CNZVR - FREIGABE_OC | Release in Object Currency | |
50 | ![]() |
CNZVR - GJAHR | Fiscal Year | |
51 | ![]() |
CNZVR - IARBEH | Unit for work | |
52 | ![]() |
CNZVR - IARBEI | Actual work | |
53 | ![]() |
CNZVR - ISTERLOESE | Actual revenues | |
54 | ![]() |
CNZVR - ISTERLOESE_OC | Actual Revenues in Object Currency | |
55 | ![]() |
CNZVR - ISTKOSTEN | Actual costs | |
56 | ![]() |
CNZVR - ISTKOSTEN_OC | Act. Costs in Object Currency | |
57 | ![]() |
CNZVR - KREDFINPLN | Current financial budget, credit side | |
58 | ![]() |
CNZVR - KREDFINPLN_OC | Current Credit Side Cash Budget in Object Currency | |
59 | ![]() |
CNZVR - KSTOBLGES | Total cost commitment | |
60 | ![]() |
CNZVR - KSTOBLGES_OC | Total Cost Commitment in Object Currency | |
61 | ![]() |
CNZVR - KZHLNG | Total credit side payments (down payments and payments) | |
62 | ![]() |
CNZVR - KZHLNG_OC | Total Vendor Payments (Down Payments and Payments) OC | |
63 | ![]() |
CNZVR - MEINH | Unit of Measure for Display | |
64 | ![]() |
CNZVR - OWAERS | Object currency for network activity | |
65 | ![]() |
CNZVR - PARBEH | Unit for work | |
66 | ![]() |
CNZVR - PARBEI | Forecast work | |
67 | ![]() |
CNZVR - PERIO | Period | |
68 | ![]() |
CNZVR - POC_ACT_CORR_AGG1 | Adjusted aggregated actual POC | |
69 | ![]() |
CNZVR - POC_ACT_CORR_NAGG1 | Adjusted non-aggregated actual percentage of completion | |
70 | ![]() |
CNZVR - POC_ACT_ORG_AGG1 | Aggregated actual POC | |
71 | ![]() |
CNZVR - POC_ACT_ORG_NAGG1 | Non-aggregated actual percentage of completion | |
72 | ![]() |
CNZVR - POC_PLAN_ORG_AGG1 | Aggregate planned percentage of completion | |
73 | ![]() |
CNZVR - POC_PLAN_ORG_NAGG1 | Non-aggregated planned percentage of completion | |
74 | ![]() |
CNZVR - PROERLPLAN | Current project revenue plan | |
75 | ![]() |
CNZVR - PROERLPLAN_OC | Current Project Revenue Plan in Object Currency | |
76 | ![]() |
CNZVR - PROERLPLN2 | Project revenue plan (version 2) | |
77 | ![]() |
CNZVR - PROERLPLN2_OC | Project Revenue Plan (Version 2) in Object Currency | |
78 | ![]() |
CNZVR - PROKSTPLAN | Current project cost plan | |
79 | ![]() |
CNZVR - PROKSTPLAN_OC | Current Project Cost Plan in Object Currency | |
80 | ![]() |
CNZVR - PROKSTPLN2 | Project cost plan (version 2) | |
81 | ![]() |
CNZVR - PROKSTPLN2_OC | Project Cost Plan (Version 2) in Object Currency | |
82 | ![]() |
CNZVR - RARBEH | Unit for work | |
83 | ![]() |
CNZVR - RARBEI | Remaining work | |
84 | ![]() |
CNZVR - VARBEH | Unit for work | |
85 | ![]() |
CNZVR - VARBEI | Tentative work | |
86 | ![]() |
CNZVR - WAERS | Currency Key | |
