Table/Structure Field list used by SAP ABAP Program MC64MF0C (BOM explosions for cost estimate: form routines with C)
SAP ABAP Program
MC64MF0C (BOM explosions for cost estimate: form routines with C) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | CKKVMK - AUSSS | Assembly scrap in percent | ||
| 2 | CKKVMK - ALDAT | Quantity Structure Date for Costing | ||
| 3 | CKKVMK - WERKS | Plant | ||
| 4 | CKKVMK - TVERS | Costing Version | ||
| 5 | CKKVMK - SUMLO | Planned lot size | ||
| 6 | CKKVMK - STUEAUF | Checkbox | ||
| 7 | CKKVMK - STLKN | BOM Item Node Number | ||
| 8 | CKKVMK - STLAN | BOM Usage | ||
| 9 | CKKVMK - STALT | Alternative BOM | ||
| 10 | CKKVMK - PR_VERID | Production version to be costed | ||
| 11 | CKKVMK - PR_MEINS | Valuation Unit of Measure | ||
| 12 | CKKVMK - PR_LOSGR | Planned lot size | ||
| 13 | CKKVMK - PROZESS | Process Through Which Co-Product Was Costed | ||
| 14 | CKKVMK - PRCTR | Profit Center | ||
| 15 | CKKVMK - MATNR | Material Number | ||
| 16 | CKKVMK - BEDAT | Requirements Date | ||
| 17 | CKKVMK - BIDAT | Costing Date To | ||
| 18 | CKKVMK - BWDAT | Valuation Date of a Cost Estimate | ||
| 19 | CKKVMK - CUOBJ | Object Number for Conf. Objects | ||
| 20 | CKKVMK - DISST | Low-level code | ||
| 21 | CKKVMK - INP_IN_PROC | Process Through Which Co-Product Was Costed | ||
| 22 | CKKVMK - KADAT | Date | ||
| 23 | CKKVMK - KALNR_TOP | Cost Estimate Number - Product Costing | ||
| 24 | CKKVMK - KOSGR | Costing overhead group | ||
| 25 | CKKVMK - LOSGR | Planned lot size | ||
| 26 | CKKVMK - MTART | Material type | ||
| 27 | CSTMAT - EMENG | Required quantity | ||
| 28 | CSTMAT - WERKS | Plant | ||
| 29 | CSTMAT - VERID | Production Version | ||
| 30 | CSTMAT - STLAN | BOM usage | ||
| 31 | CSTMAT - STLAL | Alternative BOM | ||
| 32 | CSTMAT - MATNR | Material Number | ||
| 33 | CSTMAT - KZKFG | Configurable Material | ||
| 34 | CSTMAT - BMEIN | Base Unit of Measure for BOM | ||
| 35 | CSTMAT - SBDKZ | Dependent requirements ind. for individual and coll. reqmts | ||
| 36 | EMARA - DISST | Low-level code | ||
| 37 | EMARA - KZKFG | Configurable Material | ||
| 38 | EMARA - MEINS | Base Unit of Measure | ||
| 39 | EMARA - MTART | Material type | ||
| 40 | EMARC - CUOBJ | Internal object number | ||
| 41 | EMARC - SBDKZ | Dependent requirements ind. for individual and coll. reqmts | ||
| 42 | EMARC1 - SBDKZ | Dependent requirements ind. for individual and coll. reqmts | ||
| 43 | EMARC3 - CUOBJ | Internal object number | ||
| 44 | KALM - WERKS | Plant | ||
| 45 | KALM - TVERS | Costing Version | ||
| 46 | KALM - BEDAT | Requirements Date | ||
| 47 | KALM - SUMLO | Planned lot size | ||
| 48 | KALM - STLAN | BOM Usage | ||
| 49 | KALM - STALT | Alternative BOM | ||
| 50 | KALM - PR_VERID | Production version to be costed | ||
| 51 | KALM - PR_MEINS | Valuation Unit of Measure | ||
| 52 | KALM - PR_LOSGR | Planned lot size | ||
| 53 | KALM - PROZESS | Process Through Which Co-Product Was Costed | ||
| 54 | KALM - PRCTR | Profit Center | ||
| 55 | KALM - MATNR | Material Number | ||
| 56 | KALM - MTART | Material type | ||
| 57 | KALM - ALDAT | Quantity Structure Date for Costing | ||
| 58 | KALM - AUSSS | Assembly scrap in percent | ||
| 59 | KALM - BIDAT | Costing Date To | ||
| 60 | KALM - BWDAT | Valuation Date of a Cost Estimate | ||
| 61 | KALM - CUOBJ | Object Number for Conf. Objects | ||
| 62 | KALM - DISST | Low-level code | ||
| 63 | KALM - KADAT | Date | ||
| 64 | KALM - KOSGR | Costing overhead group | ||
| 65 | KALM - LOSGR | Planned lot size | ||
| 66 | KEKO - CUOBJ | Object Number for Conf. Objects | ||
| 67 | MACK3 - AUSSS | Assembly scrap in percent | ||
| 68 | MACK3 - DISST | Low-level code | ||
| 69 | MACK3 - MEINS | Base Unit of Measure | ||
| 70 | MACK3 - MTART | Material type | ||
| 71 | MACK3 - PRCTR | Profit Center | ||
| 72 | MACK4 - KOSGR | Costing overhead group | ||
| 73 | MARA - DISST | Low-level code | ||
| 74 | MARA - MTART | Material type | ||
| 75 | MARA - MEINS | Base Unit of Measure | ||
| 76 | MARA - MATNR | Material Number | ||
| 77 | MARA - KZKFG | Configurable Material | ||
| 78 | MARC - CUOBJ | Internal object number | ||
| 79 | MARC - MATNR | Material Number | ||
| 80 | MARC - SBDKZ | Dependent requirements ind. for individual and coll. reqmts | ||
| 81 | MARC - WERKS | Plant | ||
| 82 | STPOX - CUOBJ | Configuration (internal object number) | ||
| 83 | STPOX - DISST | Low-level code | ||
| 84 | STPOX - IDNRK | BOM Component | ||
| 85 | STPOX - KZKFG | Configurable Material | ||
| 86 | STPOX - MMEIN | Base Unit of Measure | ||
| 87 | STPOX - MNGLG | Calculated Component Quantity in Base Unit of Measure | ||
| 88 | STPOX - MTART | Material type | ||
| 89 | STPOX - SBDKZ | Dependent requirements ind. for individual and coll. reqmts | ||
| 90 | STPOX - WERKS | Plant | ||
| 91 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables |