1 | ![]() |
AAFVC - ARBID | Object ID of the resource | |
2 | ![]() |
AAFVC - VORNR | Operation/Activity Number | |
3 | ![]() |
AFPO - AMEIN | Unit of measure for in-house production | |
4 | ![]() |
AFPO - AUFNR | Order Number | |
5 | ![]() |
AFPO - CHARG | Batch Number | |
6 | ![]() |
AFPO - LTRMI | Actual delivery/finish date | |
7 | ![]() |
AFPO - MATNR | Material Number for Order | |
8 | ![]() |
AFPO - POSNR | Order item number | |
9 | ![]() |
AFPO - UMREN | Denominator for conversion to base units of measure | |
10 | ![]() |
AFPO - UMREZ | Numerator for Conversion to Base Units of Measure | |
11 | ![]() |
AFPO - WEMNG | Quantity of goods received for the order item | |
12 | ![]() |
AFPO - WEWRT | Wareneingangswert in Hauswährung | |
13 | ![]() |
AFPOB - AMEIN | Unit of measure for in-house production | |
14 | ![]() |
AFPOB - AUFNR | Order Number | |
15 | ![]() |
AFPOB - CHARG | Batch Number | |
16 | ![]() |
AFPOB - LTRMI | Actual delivery/finish date | |
17 | ![]() |
AFPOB - MATNR | Material Number for Order | |
18 | ![]() |
AFPOB - POSNR | Order item number | |
19 | ![]() |
AFPOB - UMREN | Denominator for conversion to base units of measure | |
20 | ![]() |
AFPOB - UMREZ | Numerator for Conversion to Base Units of Measure | |
21 | ![]() |
AFPOB - WEMNG | Quantity of goods received for the order item | |
22 | ![]() |
AFPOB - WEWRT | Value of goods received in local currency | |
23 | ![]() |
AFPO_INC - AMEIN | Unit of measure for in-house production | |
24 | ![]() |
AFPO_INC - CHARG | Batch Number | |
25 | ![]() |
AFPO_INC - LTRMI | Actual delivery/finish date | |
26 | ![]() |
AFPO_INC - MATNR | Material Number for Order | |
27 | ![]() |
AFPO_INC - UMREN | Denominator for conversion to base units of measure | |
28 | ![]() |
AFPO_INC - UMREZ | Numerator for Conversion to Base Units of Measure | |
29 | ![]() |
AFPO_INC - WEMNG | Quantity of goods received for the order item | |
30 | ![]() |
AFPO_INC - WEWRT | Wareneingangswert in Hauswährung | |
31 | ![]() |
AFRU - ARBID | Object ID | |
32 | ![]() |
AFRU - BUDAT | Posting date | |
33 | ![]() |
AFRU - GRUND | Reason for Variance | |
34 | ![]() |
AFRU - LOART | Wage type | |
35 | ![]() |
AFRU - LOGRP | Wage group | |
36 | ![]() |
AFRU - PERNR | Personnel number | |
37 | ![]() |
AFRU - QUALF | Suitability | |
38 | ![]() |
AFRU - RMZHL | Confirmation counter | |
39 | ![]() |
AFRU - RUECK | Completion confirmation number for the operation | |
40 | ![]() |
AFRUD - ARBID | Object ID | |
41 | ![]() |
AFRUD - BUDAT | Posting date | |
42 | ![]() |
AFRUD - GRUND | Reason for Variance | |
43 | ![]() |
AFRUD - LOART | Wage type | |
44 | ![]() |
AFRUD - LOGRP | Wage group | |
45 | ![]() |
AFRUD - PERNR | Personnel number | |
46 | ![]() |
AFRUD - QUALF | Suitability | |
47 | ![]() |
AFVC - ARBID | Object ID of the resource | |
48 | ![]() |
AFVC - VORNR | Operation/Activity Number | |
49 | ![]() |
AFVGB - ABRUE | Teardown | |
50 | ![]() |
AFVGB - APLZL | General counter for order | |
51 | ![]() |
AFVGB - ARBID | Object ID of the resource | |
52 | ![]() |
AFVGB - ARBII | Actual operating resources object identification | |
53 | ![]() |
AFVGB - ARUZE | Unit of measure for teardown | |