87 | ![]() |
RCJ_EV - EV_ACT_CORR1 | Budgeted cost of work performed, adjusted | |
88 | ![]() |
RCJ_EV - EV_ACT_CORR1_OC | Budgeted cost of work performed, adjusted | |
89 | ![]() |
RCJ_EV - EV_ACT_ORG1 | Budgeted cost of work performed | |
90 | ![]() |
RCJ_EV - EV_ACT_ORG1_OC | Budgeted cost of work performed | |
91 | ![]() |
RCJ_EV - EV_ACT_QUAN_CORR1 | Budgeted cost of work performed, adjusted quantity | |
92 | ![]() |
RCJ_EV - EV_ACT_QUAN_CORR1_UNIT | BCWP, Adjusted Quantity (Unit) | |
93 | ![]() |
RCJ_EV - EV_ACT_QUAN_ORG1 | Budgeted cost of work performed, quantity | |
94 | ![]() |
RCJ_EV - EV_ACT_QUAN_ORG1_UNIT | BCWP, Unit of Measure | |
95 | ![]() |
RCJ_EV - EV_COST_INDX_CORR | Cost Index Based on EV_ACT_CORR1 | |
96 | ![]() |
RCJ_EV - EV_COST_INDX_ORG | Cost Index Based on EV_ACT_ORG1 | |
97 | ![]() |
RCJ_EV - EV_COST_VAR_CORR | Cost Variance Based on EV_ACT_CORR1 | |
98 | ![]() |
RCJ_EV - EV_COST_VAR_CORR_OC | Schedule Variance Based on EV_ACT_CORR1 | |
99 | ![]() |
RCJ_EV - EV_COST_VAR_ORG | Cost Variance Based on EV_ACT_ORG1 | |
100 | ![]() |
RCJ_EV - EV_COST_VAR_ORG_OC | Cost Variance Based on EV_ACT_ORG1 | |
101 | ![]() |
RCJ_EV - EV_PLAN_ORG1 | Budgeted cost of work scheduled | |
102 | ![]() |
RCJ_EV - EV_PLAN_ORG1_OC | Budgeted cost of work scheduled | |
103 | ![]() |
RCJ_EV - EV_PLAN_QUAN_ORG1 | Budgeted cost of work scheduled, quantity | |
104 | ![]() |
RCJ_EV - EV_PLAN_QUAN_ORG1_UNIT | BCWS, Unit of Measure | |
105 | ![]() |
RCJ_EV - EV_SCHED_INDX_CORR | Date Index Based on POC_ACT_CORR_AGG1 | |
106 | ![]() |
RCJ_EV - EV_SCHED_INDX_ORG | Date Index Based on POC_ACT_ORG_AGG1 | |
107 | ![]() |
RCJ_EV - EV_SCHED_VAR_CORR | Schedule Variance Based on EV_ACT_CORR1 | |
108 | ![]() |
RCJ_EV - EV_SCHED_VAR_CORR_OC | Cost Variance Based on EV_ACT_CORR1 | |
109 | ![]() |
RCJ_EV - EV_SCHED_VAR_ORG | Schedule Variance Based on EV_ACT_ORG1 | |
110 | ![]() |
RCJ_EV - EV_SCHED_VAR_ORG_OC | Schedule Variance Based on EV_ACT_ORG1 | |
111 | ![]() |
RCJ_EV - POC_ACT_CORR_AGG1 | Adjusted aggregated actual POC | |
112 | ![]() |
RCJ_EV - POC_ACT_CORR_NAGG1 | Adjusted non-aggregated actual percentage of completion | |
113 | ![]() |
RCJ_EV - POC_ACT_ORG_AGG1 | Aggregated actual POC | |
114 | ![]() |
RCJ_EV - POC_ACT_ORG_NAGG1 | Non-aggregated actual percentage of completion | |
115 | ![]() |
RCJ_EV - POC_PLAN_ORG_AGG1 | Aggregate planned percentage of completion | |
116 | ![]() |
RCJ_EV - POC_PLAN_ORG_NAGG1 | Non-aggregated planned percentage of completion | |
117 | ![]() |
RCJ_EVDEGREE - POC_ACT_CORR_AGG1 | Adjusted aggregated actual POC | |
