Table/Structure Field list used by SAP ABAP Program MM61GF30_FCODE_POST (FCODE_POST)
SAP ABAP Program
MM61GF30_FCODE_POST (FCODE_POST) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
MDKS - AUFNR | Order Number | |
2 | ![]() |
PKOSA - AUFNR | Order Number | |
3 | ![]() |
SAFK - VERID | Production Version | |
4 | ![]() |
SAFK - WERKS | Plant | |
5 | ![]() |
SAFK - QPLOS | Inspection Lot Number | |
6 | ![]() |
SAFK - PKOSA | Cost collector for production process PROCNR | |
7 | ![]() |
SAFK - PHAS0 | Indicator for blocking run schedule header | |
8 | ![]() |
SAFK - MDV02 | Planning identification 2 | |
9 | ![]() |
SAFK - MDV01 | Production line | |
10 | ![]() |
SAFK - LOEKZ | Deletion indicator | |
11 | ![]() |
SAFK - ENDAY | End of validity period of the RS header | |
12 | ![]() |
SAFK - BSTMA | Upper value of the lot-size interval | |
13 | ![]() |
SAFK - AUFNR | Run schedule header number | |
14 | ![]() |
SAFK - AUART | Production type | |
15 | ![]() |
SAFK - AENAM | Last changed by | |
16 | ![]() |
SAFK - AEDAT | Change Date | |
17 | ![]() |
SAFK - MATNR | Material number | |
18 | ![]() |
SYST - MSGNO | ABAP System Field: Message Number | |
19 | ![]() |
SYST - UNAME | ABAP System Field: Name of Current User | |
20 | ![]() |
SYST - MSGV4 | ABAP System Field: Message Variable | |
21 | ![]() |
SYST - MSGV3 | ABAP System Field: Message Variable | |
22 | ![]() |
SYST - MSGV2 | ABAP System Field: Message Variable | |
23 | ![]() |
SYST - MSGV1 | ABAP System Field: Message Variable | |
24 | ![]() |
SYST - MSGTY | ABAP System Field: Message Type | |
25 | ![]() |
SYST - MSGID | ABAP System Field: Message ID | |
26 | ![]() |
SYST - DATLO | ABAP System Field: Local Date of Current User | |
27 | ![]() |
T437S - BCKFL | Backflush with cost estimate/standard cost est. for material | |
28 | ![]() |
T437S - REPPT | Backflushing with reporting points | |
29 | ![]() |
T450 - MDAKT | Activity types in materials planning | |
30 | ![]() |
T460D - NUMKI | Internal numer range for material requirements planning |