Table/Structure Field list used by SAP ABAP Program MC65AFXL (Include for EXCEL Listviewer)
SAP ABAP Program MC65AFXL (Include for EXCEL Listviewer) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
1 | Table/Structure Field | RC65D - ABKRS | Processing group | |
2 | Table/Structure Field | RC65D - ABRUE | Teardown | |
3 | Table/Structure Field | RC65D - ANGEB | Available capacity as field of type P | |
4 | Table/Structure Field | RC65D - APRIO | Order priority | |
5 | Table/Structure Field | RC65D - ARBEH | Unit for work | |
6 | Table/Structure Field | RC65D - ARBEI | Work involved in the activity | |
7 | Table/Structure Field | RC65D - ARBPL | Work center | |
8 | Table/Structure Field | RC65D - ARBPLTEXT | Text describing work center in more detail | |
9 | Table/Structure Field | RC65D - ARUZE | Unit of measure for teardown | |
10 | Table/Structure Field | RC65D - ASVRG | Operation scrap | |
11 | Table/Structure Field | RC65D - AUART | Category of pegged requirement | |
12 | Table/Structure Field | RC65D - AUFFX | Firming indicator for planned order data | |
13 | Table/Structure Field | RC65D - AUFNR | Order Number | |
14 | Table/Structure Field | RC65D - AUTYP | Order category | |
15 | Table/Structure Field | RC65D - AWTXT | User status set at order level | |
16 | Table/Structure Field | RC65D - AWVST | User status set at operation level | |
17 | Table/Structure Field | RC65D - BEARZ | Processing time | |
18 | Table/Structure Field | RC65D - BEAZE | Unit of measure for processing time | |
19 | Table/Structure Field | RC65D - BEDARF | Capacity requirements | |
20 | Table/Structure Field | RC65D - BED_EINH | Unit of of measure for displaying capacity requirements | |
21 | Table/Structure Field | RC65D - BED_MENGE | Order quantity displayed in a list | |
22 | Table/Structure Field | RC65D - BED_VERUR | Pegged requirements (work- or planned order) as type char. | |
23 | Table/Structure Field | RC65D - BUKRS | Company Code | |
24 | Table/Structure Field | RC65D - CCKEY | Cost collector key | |
25 | Table/Structure Field | RC65D - DAUNE | Normal duration/unit | |
26 | Table/Structure Field | RC65D - DAUNO | Normal duration of the activity | |
27 | Table/Structure Field | RC65D - DISPO | MRP controller for the order | |
28 | Table/Structure Field | RC65D - EQUNR | Equipment Number | |
29 | Table/Structure Field | RC65D - EWDAN | Normal duration (from forecast) of activity | |
30 | Table/Structure Field | RC65D - EWDNE | Unit for forecast normal duration | |
31 | Table/Structure Field | RC65D - FEVOR | Production Supervisor | |
32 | Table/Structure Field | RC65D - FSAVD | Earliest scheduled start: Execution (date) | |
33 | Table/Structure Field | RC65D - FSAVZ | Earliest scheduled start: Execution (time) | |
34 | Table/Structure Field | RC65D - FSEDD | Earliest scheduled finish: Execution (date) | |
35 | Table/Structure Field | RC65D - FSEDZ | Earliest scheduled finish: Execution (time) | |
36 | Table/Structure Field | RC65D - FSELD | Earliest scheduled finish: Wait (date) | |
37 | Table/Structure Field | RC65D - FSELZ | Earliest scheduled finish: Wait (time) | |
38 | Table/Structure Field | RC65D - FSSAD | Earliest scheduled start: Teardown (date) | |
39 | Table/Structure Field | RC65D - FSSAZ | Earliest scheduled start: Teardown (time) | |
40 | Table/Structure Field | RC65D - FSSBD | Earliest scheduled start: Processing (date) | |
41 | Table/Structure Field | RC65D - FSSBZ | Earliest scheduled start: Processing (time) | |
42 | Table/Structure Field | RC65D - FSSLD | Earliest scheduled start: Wait (date) | |