118 | ![]() |
RCJ_EVDEGREE - POC_ACT_CORR_NAGG1 | Adjusted non-aggregated actual percentage of completion | |
119 | ![]() |
RCJ_EVDEGREE - POC_ACT_ORG_AGG1 | Aggregated actual POC | |
120 | ![]() |
RCJ_EVDEGREE - POC_ACT_ORG_NAGG1 | Non-aggregated actual percentage of completion | |
121 | ![]() |
RCJ_EVDEGREE - POC_PLAN_ORG_AGG1 | Aggregate planned percentage of completion | |
122 | ![]() |
RCJ_EVDEGREE - POC_PLAN_ORG_NAGG1 | Non-aggregated planned percentage of completion | |
123 | ![]() |
RCJ_EVQUANT - EV_ACT_QUAN_CORR1 | Budgeted cost of work performed, adjusted quantity | |
124 | ![]() |
RCJ_EVQUANT - EV_ACT_QUAN_CORR1_UNIT | BCWP, Adjusted Quantity (Unit) | |
125 | ![]() |
RCJ_EVQUANT - EV_ACT_QUAN_ORG1 | Budgeted cost of work performed, quantity | |
126 | ![]() |
RCJ_EVQUANT - EV_ACT_QUAN_ORG1_UNIT | BCWP, Unit of Measure | |
127 | ![]() |
RCJ_EVQUANT - EV_PLAN_QUAN_ORG1 | Budgeted cost of work scheduled, quantity | |
128 | ![]() |
RCJ_EVQUANT - EV_PLAN_QUAN_ORG1_UNIT | BCWS, Unit of Measure | |
129 | ![]() |
RCJ_EVVALUE - EV_ACT_CORR1 | Budgeted cost of work performed, adjusted | |
130 | ![]() |
RCJ_EVVALUE - EV_ACT_ORG1 | Budgeted cost of work performed | |
131 | ![]() |
RCJ_EVVALUE - EV_PLAN_ORG1 | Budgeted cost of work scheduled | |
132 | ![]() |
RCJ_EVVALUE_OC - EV_ACT_CORR1_OC | Budgeted cost of work performed, adjusted | |
133 | ![]() |
RCJ_EVVALUE_OC - EV_ACT_ORG1_OC | Budgeted cost of work performed | |
134 | ![]() |
RCJ_EVVALUE_OC - EV_PLAN_ORG1_OC | Budgeted cost of work scheduled | |
135 | ![]() |
RCJ_EV_APPEND - EV_ACT_CORR1_OC | Budgeted cost of work performed, adjusted | |
136 | ![]() |
RCJ_EV_APPEND - EV_ACT_ORG1_OC | Budgeted cost of work performed | |
137 | ![]() |
RCJ_EV_APPEND - EV_COST_VAR_CORR_OC | Schedule Variance Based on EV_ACT_CORR1 | |
138 | ![]() |
RCJ_EV_APPEND - EV_COST_VAR_ORG_OC | Cost Variance Based on EV_ACT_ORG1 | |
139 | ![]() |
RCJ_EV_APPEND - EV_PLAN_ORG1_OC | Budgeted cost of work scheduled | |
140 | ![]() |
RCJ_EV_APPEND - EV_SCHED_VAR_CORR_OC | Cost Variance Based on EV_ACT_CORR1 | |
141 | ![]() |
RCJ_EV_APPEND - EV_SCHED_VAR_ORG_OC | Schedule Variance Based on EV_ACT_ORG1 | |
142 | ![]() |
RCJ_EV_OC - EV_ACT_CORR1_OC | Budgeted cost of work performed, adjusted | |
143 | ![]() |
RCJ_EV_OC - EV_ACT_ORG1_OC | Budgeted cost of work performed | |
144 | ![]() |
RCJ_EV_OC - EV_COST_VAR_CORR_OC | Schedule Variance Based on EV_ACT_CORR1 | |
145 | ![]() |
RCJ_EV_OC - EV_COST_VAR_ORG_OC | Cost Variance Based on EV_ACT_ORG1 | |
146 | ![]() |
RCJ_EV_OC - EV_PLAN_ORG1_OC | Budgeted cost of work scheduled | |
