Table/Structure Field list used by SAP ABAP Program MMPKCS30_TEST (Verarbeitung)
SAP ABAP Program
MMPKCS30_TEST (Verarbeitung) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
DISVARIANT - REPORT | ABAP Program Name | |
2 | ![]() |
PKEC - KCEDT | Creation date of the change proposal | |
3 | ![]() |
PKEC - MSGID | Application Area | |
4 | ![]() |
PKEC - MSGNR | Message number | |
5 | ![]() |
PKEC - MSGTY | Message Type | |
6 | ![]() |
PKEC - MSGV1 | Message variable 01 | |
7 | ![]() |
PKEC - MSGV2 | Message variable 02 | |
8 | ![]() |
PKEC - MSGV3 | Message variable 03 | |
9 | ![]() |
PKEC - MSGV4 | Message variable 04 | |
10 | ![]() |
PKEC - PKNUM | Control cycle number | |
11 | ![]() |
PKHD - KWBZD | Replenishment Lead Time in Workdays | |
12 | ![]() |
PKHD - WERKS | Plant | |
13 | ![]() |
PKHD - PRVBE | Production Supply Area | |
14 | ![]() |
PKHD - PKNUM | Control cycle number | |
15 | ![]() |
PKHD - MATNR | Material Number | |
16 | ![]() |
PKHD - LCM_STATUS | Lifecycle Status of Control Cycle | |
17 | ![]() |
PKHD - KWBZM | Replenishment Lead Time in Hours/Minutes | |
18 | ![]() |
PKHD - KCSAF | Safety Factor for Kanban Calculation | |
19 | ![]() |
PKHD - KCPRF | Kanban Calculation Profile | |
20 | ![]() |
PKHD - KCCON | Constant for Kanban Calculation | |
21 | ![]() |
PKHD - KCART | Ind.: Whether and How a Kanban Control Cycle is Calculated | |
22 | ![]() |
PKHD_ALV - PKBOX | ALV Checkbox | |
23 | ![]() |
PKHD_ALV - PKNUM | Control cycle number | |
24 | ![]() |
PKPR - KCBDT | End of evaluation period for kanban calculation | |
25 | ![]() |
PKPR - KCVDT | Start of evaluation period for kanban calculation | |
26 | ![]() |
PKPR - PKNUM | Control cycle number | |
27 | ![]() |
PKPS_ALV - PKBOX | ALV Checkbox | |
28 | ![]() |
PVBE - LGORT | Storage location | |
29 | ![]() |
PVBE - WERKS | Plant | |
30 | ![]() |
PVBE - PRVBE | Production Supply Area | |
31 | ![]() |
RMPKC - PCLTP | Kanban Calculation with Long-Term Planning Data | |
32 | ![]() |
RMPKC - PCMRP | Kanban calculation using data from MRP | |
33 | ![]() |
RMPKC - PLSCN | Planning Scenario of Long-Term Planning | |
34 | ![]() |
SYST - MSGV4 | ABAP System Field: Message Variable | |
35 | ![]() |
SYST - UCOMM | ABAP System Field: PAI-Triggering Function Code | |
36 | ![]() |
SYST - TABIX | ABAP System Field: Row Index of Internal Tables | |
37 | ![]() |
SYST - MSGV3 | ABAP System Field: Message Variable | |
38 | ![]() |
SYST - MSGV2 | ABAP System Field: Message Variable | |
39 | ![]() |
SYST - MSGV1 | ABAP System Field: Message Variable | |
40 | ![]() |
SYST - MSGTY | ABAP System Field: Message Type | |
41 | ![]() |
SYST - MSGNO | ABAP System Field: Message Number | |
42 | ![]() |
SYST - MSGID | ABAP System Field: Message ID | |
43 | ![]() |
SYST - DYNNR | ABAP System Field: Current Dynpro Number | |
44 | ![]() |
SYST - DATUM | ABAP System Field: Current Date of Application Server | |
45 | ![]() |
TPKBP - KCART | Ind.: Whether and How a Kanban Control Cycle is Calculated | |
46 | ![]() |
TPKBP - KCCON | Constant for Kanban Calculation | |
47 | ![]() |
TPKBP - KCPRF | Kanban Calculation Profile | |
48 | ![]() |
TPKBP - KCSAF | Safety Factor for Kanban Calculation | |
49 | ![]() |
TPKBP - KWBZD | Replenishment Lead Time in Workdays | |
50 | ![]() |
TPKBP - KWBZM | Replenishment Lead Time in Hours/Minutes | |
51 | ![]() |
TPKBP - WERKS | Plant | |
52 | ![]() |
TPKRQ - LGORT | Storage location | |
53 | ![]() |
TPKRQ - MATNR | Material Number | |
54 | ![]() |
TPKRQ - WERKS | Plant |