43 | Table/Structure Field | RC65D - FSSLZ | Earliest scheduled start: Wait (time) | |
44 | Table/Structure Field | RC65D - FTRMI | Actual release date | |
45 | Table/Structure Field | RC65D - FTRMP | Planned release date | |
46 | Table/Structure Field | RC65D - FTRMS | Scheduled release date | |
47 | Table/Structure Field | RC65D - GAMNG | Order quantity | |
48 | Table/Structure Field | RC65D - GLTRI | Actual finish date | |
49 | Table/Structure Field | RC65D - GLTRP | Basic finish date | |
50 | Table/Structure Field | RC65D - GLTRS | Scheduled finish | |
51 | Table/Structure Field | RC65D - GMEIN | Common unit of measure for all order items | |
52 | Table/Structure Field | RC65D - GSBER | Business Area | |
53 | Table/Structure Field | RC65D - GSMNG | Total planned order quantity | |
54 | Table/Structure Field | RC65D - GSTRI | Actual start date | |
55 | Table/Structure Field | RC65D - GSTRP | Basic start date | |
56 | Table/Structure Field | RC65D - GSTRS | Scheduled start | |
57 | Table/Structure Field | RC65D - IEBD | Actual finish: Processing (date) | |
58 | Table/Structure Field | RC65D - IEBZ | Actual finish processing (time) | |
59 | Table/Structure Field | RC65D - IEDD | Actual finish: Execution (date) | |
60 | Table/Structure Field | RC65D - IEDZ | Actual finish: Execution (time) | |
61 | Table/Structure Field | RC65D - IERD | Actual finish: Setup (date) | |
62 | Table/Structure Field | RC65D - IERZ | Actual finish: Setup (time) | |
63 | Table/Structure Field | RC65D - IGMNG | Yield confirmed from order confirmation | |
64 | Table/Structure Field | RC65D - ISAD | Actual start: Teardown (date) | |
65 | Table/Structure Field | RC65D - ISAZ | Actual start: Teardown (time) | |
66 | Table/Structure Field | RC65D - ISBD | Actual start: Processing (date) | |
67 | Table/Structure Field | RC65D - ISBZ | Actual start: Processing (time) | |
68 | Table/Structure Field | RC65D - ISDD | Actual start: Execution (date) | |
69 | Table/Structure Field | RC65D - ISDZ | Actual start: Execution/setup (time) | |
70 | Table/Structure Field | RC65D - ISMNW | Actual work | |
71 | Table/Structure Field | RC65D - KABRREST | Remaining capacity requirements for op. segment "tear down" | |
72 | Table/Structure Field | RC65D - KABRSOLL | Scheduled cap. requirements for the op. segment teardown | |
73 | Table/Structure Field | RC65D - KAPAR | Capacity category | |
74 | Table/Structure Field | RC65D - KAPARTEXT | Capacity short text | |
75 | Table/Structure Field | RC65D - KBEAREST | Remaining capacity rqmts.for operation segment "Processing" | |
76 | Table/Structure Field | RC65D - KBEASOLL | Process target capacity requirements for operation segment | |
77 | Table/Structure Field | RC65D - KDAUF | Sales Order Number | |
78 | Table/Structure Field | RC65D - KDPOS | Item number in Sales Order | |
79 | Table/Structure Field | RC65D - KEINH | Unit of of measure for displaying capacity requirements | |
80 | Table/Structure Field | RC65D - KOKRS | Controlling Area | |
81 | Table/Structure Field | RC65D - KOSTL | Cost center for basic settlement | |
82 | Table/Structure Field | RC65D - KPVER | Distribution of capacity requirements (Planned/prod.order) | |
83 | Table/Structure Field | RC65D - KRUEREST | Remaining capacity rqmts. for operation segment "Setup" | |
84 | Table/Structure Field | RC65D - KRUESOLL | Scheduled cap. requirements for the op. segment "setup" | |
85 | Table/Structure Field | RC65D - KTEXT | Short text for order | |
