Table/Structure Field list used by SAP ABAP Program LPGS1F07 (Material Components)
SAP ABAP Program
LPGS1F07 (Material Components) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
CIF_ACTREL - ACKEY_EX_P | Activity Number | |
2 | ![]() |
CIF_ACTREL - ACKEY_EX_S | Activity Number | |
3 | ![]() |
CIF_ACTREL - OPKEY_EX_S | Operation Number | |
4 | ![]() |
CIF_ACTREL - PLKEY_EX_P | External Plan Key, as of APO Release 3.0 | |
5 | ![]() |
CIF_ACTREL - PLKEY_EX_S | External Plan Key, as of APO Release 3.0 | |
6 | ![]() |
CIF_APOORD - METHOD | Method to be Executed During the Transfer of an Object | |
7 | ![]() |
CIF_APOORR - METHOD | Method to be Executed During the Transfer of an Object | |
8 | ![]() |
CIF_COMP - AKTNR_EX | Activity Number | |
9 | ![]() |
CIF_COMP - IOIND | Input/Output Indicator | |
10 | ![]() |
CIF_COMP - IOOFF | Chronological Offset for Material Bonus/Penalty Quantity | |
11 | ![]() |
CIF_COMP - IOOFF_N | Chronological Offset for Mat. Bonus or Penalty(with Decimal) | |
12 | ![]() |
CIF_COMP - IS_MASTER | Indicator: Leading Material in Order | |
13 | ![]() |
CIF_COMP - LOGCOMP | Logical Component | |
14 | ![]() |
CIF_COMP - MATCO | Type of Material Consumption During Activity | |
15 | ![]() |
CIF_COMP - METHOD | Method to be Executed During the Transfer of an Object | |
16 | ![]() |
CIF_COMP - OFFCO | I/O Offset - Activity Relationship | |
17 | ![]() |
CIF_COMP - OFFUNIT | Unit of Chronological Offset of Matl Bonus/Penalty Quantity | |
18 | ![]() |
CIF_COMP - PLANKEY_EX | External Plan Key, as of APO Release 3.0 | |
19 | ![]() |
CIF_COMP - VORNR_EX | Operation Number | |
20 | ![]() |
CIF_COMPAL - AKTNR_EX | Activity Number | |
21 | ![]() |
CIF_COMPAL - DATEF | Runtime Start | |
22 | ![]() |
CIF_COMPAL - DATET | Runtime End | |
23 | ![]() |
CIF_COMPAL - LOGCOMP | Logical Component | |
24 | ![]() |
CIF_COMPAL - MATNR_ALT | Material Number | |
25 | ![]() |
CIF_COMPAL - METHOD | Method to be Executed During the Transfer of an Object | |
26 | ![]() |
CIF_COMPAL - PAR1 | Parameter for Material Consumption (Variable) | |
27 | ![]() |
CIF_COMPAL - PAR2 | Parameter for Material Consumption (Fix) | |
28 | ![]() |
CIF_COMPAL - PLANKEY_EX | External Plan Key, as of APO Release 3.0 | |
29 | ![]() |
CIF_COMPAL - SUBLOC | Sublocation | |
30 | ![]() |
CIF_COMPAL - VORNR_EX | Operation Number | |
31 | ![]() |
CIF_COMPAZ - AKTNR_EX | Activity Number | |
32 | ![]() |
CIF_COMPAZ - LOGCOMP | Logical Component | |
33 | ![]() |
CIF_COMPAZ - PLANKEY_EX | External Plan Key, as of APO Release 3.0 | |
34 | ![]() |
CIF_COMPAZ - VORNR_EX | Operation Number | |
35 | ![]() |
CIF_IMODK - LOGSYS | Logical system | |
36 | ![]() |
CIF_PLNAC - ACTTYPE | Operation Segment (e.g. Setting Up, Processing) | |
37 | ![]() |
CIF_PLNAC - AKTNR_EX | Activity Number | |
38 | ![]() |
CIF_PLNAC - METHOD | Method to be Executed During the Transfer of an Object | |
39 | ![]() |
CIF_PLNAC - PLANKEY_EX | External Plan Key, as of APO Release 3.0 | |
