Table/Structure Field list used by SAP ABAP Program MM60EF0P (MDM: Create Master IDoc DEBMAS from SMD, suppress feedback message)
SAP ABAP Program MM60EF0P (MDM: Create Master IDoc DEBMAS from SMD, suppress feedback message) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
1 | Table/Structure Field | AM60X - ANDEC | No. of decimal places to which rounding should be performed | |
2 | Table/Structure Field | AM60X - DATUBI | Requirements date to | |
3 | Table/Structure Field | AM60X - DATUVI | Requirements date | |
4 | Table/Structure Field | AM60X - ENTLI | Date type (day, week, month, interval) | |
5 | Table/Structure Field | AM60X - FKDIF | Factory calendar day | |
6 | Table/Structure Field | AM60X - H_DATUM | Delivery/order finish date | |
7 | Table/Structure Field | AM60X - H_ENTLI | Date type (day, week, month, interval) | |
8 | Table/Structure Field | AM60X - MNG01 | Quantity | |
9 | Table/Structure Field | AM60X - MNG02 | Quantity | |
10 | Table/Structure Field | AM60X - MNG03 | Quantity | |
11 | Table/Structure Field | AM60X - PERIO | Requirements date | |
12 | Table/Structure Field | AM60X - PLGMG | Total planning quantity | |
13 | Table/Structure Field | APET - CUOBJ | Configuration (internal object number) | |
14 | Table/Structure Field | APET - ENTLI | Date type (day, week, month, interval) | |
15 | Table/Structure Field | APET - ENTLU | Period indicator (day, week, month, posting period) | |
16 | Table/Structure Field | APET - PDATU | Delivery/order finish date | |
17 | Table/Structure Field | APET - PERXX | Planning period | |
18 | Table/Structure Field | APET - PLNMG | Planned quantity | |
19 | Table/Structure Field | MAPR - DATUM | System Date | |
20 | Table/Structure Field | MAPR - MATNR | Material Number | |
21 | Table/Structure Field | MAPR - PERKZ | Period indicator | |
22 | Table/Structure Field | MAPR - PNUM1 | Pointer: forecast parameters | |
23 | Table/Structure Field | MAPR - UZEIT | System Time | |
24 | Table/Structure Field | MAPR - WERKS | Plant | |
25 | Table/Structure Field | PBED - BDZEI | Independent requirements pointer | |
26 | Table/Structure Field | PBED - PDATU | Delivery/order finish date | |
27 | Table/Structure Field | PBET - AENAM | Name of Person Who Changed Object | |
28 | Table/Structure Field | PBET - AUFTV | Split already exists | |
29 | Table/Structure Field | PBET - CUOBJ | Configuration (internal object number) | |
30 | Table/Structure Field | PBET - DBMNG | Planned quantity in the data base | |
31 | Table/Structure Field | PBET - DBVKZ | Indicator: reqmts date already exists in database | |
32 | Table/Structure Field | PBET - ENTLI | Date type (day, week, month, interval) | |
33 | Table/Structure Field | PBET - ENTLU | Period indicator (day, week, month, posting period) | |
34 | Table/Structure Field | PBET - ENTMG | Withdrawal quantity | |
35 | Table/Structure Field | PBET - LAEDA | Date of Last Change | |
36 | Table/Structure Field | PBET - MEINS | Base Unit of Measure | |
37 | Table/Structure Field | PBET - PDATU | Delivery/order finish date | |
38 | Table/Structure Field | PBET - PERXX | Planning period | |
39 | Table/Structure Field | PBET - PLNMG | Planned quantity | |
40 | Table/Structure Field | PBET - POSNR | Requirements plan item | |
41 | Table/Structure Field | PBET - SERNR | BOM explosion number | |
42 | Table/Structure Field | PBET - UPDKZ | Update indicator | |
43 | Table/Structure Field | PBET - VERID | Production Version | |
44 | Table/Structure Field | PBHI - BDZEI | Independent requirements pointer | |
45 | Table/Structure Field | PBHI - LAEDA | Date of Last Change | |
46 | Table/Structure Field | PBHI - PDATU | Delivery/order finish date | |
47 | Table/Structure Field | PBHI - UZEIT | Time | |
48 | Table/Structure Field | PBMSG - MSGTY | Message Type | |
49 | Table/Structure Field | PBPT - ANZET | Independent requirements - schedule line number | |
50 | Table/Structure Field | PBPT - BEDAE | Requirements type | |
51 | Table/Structure Field | PBPT - DATET | Delivery/order finish date | |
52 | Table/Structure Field | PBPT - DBPKZ | Indicator: item already exists in the data base | |
53 | Table/Structure Field | PBPT - KDAUF | Sales Order Number | |
54 | Table/Structure Field | PBPT - MATNR | Material Number | |
55 | Table/Structure Field | PBPT - MEINS | Base Unit of Measure | |
56 | Table/Structure Field | PBPT - OPLKZ | With no MRP | |
57 | Table/Structure Field | PBPT - PBDNR | Requirements Plan Number | |
58 | Table/Structure Field | PBPT - PERIV | Fiscal Year Variant | |
59 | Table/Structure Field | PBPT - PLGMG | Total planning quantity | |
60 | Table/Structure Field | PBPT - POSNR | Requirements plan item | |
61 | Table/Structure Field | PBPT - PSPEL | Work Breakdown Structure Element (WBS Element) | |
62 | Table/Structure Field | PBPT - VERKZ | Consumption indicator for planning requirements | |