86 | Table/Structure Field | RC65D - LIEGZ | Wait time used for scheduling | |
87 | Table/Structure Field | RC65D - LIEINH | Unit of of measure for displaying capacity requirements | |
88 | Table/Structure Field | RC65D - LIEINHA | Unit of of measure for displaying capacity requirements | |
89 | Table/Structure Field | RC65D - LIGZE | Unit of measure for wait time | |
90 | Table/Structure Field | RC65D - LMNGA | Total Yield Confirmed | |
91 | Table/Structure Field | RC65D - LOART | Wage type | |
92 | Table/Structure Field | RC65D - LOGRP | Wage group | |
93 | Table/Structure Field | RC65D - LTXA1 | Operation short text | |
94 | Table/Structure Field | RC65D - MATNR | Material Number | |
95 | Table/Structure Field | RC65D - MATTEXT | Material description | |
96 | Table/Structure Field | RC65D - MEINH | Unit of measure for activity | |
97 | Table/Structure Field | RC65D - MEINS | Base Unit of Measure | |
98 | Table/Structure Field | RC65D - MGVRG | Operation Quantity | |
99 | Table/Structure Field | RC65D - NAME1 | Name of the customer for the customer order | |
100 | Table/Structure Field | RC65D - NPRIO | Priority | |
101 | Table/Structure Field | RC65D - OFMNW | Forecasted work (actual + remaining) | |
102 | Table/Structure Field | RC65D - PAART | Type of planned order | |
103 | Table/Structure Field | RC65D - PALTR | Explosion date | |
104 | Table/Structure Field | RC65D - PEDTR | Basic date in planned order | |
105 | Table/Structure Field | RC65D - PERIOD | Planning period considered (capacity planning) | |
106 | Table/Structure Field | RC65D - PERIODINT | Field defined as in SY-TABIX | |
107 | Table/Structure Field | RC65D - PERNR | Personnel number | |
108 | Table/Structure Field | RC65D - PLGRP | Responsible planner group/department | |
109 | Table/Structure Field | RC65D - PLNAL | Group Counter | |
110 | Table/Structure Field | RC65D - PLNFL | Sequence | |
111 | Table/Structure Field | RC65D - PLNNR | Key for Task List Group | |
112 | Table/Structure Field | RC65D - PLNTY | Task List Type | |
113 | Table/Structure Field | RC65D - PLNUM | Planned order number | |
114 | Table/Structure Field | RC65D - PLSCN | Planning Scenario of Long-Term Planning | |
115 | Table/Structure Field | RC65D - PLWRK | Planning Plant | |
116 | Table/Structure Field | RC65D - POSID | Work Breakdown Structure Element (WBS Element) | |
117 | Table/Structure Field | RC65D - PROJN | Work Breakdown Structure Element (WBS Element) | |
118 | Table/Structure Field | RC65D - PRONR | Project definition | |
119 | Table/Structure Field | RC65D - PSTTR | Basic start in planned order | |
120 | Table/Structure Field | RC65D - PVERW | Task list usage | |
121 | Table/Structure Field | RC65D - PWWRK | Production plant in planned order | |
122 | Table/Structure Field | RC65D - QUALF | Suitability | |
123 | Table/Structure Field | RC65D - RASCH | Setup Type Key | |
124 | Table/Structure Field | RC65D - REDKZ | Reduction indicator for scheduling | |
125 | Table/Structure Field | RC65D - RFGRP | Setup group category | |
126 | Table/Structure Field | RC65D - RFSCH | Setup group key | |
127 | Table/Structure Field | RC65D - RSTZE | Unit of measure for setup time | |
128 | Table/Structure Field | RC65D - RUECK | Completion confirmation number for the operation | |
129 | Table/Structure Field | RC65D - RUEST | Setup time | |
130 | Table/Structure Field | RC65D - SSAVD | Latest scheduled start: Execution (date) | |
131 | Table/Structure Field | RC65D - SSAVZ | Latest scheduled start: Execution (time) | |
