Table/Structure Field list used by SAP ABAP Program LSPC0M01 (Include LSPC0M01)
SAP ABAP Program
LSPC0M01 (Include LSPC0M01) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
ASP00 - PAUTO_ON | Repeated Automatic Dispatching Active | |
2 | ![]() |
ASP00 - PERIK | Planning Periods According to Planning Calendar | |
3 | ![]() |
ASP00 - PERIS | Planning Periods in Shifts | |
4 | ![]() |
ASP00 - PERIT | Planning Periods in Days | |
5 | ![]() |
ASP00 - PER_CALC | Align Horizon Calculation with Current Date | |
6 | ![]() |
ASP00 - PER_FIRM | Number of Additional Fixed Planning Periods | |
7 | ![]() |
ASP00 - PPCAL | Planning Calendar for Sequencing | |
8 | ![]() |
ASP00 - WERKS | Plant | |
9 | ![]() |
ASP00 - DURAT | Planning Period: Number of Days | |
10 | ![]() |
SCREEN - GROUP1 | SCREEN-GROUP1 | |
11 | ![]() |
SCREEN - INPUT | SCREEN-INPUT | |
12 | ![]() |
SYST - UCOMM | ABAP System Field: PAI-Triggering Function Code | |
13 | ![]() |
V_TSPP0 - PAUTO | Repeated automatic dispatching | |
14 | ![]() |
V_TSPP0 - WERKS | Plant | |
15 | ![]() |
V_TSPP0 - PPSCAL | Planning Calendar for Sequencing | |
16 | ![]() |
V_TSPP0 - PPERI | Planning period | |
17 | ![]() |
V_TSPP0 - PER_CALC | Align Horizon Calculation with Current Date | |
18 | ![]() |
V_TSPP0 - PERI_FIRM | Number of Additional Fixed Planning Periods | |
19 | ![]() |
V_TSPP0 - PDURA | Dispatching period in days | |
20 | ![]() |
V_TSPP1 - CLOAD | Production Smoothing: Planned Maximum Capacity Utilization | |
21 | ![]() |
V_TSPP1_HEIJ - ALGOR | Process | |
22 | ![]() |
V_TSPP1_HEIJ - CLOAD | Production Smoothing: Planned Maximum Capacity Utilization | |
23 | ![]() |
V_TSPP1_HEIJ - DISTR | Production Smoothing: Equally Distributed Dispatching | |
24 | ![]() |
V_TSPP1_HEIJ - SPGRP | Production Smoothing: Dispatch Same Materials Together |