147 | ![]() |
RCJ_EV_OC - EV_SCHED_VAR_CORR_OC | Cost Variance Based on EV_ACT_CORR1 | |
148 | ![]() |
RCJ_EV_OC - EV_SCHED_VAR_ORG_OC | Schedule Variance Based on EV_ACT_ORG1 | |
149 | ![]() |
RCJ_RPSCO_LIS - AUFERLPLAN | Current order revenue plan | |
150 | ![]() |
RCJ_RPSCO_LIS - AUFERLPLAN_OC | Current Order Revenue Plan in Object Currency | |
151 | ![]() |
RCJ_RPSCO_LIS - AUFERLPLN2 | Order revenue plan (version 2) | |
152 | ![]() |
RCJ_RPSCO_LIS - AUFERLPLN2_OC | Order Revenue Plan (Version 2) in Object Currency | |
153 | ![]() |
RCJ_RPSCO_LIS - AUFKSTPLAN | Current order cost plan | |
154 | ![]() |
RCJ_RPSCO_LIS - AUFKSTPLAN_OC | Current Order Cost Plan in Object Currency | |
155 | ![]() |
RCJ_RPSCO_LIS - AUFKSTPLN2 | Order cost plan (version 2) | |
156 | ![]() |
RCJ_RPSCO_LIS - AUFKSTPLN2_OC | Order Cost Plan (Version 2) in Object Currency | |
157 | ![]() |
RCJ_RPSCO_LIS - AUFTRANF | Residual order plan | |
158 | ![]() |
RCJ_RPSCO_LIS - AUFTRANF_OC | Residual Order Plan in Object Currency | |
159 | ![]() |
RCJ_RPSCO_LIS - BUDGET | Budget of a Measure (App. Request Variant Was Replaced) | |
160 | ![]() |
RCJ_RPSCO_LIS - BUDGET_OC | Appropriation Budget (Appr.Request Variant Replaced) in OC | |
161 | ![]() |
RCJ_RPSCO_LIS - DEBFINPLN | Current cash budget, debit side | |
162 | ![]() |
RCJ_RPSCO_LIS - DEBFINPLN_OC | Current Debit Side Cash Budget in Object Currency | |
163 | ![]() |
RCJ_RPSCO_LIS - DZHLNG | Total debit side payments (down payments and payments) | |
164 | ![]() |
RCJ_RPSCO_LIS - DZHLNG_OC | Total Customer Payments (Down Payments and Payments) OC | |
165 | ![]() |
RCJ_RPSCO_LIS - FESTPROBL | Fixed price commitment | |
166 | ![]() |
RCJ_RPSCO_LIS - FESTPROBL_OC | Fixed Price Commitment in Object Currency | |
167 | ![]() |
RCJ_RPSCO_LIS - FREIGABE | Release | |
168 | ![]() |
RCJ_RPSCO_LIS - FREIGABE_OC | Release in Object Currency | |
169 | ![]() |
RCJ_RPSCO_LIS - ISTERLOESE | Actual revenues | |
170 | ![]() |
RCJ_RPSCO_LIS - ISTERLOESE_OC | Actual Revenues in Object Currency | |
171 | ![]() |
RCJ_RPSCO_LIS - ISTKOSTEN | Actual costs | |
172 | ![]() |
RCJ_RPSCO_LIS - ISTKOSTEN_OC | Act. Costs in Object Currency | |
173 | ![]() |
RCJ_RPSCO_LIS - KREDFINPLN | Current financial budget, credit side | |
174 | ![]() |
RCJ_RPSCO_LIS - KREDFINPLN_OC | Current Credit Side Cash Budget in Object Currency | |
175 | ![]() |
RCJ_RPSCO_LIS - KSTOBLGES | Total cost commitment | |
176 | ![]() |
RCJ_RPSCO_LIS - KSTOBLGES_OC | Total Cost Commitment in Object Currency | |
177 | ![]() |
RCJ_RPSCO_LIS - KZHLNG | Total credit side payments (down payments and payments) | |
