Message Number list used by SAP ABAP Program MMPKRI10 (Checking Module for Control Cycle Item)
SAP ABAP Program
MMPKRI10 (Checking Module for Control Cycle Item) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
PK - 306 | Set the bulk material indicator in the material master | |
2 | ![]() |
PK - 320 | Specify a cost center | |
3 | ![]() |
PK - 318 | JIT call profile & does not exist | |
4 | ![]() |
PK - 316 | Cost center & does not exist | |
5 | ![]() |
PK - 314 | Supply source supply area must differ from target supply area | |
6 | ![]() |
PK - 313 | StorLoc of source supply area must correspond to stck-transfer stor.loc. | |
7 | ![]() |
PK - 309 | You have changed the supply area in the control cycle | |
8 | ![]() |
PK - 308 | The stor. locs of previous supply area &1 and supply area &2 must match | |
9 | ![]() |
PK - 307 | The bulk material ind. in the material master does not suit this strategy | |
10 | ![]() |
PK - 333 | Material produced in-house cannot be procured to cost center | |
11 | ![]() |
PK - 301 | Enter a kanban quantity greater than zero | |
12 | ![]() |
PK - 292 | Calculation of the kanban quantity not possible, &1 - &2 >= zero | |
13 | ![]() |
PK - 282 | SD scheduling agreement &1 does not exist | |
14 | ![]() |
PK - 278 | Warehouse no. changed to &3 to correspond to plant &1 and stor. loc. &2 | |
15 | ![]() |
PK - 277 | Storage type &2 does not exist in warehouse number &1 | |
16 | ![]() |
PK - 261 | Authorization profile &1 not possible for this control cycle | |
17 | ![]() |
PK - 241 | Calculation profile & does not exist in plant & | |
18 | ![]() |
PK - 236 | Quantity per kanban should be a multiple of the rounding quantity | |
19 | ![]() |
PK - 375 | Supply area stor.loc.does not match corresponding entry in WM Customizing | |
20 | ![]() |
PK - 478 | Select value 1 for the "Trigger Replenishment" field | |
21 | ![]() |
PK - 463 | Authorization type &1 not possible with "one-card kanban" | |
22 | ![]() |
PK - 460 | Creation of several planned orders with one action is not possible | |
23 | ![]() |
PK - 397 | Scheduling agreement plant does not correspond to control cycle plant | |
24 | ![]() |
PK - 396 | Creation of several Kanbans for direct transfer posting not possible | |
25 | ![]() |
PK - 394 | Material &1 has not been created for stock transfer location &2 | |
26 | ![]() |
PK - 384 | Supply area storage loc. not in same MRP area as sched. agrmnt stor. loc. | |
27 | ![]() |
PK - 381 | This replenishment strategy cannot be used within WM | |
28 | ![]() |
PK - 235 | Rounding quantity must be multiple of the fixed kanban quantity | |
29 | ![]() |
PK - 372 | The materials from control cycle and packing instructions do not match | |
30 | ![]() |
PK - 370 | Storage bin already used for supply area &2 in plant &1 | |
31 | ![]() |
PK - 364 | Here only packing instructions with a single material can be used | |
32 | ![]() |
PK - 356 | The indicator 'separate GR' cannot be deleted at the moment | |
33 | ![]() |
PK - 348 | Use 2 containers only for the one-card Kanban | |
34 | ![]() |
PK - 337 | Outline agreement item &1 &2 cannot be used | |
35 | ![]() |
PK - 334 | Maintain the data for forward scheduling | |
36 | ![]() |
PK - 033 | Storage bin & / & / & does not exist | |
37 | ![]() |
PK - 158 | Order & with item & does not exist | |
38 | ![]() |
PK - 079 | You must specify a scheduling agreement for this process | |
39 | ![]() |
PK - 078 | You must specify the version for this process | |
40 | ![]() |
PK - 067 | Vendor & or info record does not exist or is not correct | |
41 | ![]() |
PK - 053 | Flag the kanbans for deletion or increase the number of kanbans | |
42 | ![]() |
PK - 050 | kanban & does not exist | |
43 | ![]() |
PK - 040 | Material & has not been created for storage location & | |
44 | ![]() |
PK - 034 | Storage location & in plant & does not exist | |
45 | ![]() |
PK - 159 | Order & is not a scheduling agreement | |
46 | ![]() |
PK - 032 | Production version & does not exist for material & in plant & | |
47 | ![]() |
PK - 023 | A control cycle must contain at least 2 kanbans | |
48 | ![]() |
PK - 022 | No.of kanbans not equal to control cycle data; data will be changed | |
49 | ![]() |
PK - 009 | Control cycle & & & already exists | |
50 | ![]() |
PK - 007 | Replenishment strategy & in plant & does not exist | |
51 | ![]() |
PK - 006 | Responsible person & does not exist; check your entry | |
52 | ![]() |
PK - 005 | You must select a number less than the total number of kanbans | |
53 | ![]() |
PK - 193 | Strategy not allowed for stge location that is not included in planning | |
54 | ![]() |
PK - 234 | Quantity per kanban should be a multiple of the fixed kanban quantity | |
55 | ![]() |
PK - 231 | Replenishment lead time (hrs:mins) only makes sense with shift program | |
56 | ![]() |
PK - 217 | Independent source requires normal replenishment trigger | |
57 | ![]() |
PK - 214 | Trigger qty must be smaller than kanban qty and greater than zero | |
58 | ![]() |
PK - 213 | Status "&" cannot be prohibited for this process | |
59 | ![]() |
PK - 199 | Status sequence & does not exist | |
60 | ![]() |
PK - 196 | Delivery schedule cannot have Kanban indicator in this procedure | |
61 | ![]() |
PK - 194 | Storage location must differ from supply area's storage location | |
62 | ![]() |
PK - 003 | Supply area & does not exist | |
63 | ![]() |
PK - 192 | Strategy not allowed for stge location that is included in planning | |
64 | ![]() |
PK - 183 | Printer &1 not found | |
65 | ![]() |
PK - 182 | Vendor does not suit the outline agreement | |
66 | ![]() |
PK - 181 | Purchasing info system does not suit the outline agreement | |
67 | ![]() |
PK - 179 | Agreement & item & does not apply to material & | |
68 | ![]() |
PK - 161 | Scheduling agreement item has no kanban indicator & or an incorrect one | |
69 | ![]() |
PK - 160 | Contract does not refer to storage location for supply area |