54 | ![]() |
AFVGB - AUFPL | Routing number of operations in the order | |
55 | ![]() |
AFVGB - BEARZ | Processing time | |
56 | ![]() |
AFVGB - BEAZE | Unit of measure for processing time | |
57 | ![]() |
AFVGB - IEAVD | Actual finish of operation (date) | |
58 | ![]() |
AFVGB - IEBD | Actual finish: Processing (date) | |
59 | ![]() |
AFVGB - IEBZ | Actual processing finish (time) | |
60 | ![]() |
AFVGB - IEDD | Actual finish: Execution (date) | |
61 | ![]() |
AFVGB - IEDZ | Actual finish: Execution (time) | |
62 | ![]() |
AFVGB - IERD | Actual finish: Setup (date) | |
63 | ![]() |
AFVGB - IERZ | Actual finish: Setup (time) | |
64 | ![]() |
AFVGB - ISAD | Actual start: Teardown (date) | |
65 | ![]() |
AFVGB - ISAVD | Actual operation start (date) | |
66 | ![]() |
AFVGB - ISAZ | Actual start: Teardown (time) | |
67 | ![]() |
AFVGB - ISBD | Actual start: Processing (date) | |
68 | ![]() |
AFVGB - ISBZ | Actual start: Processing (time) | |
69 | ![]() |
AFVGB - ISDD | Actual start: Execution (date) | |
70 | ![]() |
AFVGB - ISDZ | Actual start: Execution/setup (time) | |
71 | ![]() |
AFVGB - LIEGZ | Wait time used for scheduling | |
72 | ![]() |
AFVGB - LIGZE | Unit of measure for wait time | |
73 | ![]() |
AFVGB - LMNGA | Total Yield Confirmed | |
74 | ![]() |
AFVGB - MANDT | Client | |
75 | ![]() |
AFVGB - OBJNR | Object number | |
76 | ![]() |
AFVGB - PLNFL | Sequence | |
77 | ![]() |
AFVGB - RMZHL | Confirmation counter | |
78 | ![]() |
AFVGB - RSTZE | Unit of measure for setup time | |
79 | ![]() |
AFVGB - RUECK | Completion confirmation number for the operation | |
80 | ![]() |
AFVGB - RUEST | Setup time | |
81 | ![]() |
AFVGB - SEQTYPE | Sequence category | |
82 | ![]() |
AFVGB - SSAVZ | Latest scheduled start: Execution (time) | |
83 | ![]() |
AFVGB - SSEDD | Latest scheduled finish: Execution (date) | |
84 | ![]() |
AFVGB - SSEDZ | Latest scheduled finish: Execution (time) | |
85 | ![]() |
AFVGB - SUMNR | Node number of the superior operation | |
86 | ![]() |
AFVGB - UMREN | Denominator for converting rtg and op units of measure | |
87 | ![]() |
AFVGB - UMREZ | Numerator for converting task list and oper. un. of measure | |
88 | ![]() |
AFVGB - VBKZ | Update indicator | |
89 | ![]() |
AFVGB - VORNR | Operation/Activity Number | |
90 | ![]() |
AFVGB - WERKS | Plant | |
91 | ![]() |
AFVGI - ARBID | Object ID of the resource | |
92 | ![]() |
AFVGI - ARBII | Actual operating resources object identification | |
93 | ![]() |
AFVGI - OBJNR | Object number | |
94 | ![]() |
AFVGI - PLNFL | Sequence | |
95 | ![]() |
AFVGI - RMZHL | Confirmation counter | |
96 | ![]() |
AFVGI - RUECK | Completion confirmation number for the operation | |
97 | ![]() |
AFVGI - SUMNR | Node number of the superior operation | |
98 | ![]() |
AFVGI - VORNR | Operation/Activity Number | |
99 | ![]() |
AFVGI - WERKS | Plant | |
100 | ![]() |
AFVKI - APLZL | General counter for order | |
101 | ![]() |
AFVKI - AUFPL | Routing number of operations in the order | |
102 | ![]() |
AFVKI - MANDT | Client | |
103 | ![]() |
AFVV - APLZL | General counter for order | |
104 | ![]() |
AFVV - AUFPL | Routing number of operations in the order | |
105 | ![]() |