178 | ![]() |
RCJ_RPSCO_LIS - KZHLNG_OC | Total Vendor Payments (Down Payments and Payments) OC | |
179 | ![]() |
RCJ_RPSCO_LIS - PROERLPLAN | Current project revenue plan | |
180 | ![]() |
RCJ_RPSCO_LIS - PROERLPLAN_OC | Current Project Revenue Plan in Object Currency | |
181 | ![]() |
RCJ_RPSCO_LIS - PROERLPLN2 | Project revenue plan (version 2) | |
182 | ![]() |
RCJ_RPSCO_LIS - PROERLPLN2_OC | Project Revenue Plan (Version 2) in Object Currency | |
183 | ![]() |
RCJ_RPSCO_LIS - PROKSTPLAN | Current project cost plan | |
184 | ![]() |
RCJ_RPSCO_LIS - PROKSTPLAN_OC | Current Project Cost Plan in Object Currency | |
185 | ![]() |
RCJ_RPSCO_LIS - PROKSTPLN2 | Project cost plan (version 2) | |
186 | ![]() |
RCJ_RPSCO_LIS - PROKSTPLN2_OC | Project Cost Plan (Version 2) in Object Currency | |
187 | ![]() |
RCJ_RPSCO_LIS_APPEND - AUFERLPLAN_OC | Current Order Revenue Plan in Object Currency | |
188 | ![]() |
RCJ_RPSCO_LIS_APPEND - AUFERLPLN2_OC | Order Revenue Plan (Version 2) in Object Currency | |
189 | ![]() |
RCJ_RPSCO_LIS_APPEND - AUFKSTPLAN_OC | Current Order Cost Plan in Object Currency | |
190 | ![]() |
RCJ_RPSCO_LIS_APPEND - AUFKSTPLN2_OC | Order Cost Plan (Version 2) in Object Currency | |
191 | ![]() |
RCJ_RPSCO_LIS_APPEND - AUFTRANF_OC | Residual Order Plan in Object Currency | |
192 | ![]() |
RCJ_RPSCO_LIS_APPEND - BUDGET_OC | Appropriation Budget (Appr.Request Variant Replaced) in OC | |
193 | ![]() |
RCJ_RPSCO_LIS_APPEND - DEBFINPLN_OC | Current Debit Side Cash Budget in Object Currency | |
194 | ![]() |
RCJ_RPSCO_LIS_APPEND - DZHLNG_OC | Total Customer Payments (Down Payments and Payments) OC | |
195 | ![]() |
RCJ_RPSCO_LIS_APPEND - FESTPROBL_OC | Fixed Price Commitment in Object Currency | |
196 | ![]() |
RCJ_RPSCO_LIS_APPEND - FREIGABE_OC | Release in Object Currency | |
197 | ![]() |
RCJ_RPSCO_LIS_APPEND - ISTERLOESE_OC | Actual Revenues in Object Currency | |
198 | ![]() |
RCJ_RPSCO_LIS_APPEND - ISTKOSTEN_OC | Act. Costs in Object Currency | |
199 | ![]() |
RCJ_RPSCO_LIS_APPEND - KREDFINPLN_OC | Current Credit Side Cash Budget in Object Currency | |
200 | ![]() |
RCJ_RPSCO_LIS_APPEND - KSTOBLGES_OC | Total Cost Commitment in Object Currency | |
201 | ![]() |
RCJ_RPSCO_LIS_APPEND - KZHLNG_OC | Total Vendor Payments (Down Payments and Payments) OC | |
202 | ![]() |
RCJ_RPSCO_LIS_APPEND - PROERLPLAN_OC | Current Project Revenue Plan in Object Currency | |
203 | ![]() |
RCJ_RPSCO_LIS_APPEND - PROERLPLN2_OC | Project Revenue Plan (Version 2) in Object Currency | |
204 | ![]() |