132 | Table/Structure Field | RC65D - SSEDD | Latest scheduled finish: Execution (date) | |
133 | Table/Structure Field | RC65D - SSEDZ | Latest scheduled finish: Execution (time) | |
134 | Table/Structure Field | RC65D - SSELD | Latest scheduled finish: Wait time (date) | |
135 | Table/Structure Field | RC65D - SSELZ | Latest scheduled finish: Wait time | |
136 | Table/Structure Field | RC65D - SSSAD | Latest scheduled start: Teardown (date) | |
137 | Table/Structure Field | RC65D - SSSAZ | Latest scheduled start: Teardown (time) | |
138 | Table/Structure Field | RC65D - SSSBD | Latest scheduled start: Processing (date) | |
139 | Table/Structure Field | RC65D - SSSBZ | Latest scheduled start: Processing (time) | |
140 | Table/Structure Field | RC65D - SSSLD | Latest scheduled start: Wait time (date) | |
141 | Table/Structure Field | RC65D - SSSLZ | Latest scheduled start: Wait time | |
142 | Table/Structure Field | RC65D - STATUS | Text of order status | |
143 | Table/Structure Field | RC65D - STATUV | Text for the status of an operation or a network activity | |
144 | Table/Structure Field | RC65D - STLNR | Bill of Material | |
145 | Table/Structure Field | RC65D - STTXT | System Status | |
146 | Table/Structure Field | RC65D - TPLNR | Functional Location | |
147 | Table/Structure Field | RC65D - TRANZ | Move time used for scheduling | |
148 | Table/Structure Field | RC65D - TRAZE | Unit of measure for move time | |
149 | Table/Structure Field | RC65D - TYPKZ | Type of object causing the load (order category) | |
150 | Table/Structure Field | RC65D - USE04 | User field: Unit for quantity fields | |
151 | Table/Structure Field | RC65D - USE05 | User field: Unit for quantity fields | |
152 | Table/Structure Field | RC65D - USE06 | User field: Unit for value fields | |
153 | Table/Structure Field | RC65D - USE07 | User field: Unit for value fields | |
154 | Table/Structure Field | RC65D - USR00 | User field with 20 characters | |
155 | Table/Structure Field | RC65D - USR01 | User field with 20 characters | |
156 | Table/Structure Field | RC65D - USR02 | User field with 10 characters | |
157 | Table/Structure Field | RC65D - USR03 | User field with 10 characters | |
158 | Table/Structure Field | RC65D - USR04 | User field for quantity (length 10.3) | |
159 | Table/Structure Field | RC65D - USR05 | User field for quantity (length 10.3) | |
160 | Table/Structure Field | RC65D - USR06 | User-defined field for values (length 10,3) | |
161 | Table/Structure Field | RC65D - USR07 | User-defined field for values (length 10,3) | |
162 | Table/Structure Field | RC65D - USR08 | User field for date | |
163 | Table/Structure Field | RC65D - USR09 | User field for date | |
164 | Table/Structure Field | RC65D - USR10 | User-defined field: Indicator for reports | |
165 | Table/Structure Field | RC65D - USR11 | User-defined field: Indicator for reports | |
166 | Table/Structure Field | RC65D - UVORN | Sub-operation | |
167 | Table/Structure Field | RC65D - VNAME | Joint venture | |
168 | Table/Structure Field | RC65D - VORNR | Operation number | |
169 | Table/Structure Field | RC65D - VRG_ARBPL | Work center of the operation | |
170 | Table/Structure Field | RC65D - VRG_ARBPLT | Work center text of sub-operation | |
171 | Table/Structure Field | RC65D - WARTZ | Queue time used for scheduling | |
172 | Table/Structure Field | RC65D - WERKS | Plant | |
173 | Table/Structure Field | RC65D - WRTZE | Unit of measure for queue time | |
174 | Table/Structure Field | SYST - TABIX | ABAP System Field: Row Index of Internal Tables |