Table/Structure Field list used by SAP ABAP Program MMPKCB03 (Datenlesen)
SAP ABAP Program MMPKCB03 (Datenlesen) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
1 | Table/Structure Field | AMPKR - FLG01 | Checkbox | |
2 | Table/Structure Field | PKHD - BEHAZ | Number of Kanban Containers | |
3 | Table/Structure Field | PKHD - WERKS | Plant | |
4 | Table/Structure Field | PKHD - UMLGO | Storage location | |
5 | Table/Structure Field | PKHD - TRIGAZ | Trigger Point for Waiting Kanbans | |
6 | Table/Structure Field | PKHD - RKSTA | Control Cycle Category | |
7 | Table/Structure Field | PKHD - RGVER | Person Responsible for Supply Source | |
8 | Table/Structure Field | PKHD - PRVBE | Production Supply Area | |
9 | Table/Structure Field | PKHD - PKUMW | Issuing Plant in Kanban Processing | |
10 | Table/Structure Field | PKHD - PKSTU | Control Cycle Replenishment Strategy for Stock Transfer | |
11 | Table/Structure Field | PKHD - PKSTE | Control Cycle Replenishment Strategy for In-House Production | |
12 | Table/Structure Field | PKHD - PKNUM | Control cycle number | |
13 | Table/Structure Field | PKHD - MATNR | Material Number | |
14 | Table/Structure Field | PKHD - LIFNR | Vendor's account number | |
15 | Table/Structure Field | PKHD - LCM_STATUS | Lifecycle Status of Control Cycle | |
16 | Table/Structure Field | PKHD - KCPRF | Kanban Calculation Profile | |
17 | Table/Structure Field | PKHD - KCART | Ind.: Whether and How a Kanban Control Cycle is Calculated | |
18 | Table/Structure Field | PKHD - BEHMG | Kanban Quantity | |
19 | Table/Structure Field | PKHD - PKSTF | Replenishment Strategy of Control Cycle - Ext. Procurement | |
20 | Table/Structure Field | PKPR - NEXAZ | Number of kanbans for the next change of the control cylce | |
21 | Table/Structure Field | PKPR - PKNUM | Control cycle number | |
22 | Table/Structure Field | PKPR - PCMIM | Minimum quantity per kanban in period of evaluation | |
23 | Table/Structure Field | PKPR - PCMIA | Minimum number of kanbans in the period of examination | |
24 | Table/Structure Field | PKPR - PCMAM | Maximum kanban quantity in the period of examination | |
25 | Table/Structure Field | PKPR - PCMAA | Maximum number of kanbans in the evaluation period | |
26 | Table/Structure Field | PKPR - NEXMG | Quantity per Kanban for Next Change of a Control Cycle | |
27 | Table/Structure Field | PKPR - NEXDT | Date of the next change of a kanban control cycle | |
28 | Table/Structure Field | PKPR - KCEDT | Creation date of the change proposal | |
29 | Table/Structure Field | PKPS - PKLKZ | Deletion Indicator for a Kanban | |
30 | Table/Structure Field | PKPS - PKPOS | Kanban item number / control cycle item | |
31 | Table/Structure Field | PKPS - PKNUM | Control cycle number | |
32 | Table/Structure Field | PVBE - LGORT | Storage location | |
33 | Table/Structure Field | PVBE - PRVBE | Production Supply Area | |
34 | Table/Structure Field | PVBE - RGVER | Person responsible for one or more supply areas | |
35 | Table/Structure Field | PVBE - WERKS | Plant | |
36 | Table/Structure Field | RMPKR - KPDAT | Check calculation proposal for next change to date | |
37 | Table/Structure Field | RMPKR - KPMAA | Minimum difference: maximum number from current number | |
38 | Table/Structure Field | RMPKR - KPMAM | Difference between maximum quantity and current quantity | |
39 | Table/Structure Field | RMPKR - KPMIA | Difference between minimum number and current number | |
40 | Table/Structure Field | RMPKR - KPMIM | Difference between minimum quantity and current quantity | |
41 | Table/Structure Field | RMPKR - KPNEA | Difference between next number and current number | |
42 | Table/Structure Field | RMPKR - KPNEM | Difference between next change and current quantity | |
43 | Table/Structure Field | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | |
44 | Table/Structure Field | TPK00 - VPACK | Use of Packing Instructions in the KANBAN Control Cycle | |
45 | Table/Structure Field | TPK01 - PKSTE | Control Cycle Replenishment Strategy for In-House Production | |
46 | Table/Structure Field | TPK01 - VPACK | Use of Packing Instructions in the KANBAN Control Cycle | |
47 | Table/Structure Field | TPK01 - WERKS | Plant | |
48 | Table/Structure Field | TPK02 - PKSTF | Replenishment Strategy of Control Cycle - Ext. Procurement | |
49 | Table/Structure Field | TPK02 - VPACK | Use of Packing Instructions in the KANBAN Control Cycle | |
50 | Table/Structure Field | TPK02 - WERKS | Plant | |
51 | Table/Structure Field | TPK03 - PKSTU | Control Cycle Replenishment Strategy for Stock Transfer | |
52 | Table/Structure Field | TPK03 - VPACK | Use of Packing Instructions in the KANBAN Control Cycle | |
53 | Table/Structure Field | TPK03 - WERKS | Plant | |
54 | Table/Structure Field | TPKBP - KCART | Ind.: Whether and How a Kanban Control Cycle is Calculated | |
55 | Table/Structure Field | TPKBP - KCPRF | Kanban Calculation Profile | |
56 | Table/Structure Field | TPKBP - WERKS | Plant | |
57 | Table/Structure Field | TPKGP - LCMFG | Activation of Lifecycle for Control Cycle in Kanban |