RCJ_RPSCO_LIS_APPEND - PROKSTPLAN_OC | Current Project Cost Plan in Object Currency | |
205 | ![]() |
RCJ_RPSCO_LIS_APPEND - PROKSTPLN2_OC | Project Cost Plan (Version 2) in Object Currency | |
206 | ![]() |
RCJ_RPSCO_LIS_OC - AUFERLPLAN_OC | Current Order Revenue Plan in Object Currency | |
207 | ![]() |
RCJ_RPSCO_LIS_OC - AUFERLPLN2_OC | Order Revenue Plan (Version 2) in Object Currency | |
208 | ![]() |
RCJ_RPSCO_LIS_OC - AUFKSTPLAN_OC | Current Order Cost Plan in Object Currency | |
209 | ![]() |
RCJ_RPSCO_LIS_OC - AUFKSTPLN2_OC | Order Cost Plan (Version 2) in Object Currency | |
210 | ![]() |
RCJ_RPSCO_LIS_OC - AUFTRANF_OC | Residual Order Plan in Object Currency | |
211 | ![]() |
RCJ_RPSCO_LIS_OC - BUDGET_OC | Appropriation Budget (Appr.Request Variant Replaced) in OC | |
212 | ![]() |
RCJ_RPSCO_LIS_OC - DEBFINPLN_OC | Current Debit Side Cash Budget in Object Currency | |
213 | ![]() |
RCJ_RPSCO_LIS_OC - DZHLNG_OC | Total Customer Payments (Down Payments and Payments) OC | |
214 | ![]() |
RCJ_RPSCO_LIS_OC - FESTPROBL_OC | Fixed Price Commitment in Object Currency | |
215 | ![]() |
RCJ_RPSCO_LIS_OC - FREIGABE_OC | Release in Object Currency | |
216 | ![]() |
RCJ_RPSCO_LIS_OC - ISTERLOESE_OC | Actual Revenues in Object Currency | |
217 | ![]() |
RCJ_RPSCO_LIS_OC - ISTKOSTEN_OC | Act. Costs in Object Currency | |
218 | ![]() |
RCJ_RPSCO_LIS_OC - KREDFINPLN_OC | Current Credit Side Cash Budget in Object Currency | |
219 | ![]() |
RCJ_RPSCO_LIS_OC - KSTOBLGES_OC | Total Cost Commitment in Object Currency | |
220 | ![]() |
RCJ_RPSCO_LIS_OC - KZHLNG_OC | Total Vendor Payments (Down Payments and Payments) OC | |
221 | ![]() |
RCJ_RPSCO_LIS_OC - PROERLPLAN_OC | Current Project Revenue Plan in Object Currency | |
222 | ![]() |
RCJ_RPSCO_LIS_OC - PROERLPLN2_OC | Project Revenue Plan (Version 2) in Object Currency | |
223 | ![]() |
RCJ_RPSCO_LIS_OC - PROKSTPLAN_OC | Current Project Cost Plan in Object Currency | |
224 | ![]() |
RCJ_RPSCO_LIS_OC - PROKSTPLN2_OC | Project Cost Plan (Version 2) in Object Currency | |
225 | ![]() |
RPSCO_LISC - AUFERLPLAN | Current order revenue plan | |
226 | ![]() |
RPSCO_LISC - AUFERLPLAN_OC | Current Order Revenue Plan in Object Currency | |
227 | ![]() |
RPSCO_LISC - AUFERLPLN2 | Order revenue plan (version 2) | |
228 | ![]() |
RPSCO_LISC - AUFERLPLN2_OC | Order Revenue Plan (Version 2) in Object Currency | |
229 | ![]() |
RPSCO_LISC - AUFKSTPLAN | Current order cost plan | |
230 | ![]() |
RPSCO_LISC - AUFKSTPLAN_OC | Current Order Cost Plan in Object Currency | |
231 | ![]() |
RPSCO_LISC - AUFKSTPLN2 | Order cost plan (version 2) | |
232 | ![]() |