63 | Table/Structure Field | PBPT - VERSB | Version number for independent requirements | |
64 | Table/Structure Field | PBPT - VERVS | Indicator: Version Active | |
65 | Table/Structure Field | PBPT - WERKS | Plant | |
66 | Table/Structure Field | PGABS - ERTAG | First day of the period to which the values refer | |
67 | Table/Structure Field | PGABS - MENGE | Quantity | |
68 | Table/Structure Field | PGABS - PERID | Period: day, week, month, posting period as rep. internally | |
69 | Table/Structure Field | PGABS - PERKZ | Period indicator | |
70 | Table/Structure Field | PROP - HSNUM | Number for history | |
71 | Table/Structure Field | PROP - PNUM1 | Pointer: forecast parameters | |
72 | Table/Structure Field | PROP - PNUM2 | Pointer for forecast results | |
73 | Table/Structure Field | PROP - VERSP | Version number of forecast parameters | |
74 | Table/Structure Field | PROW - ERTAG | First day of the period to which the values refer | |
75 | Table/Structure Field | PROW - KOPRW | Corrected value for forecast | |
76 | Table/Structure Field | PROW - PNUM2 | Pointer for forecast results | |
77 | Table/Structure Field | RBET - ENTLI | Date type (day, week, month, interval) | |
78 | Table/Structure Field | RBET - ENTLU | Period indicator (day, week, month, posting period) | |
79 | Table/Structure Field | RBET - PDATU | Delivery/order finish date | |
80 | Table/Structure Field | RBET - PERXX | Planning period | |
81 | Table/Structure Field | RBET - PLNMG | Planned quantity | |
82 | Table/Structure Field | RBET - POSNR | Requirements plan item | |
83 | Table/Structure Field | RBET - VERID | Production Version | |
84 | Table/Structure Field | RBPT - BEDAE | Requirements type | |
85 | Table/Structure Field | RBPT - DATLP | Date | |
86 | Table/Structure Field | RBPT - MATNR | Material Number | |
87 | Table/Structure Field | RBPT - MEINS | Base Unit of Measure | |
88 | Table/Structure Field | RBPT - MRPPP | PPC planning calendar | |
89 | Table/Structure Field | RBPT - PBDNR | Requirements Plan Number | |
90 | Table/Structure Field | RBPT - PERIV | Fiscal Year Variant | |
91 | Table/Structure Field | RBPT - PLGMG | Total planning quantity | |
92 | Table/Structure Field | RBPT - POSNR | Requirements plan item | |
93 | Table/Structure Field | RBPT - UEBKZ | Indicator: data copied | |
94 | Table/Structure Field | RBPT - UHRLP | Time | |
95 | Table/Structure Field | RBPT - VERID | Production Version | |
96 | Table/Structure Field | RBPT - VERSB | Version number for independent requirements | |
97 | Table/Structure Field | RBPT - WERKS | Plant | |
98 | Table/Structure Field | RM60E - PBET_SELKZ | Selection indicator for list screens | |
99 | Table/Structure Field | RM60E - PLNMG | Planned quantity | |
100 | Table/Structure Field | RM60E - SERNR | BOM explosion number | |
101 | Table/Structure Field | RM60E - VERID | Production Version | |
102 | Table/Structure Field | RM60E - WUMNG | Total requested quantity | |
103 | Table/Structure Field | RM60X - EDATBI | Delivery/order finish date | |
104 | Table/Structure Field | RM60X - EDATV | Requirements date | |
105 | Table/Structure Field | RM60X - EDATVI | Delivery/order finish date | |
106 | Table/Structure Field | RM60X - ENTLI | Date type (day, week, month, interval) | |
107 | Table/Structure Field | RM60X - ENTLU | Period indicator (day, week, month, posting period) | |
108 | Table/Structure Field | RM60X - SERNR | BOM explosion number | |
109 | Table/Structure Field | SYST - BINPT | ABAP System Field: Batch Input Processing Active | |
110 | Table/Structure Field | SYST - DATLO | ABAP System Field: Local Date of Current User | |
111 | Table/Structure Field | SYST - DATUM | ABAP System Field: Current Date of Application Server | |
112 | Table/Structure Field | SYST - MSGNO | ABAP System Field: Message Number | |
113 | Table/Structure Field | SYST - STEPL | ABAP System Field: Current Step Loop or Table Control Line | |
114 | Table/Structure Field | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | |
115 | Table/Structure Field | SYST - UNAME | ABAP System Field: Name of Current User | |
116 | Table/Structure Field | T006 - ANDEC | No. of decimal places to which rounding should be performed | |
117 | Table/Structure Field | T006 - MSEHI | Unit of Measurement | |
118 | Table/Structure Field | T185F - FCODE | Function code | |
119 | Table/Structure Field | T399Q - FIXMS | Message indicator | |
120 | Table/Structure Field | T399Q - FXHPB | Planning time fence for independent requirements | |
121 | Table/Structure Field | T438A - DISMM | MRP Type | |
122 | Table/Structure Field | T438A - PROKZ | Forecast indicator | |
123 | Table/Structure Field | T450P - TRTYP | Transaction type | |
124 | Table/Structure Field | T450P - URPET | Schedule lines: period split or period totals |