40 | ![]() |
CIF_PLNAC - VORNR_EX | Operation Number | |
41 | ![]() |
CIF_PLNOPR - PLANKEY_EX | External Plan Key, as of APO Release 3.0 | |
42 | ![]() |
CIF_PLNOPR - SVORNR | Operation Number | |
43 | ![]() |
CIF_PLNOPR - VORNR_EX | Operation Number | |
44 | ![]() |
CIF_PLNOPR - VRGTYP | Operation Type | |
45 | ![]() |
COPLPO - ARBID | Object ID | |
46 | ![]() |
COPLPO - PLNKN | Number of the task list node | |
47 | ![]() |
COPLPO - PLNNR | Key for Task List Group | |
48 | ![]() |
COPLPO - PLNTY | Task List Type | |
49 | ![]() |
COPLPO - REFKN | Number of the task list node | |
50 | ![]() |
COPLPO - SUMNR | Node number of the superior operation | |
51 | ![]() |
COPLPO - VORNR | Operation/Activity Number | |
52 | ![]() |
COPLPO - ZAEHL | Internal counter | |
53 | ![]() |
CSTMAT - BMENG | Base quantity | |
54 | ![]() |
MKAL - ALORT | Receiving storage location for repetitive manufacturing | |
55 | ![]() |
MKAL - ELPRO | Proposed issue storage location for components | |
56 | ![]() |
MKAL - VERTO | Distribution key for quantity produced | |
57 | ![]() |
PLAS - PLNAL | Group Counter | |
58 | ![]() |
PLAS - PLNFL | Sequence | |
59 | ![]() |
PLAS - PLNKN | Number of the task list node | |
60 | ![]() |
PLAS - PLNNR | Key for Task List Group | |
61 | ![]() |
PLAS - PLNTY | Task List Type | |
62 | ![]() |
PLMZ - IMENG | Component Quantity | |
63 | ![]() |
PLMZ - PLNKN | Task list node number for operation | |
64 | ![]() |
PLMZ - PLNNR | Key for Task List Group | |
65 | ![]() |
PLMZ - PLNTY | Task List Type | |
66 | ![]() |
PLMZ - STLAL | Alternative BOM | |
67 | ![]() |
PLMZ - STLKN | Node Number | |
68 | ![]() |
PLMZ - STLNR | Bill of Material | |
69 | ![]() |
PLMZ - STLST | Order level | |
70 | ![]() |
PLMZ - STLTY | BOM Category | |
71 | ![]() |
PLMZ - STLWG | Order path | |
72 | ![]() |
PLPO - ARBID | Object ID | |
73 | ![]() |
PLPO - PLNKN | Number of the task list node | |
74 | ![]() |
PLPO - PLNNR | Key for Task List Group | |
75 | ![]() |
PLPO - PLNTY | Task List Type | |
76 | ![]() |
PLPO - SUMNR | Node number of the superior operation | |
77 | ![]() |
PLPO - VORNR | Operation/Activity Number | |
78 | ![]() |
PLPO - ZAEHL | Internal counter | |
79 | ![]() |
PPM_KEY - ADATU | Date for beginning of validity | |
80 | ![]() |
PPM_KEY - ALNAL | Group Counter | |
81 | ![]() |
PPM_KEY - BDATU | Date validity ends | |
82 | ![]() |
PPM_KEY - MATNR | Material Number | |
83 | ![]() |
PPM_KEY - PLNNR | Key for Task List Group | |
84 | ![]() |
PPM_KEY - PLNTY | Task List Type | |
85 | ![]() |
PPM_KEY - PPM_TYP | Type of PPM or PDS (for Example, In-House Prod., Subcontr.) | |
86 | ![]() |
PPM_KEY - VERID | Production Version | |
87 | ![]() |
PPM_KEY - WERKS | Plant | |
88 | ![]() |
PRE01 - MATNR | Material Number | |
89 | ![]() |
PRE01 - WERKS | Plant | |
90 | ![]() |
STPO - BEIKZ | Material Provision Indicators | |
91 | ![]() |
STPO - DATUV | Valid-From Date | |
92 | ![]() |
STPO - IDNRK | BOM Component | |