RPSCO_LISC - AUFKSTPLN2_OC | Order Cost Plan (Version 2) in Object Currency | |
233 | ![]() |
RPSCO_LISC - AUFTRANF | Residual order plan | |
234 | ![]() |
RPSCO_LISC - AUFTRANF_OC | Residual Order Plan in Object Currency | |
235 | ![]() |
RPSCO_LISC - BUDGET | Budget of a Measure (App. Request Variant Was Replaced) | |
236 | ![]() |
RPSCO_LISC - BUDGET_OC | Appropriation Budget (Appr.Request Variant Replaced) in OC | |
237 | ![]() |
RPSCO_LISC - DEBFINPLN | Current cash budget, debit side | |
238 | ![]() |
RPSCO_LISC - DEBFINPLN_OC | Current Debit Side Cash Budget in Object Currency | |
239 | ![]() |
RPSCO_LISC - DZHLNG | Total debit side payments (down payments and payments) | |
240 | ![]() |
RPSCO_LISC - DZHLNG_OC | Total Customer Payments (Down Payments and Payments) OC | |
241 | ![]() |
RPSCO_LISC - EV_ACT_CORR1 | Budgeted cost of work performed, adjusted | |
242 | ![]() |
RPSCO_LISC - EV_ACT_CORR1_OC | Budgeted cost of work performed, adjusted | |
243 | ![]() |
RPSCO_LISC - EV_ACT_ORG1 | Budgeted cost of work performed | |
244 | ![]() |
RPSCO_LISC - EV_ACT_ORG1_OC | Budgeted cost of work performed | |
245 | ![]() |
RPSCO_LISC - EV_ACT_QUAN_CORR1 | Budgeted cost of work performed, adjusted quantity | |
246 | ![]() |
RPSCO_LISC - EV_ACT_QUAN_CORR1_UNIT | BCWP, Adjusted Quantity (Unit) | |
247 | ![]() |
RPSCO_LISC - EV_ACT_QUAN_ORG1 | Budgeted cost of work performed, quantity | |
248 | ![]() |
RPSCO_LISC - EV_ACT_QUAN_ORG1_UNIT | BCWP, Unit of Measure | |
249 | ![]() |
RPSCO_LISC - EV_COST_INDX_CORR | Cost Index Based on EV_ACT_CORR1 | |
250 | ![]() |
RPSCO_LISC - EV_COST_INDX_ORG | Cost Index Based on EV_ACT_ORG1 | |
251 | ![]() |
RPSCO_LISC - EV_COST_VAR_CORR | Cost Variance Based on EV_ACT_CORR1 | |
252 | ![]() |
RPSCO_LISC - EV_COST_VAR_CORR_OC | Schedule Variance Based on EV_ACT_CORR1 | |
253 | ![]() |
RPSCO_LISC - EV_COST_VAR_ORG | Cost Variance Based on EV_ACT_ORG1 | |
254 | ![]() |
RPSCO_LISC - EV_COST_VAR_ORG_OC | Cost Variance Based on EV_ACT_ORG1 | |
255 | ![]() |
RPSCO_LISC - EV_PLAN_ORG1 | Budgeted cost of work scheduled | |
256 | ![]() |
RPSCO_LISC - EV_PLAN_ORG1_OC | Budgeted cost of work scheduled | |
257 | ![]() |
RPSCO_LISC - EV_PLAN_QUAN_ORG1 | Budgeted cost of work scheduled, quantity | |
258 | ![]() |
RPSCO_LISC - EV_PLAN_QUAN_ORG1_UNIT | BCWS, Unit of Measure | |
259 | ![]() |
RPSCO_LISC - EV_SCHED_INDX_CORR | Date Index Based on POC_ACT_CORR_AGG1 | |
260 | ![]() |
RPSCO_LISC - EV_SCHED_INDX_ORG | Date Index Based on POC_ACT_ORG_AGG1 | |
261 | ![]() |
RPSCO_LISC - EV_SCHED_VAR_CORR | Schedule Variance Based on EV_ACT_CORR1 | |
262 | ![]() |
RPSCO_LISC - EV_SCHED_VAR_CORR_OC | Cost Variance Based on EV_ACT_CORR1 | |
263 | ![]() |
RPSCO_LISC - EV_SCHED_VAR_ORG | Schedule Variance Based on EV_ACT_ORG1 | |
264 | ![]() |
RPSCO_LISC - EV_SCHED_VAR_ORG_OC | Schedule Variance Based on EV_ACT_ORG1 | |
265 | ![]() |
RPSCO_LISC - FESTPROBL | Fixed price commitment | |
266 | ![]() |
RPSCO_LISC - FESTPROBL_OC | Fixed Price Commitment in Object Currency | |
267 | ![]() |
RPSCO_LISC - FREIGABE | Release | |
268 | ![]() |
RPSCO_LISC - FREIGABE_OC | Release in Object Currency | |
269 | ![]() |
RPSCO_LISC - ISTERLOESE | Actual revenues | |
270 | ![]() |
RPSCO_LISC - ISTERLOESE_OC | Actual Revenues in Object Currency | |
271 | ![]() |
RPSCO_LISC - ISTKOSTEN | Actual costs | |
272 | ![]() |
RPSCO_LISC - ISTKOSTEN_OC | Act. Costs in Object Currency | |
273 | ![]() |
RPSCO_LISC - KREDFINPLN | Current financial budget, credit side | |
274 | ![]() |
RPSCO_LISC - KREDFINPLN_OC | Current Credit Side Cash Budget in Object Currency | |
275 | ![]() |
RPSCO_LISC - KSTOBLGES | Total cost commitment | |
276 | ![]() |
RPSCO_LISC - KSTOBLGES_OC | Total Cost Commitment in Object Currency | |
277 | ![]() |
RPSCO_LISC - KZHLNG | Total credit side payments (down payments and payments) | |
278 | ![]() |
RPSCO_LISC - KZHLNG_OC | Total Vendor Payments (Down Payments and Payments) OC | |
279 | ![]() |
RPSCO_LISC - POC_ACT_CORR_AGG1 | Adjusted aggregated actual POC | |
280 | ![]() |
RPSCO_LISC - POC_ACT_CORR_NAGG1 | Adjusted non-aggregated actual percentage of completion | |
281 | ![]() |
RPSCO_LISC - POC_ACT_ORG_AGG1 | Aggregated actual POC | |
282 | ![]() |
RPSCO_LISC - POC_ACT_ORG_NAGG1 | Non-aggregated actual percentage of completion | |
283 | ![]() |
RPSCO_LISC - POC_PLAN_ORG_AGG1 | Aggregate planned percentage of completion | |
284 | ![]() |
RPSCO_LISC - POC_PLAN_ORG_NAGG1 | Non-aggregated planned percentage of completion | |
285 | ![]() |
RPSCO_LISC - PROERLPLAN | Current project revenue plan | |
286 | ![]() |
RPSCO_LISC - PROERLPLAN_OC | Current Project Revenue Plan in Object Currency | |
287 | ![]() |
RPSCO_LISC - PROERLPLN2 | Project revenue plan (version 2) | |
288 | ![]() |
RPSCO_LISC - PROERLPLN2_OC | Project Revenue Plan (Version 2) in Object Currency | |
289 | ![]() |
RPSCO_LISC - PROKSTPLAN | Current project cost plan | |
290 | ![]() |
RPSCO_LISC - PROKSTPLAN_OC | Current Project Cost Plan in Object Currency | |
291 | ![]() |
RPSCO_LISC - PROKSTPLN2 | Project cost plan (version 2) | |
292 | ![]() |
RPSCO_LISC - PROKSTPLN2_OC | Project Cost Plan (Version 2) in Object Currency |