93 | ![]() |
STPO - SANFE | Indicator: Item Relevant to Production | |
94 | ![]() |
STPO - STLKN | BOM Item Node Number | |
95 | ![]() |
STPO - STLNR | Bill of Material | |
96 | ![]() |
STPO - STLTY | BOM Category | |
97 | ![]() |
STPO - STPOZ | Internal counter | |
98 | ![]() |
STPO - STVKN | Inherited Node Number of BOM Item | |
99 | ![]() |
STPOB - BEIKZ | Material Provision Indicators | |
100 | ![]() |
STPOB - DATUB | Valid-to date | |
101 | ![]() |
STPOB - DATUV | Valid-From Date | |
102 | ![]() |
STPOB - IDNRK | BOM Component | |
103 | ![]() |
STPOB - SANFE | Indicator: Item Relevant to Production | |
104 | ![]() |
STPOB - STLKN | BOM Item Node Number | |
105 | ![]() |
STPOB - STLNR | Bill of Material | |
106 | ![]() |
STPOB - STLTY | BOM Category | |
107 | ![]() |
STPOB - STPOZ | Internal counter | |
108 | ![]() |
STPOB - STVKN | Inherited Node Number of BOM Item | |
109 | ![]() |
STPOS - DATUB | Valid-to date | |
110 | ![]() |
STPOX - ALPOS | Indicator: Alternative Item | |
111 | ![]() |
STPOX - ALPST | Alternative Item: Strategy | |
112 | ![]() |
STPOX - AUFST | Order level | |
113 | ![]() |
STPOX - AUFWG | Order path | |
114 | ![]() |
STPOX - BEIKZ | Material Provision Indicators | |
115 | ![]() |
STPOX - DATUB | Valid-to date | |
116 | ![]() |
STPOX - DATUV | Valid-from/to date | |
117 | ![]() |
STPOX - DUMPS | Phantom item indicator | |
118 | ![]() |
STPOX - EWAHR | Usage Probability in % (Alternative Item) | |
119 | ![]() |
STPOX - FMENG | Fixed Quantity | |
120 | ![]() |
STPOX - IDNRK | BOM Component | |
121 | ![]() |
STPOX - KZKUP | Indicator: Co-Product | |
122 | ![]() |
STPOX - LGORT | Storage location | |
123 | ![]() |
STPOX - LGPRO | Issue storage location | |
124 | ![]() |
STPOX - MENGE | Component Quantity | |
125 | ![]() |
STPOX - MNGLG | Calculated Component Quantity in Base Unit of Measure | |
126 | ![]() |
STPOX - POSTP | Item category | |
127 | ![]() |
STPOX - SANFE | Indicator: Item Relevant to Production | |
128 | ![]() |
STPOX - STLAL | Alternative BOM | |
129 | ![]() |
STPOX - STLKN | BOM Item Node Number | |
130 | ![]() |
STPOX - STLNR | Bill of Material | |
131 | ![]() |
STPOX - STLTY | BOM Category | |
132 | ![]() |
STPOX - STPOZ | Internal counter | |
133 | ![]() |
STPOX - STUFE | Level (in Multi-Level BOM Explosions) | |
134 | ![]() |
STPOX - STVKN | Inherited Node Number of BOM Item | |
135 | ![]() |
STPOX - VERTI | Distribution key for component consumption | |
136 | ![]() |
STPOX - VWEGX | Path (for Multi-Level BOM Explosions) | |
137 | ![]() |
STPOX - WEGXX | Path (Predecessor) | |
138 | ![]() |
SYST - DATUM | ABAP System Field: Current Date of Application Server | |
139 | ![]() |
SYST - SAPRL | ABAP System Field: SAP System Release | |
140 | ![]() |
SYST - TABIX | ABAP System Field: Row Index of Internal Tables | |
141 | ![]() |
SYST - ZONLO | ABAP System Field: Time Zone of Current User | |
142 | ![]() |
T438M - PLSEL | Issue Storage Location Selection |