AFVV - MANDT | Client | |
106 | ![]() |
AFVVI - ABRUE | Teardown | |
107 | ![]() |
AFVVI - ARUZE | Unit of measure for teardown | |
108 | ![]() |
AFVVI - BEARZ | Processing time | |
109 | ![]() |
AFVVI - BEAZE | Unit of measure for processing time | |
110 | ![]() |
AFVVI - IEAVD | Actual finish of operation (date) | |
111 | ![]() |
AFVVI - IEBD | Actual finish: Processing (date) | |
112 | ![]() |
AFVVI - IEBZ | Actual processing finish (time) | |
113 | ![]() |
AFVVI - IEDD | Actual finish: Execution (date) | |
114 | ![]() |
AFVVI - IEDZ | Actual finish: Execution (time) | |
115 | ![]() |
AFVVI - IERD | Actual finish: Setup (date) | |
116 | ![]() |
AFVVI - IERZ | Actual finish: Setup (time) | |
117 | ![]() |
AFVVI - ISAD | Actual start: Teardown (date) | |
118 | ![]() |
AFVVI - ISAVD | Actual operation start (date) | |
119 | ![]() |
AFVVI - ISAZ | Actual start: Teardown (time) | |
120 | ![]() |
AFVVI - ISBD | Actual start: Processing (date) | |
121 | ![]() |
AFVVI - ISBZ | Actual start: Processing (time) | |
122 | ![]() |
AFVVI - ISDD | Actual start: Execution (date) | |
123 | ![]() |
AFVVI - ISDZ | Actual start: Execution/setup (time) | |
124 | ![]() |
AFVVI - LIEGZ | Wait time used for scheduling | |
125 | ![]() |
AFVVI - LIGZE | Unit of measure for wait time | |
126 | ![]() |
AFVVI - LMNGA | Total Yield Confirmed | |
127 | ![]() |
AFVVI - RSTZE | Unit of measure for setup time | |
128 | ![]() |
AFVVI - RUEST | Setup time | |
129 | ![]() |
AFVVI - SSAVZ | Latest scheduled start: Execution (time) | |
130 | ![]() |
AFVVI - SSEDD | Latest scheduled finish: Execution (date) | |
131 | ![]() |
AFVVI - SSEDZ | Latest scheduled finish: Execution (time) | |
132 | ![]() |
AFVVI - UMREN | Denominator for converting rtg and op units of measure | |
133 | ![]() |
AFVVI - UMREZ | Numerator for converting task list and oper. un. of measure | |
134 | ![]() |
CAUFVD - GAMNG | Total order quantity | |
135 | ![]() |
CAUFVDB - AUFPL | Routing number of operations in the order | |
136 | ![]() |
CAUFVDB - IASMG | Scrap confirmed for order | |
137 | ![]() |
CAUFVDB - KOKRS | Controlling Area | |
138 | ![]() |
CAUFVDB - MANDT | Client | |
139 | ![]() |
CAUFVDB - OBJNR | Object number | |
140 | ![]() |
CAUFVDB - PLNME | Task list unit of measure | |
141 | ![]() |
CAUFVDB - RMZHL | Internal counter | |
142 | ![]() |
CAUFVDB - RUECK | Completion confirmation number for the operation | |
143 | ![]() |
CAUFVTAB - AUFPL | Routing number of operations in the order | |
144 | ![]() |
CAUFVTAB - GAMNG | Total order quantity | |
145 | ![]() |
CAUFVTAB - IASMG | Scrap confirmed for order | |
146 | ![]() |
CAUFVTAB - KOKRS | Controlling Area | |
147 | ![]() |
CAUFVTAB - MANDT | Client | |
148 | ![]() |
CAUFVTAB - OBJNR | Object number | |
149 | ![]() |
CAUFVTAB - PLNME | Task list unit of measure | |
150 | ![]() |
CAUFVTAB - RMZHL | Internal counter | |
151 | ![]() |
CAUFVTAB - RUECK | Completion confirmation number for the operation | |
152 | ![]() |
CKKALKPOS - ARBID | Object ID of the resource | |
153 | ![]() |
CKKALKPOS - KOSTL | Cost Center | |
154 | ![]() |
CKKALKPOS - KSTAR | Cost Element | |
155 | ![]() |
CKKALKPOS - LSTAR | Activity Type | |
156 | ![]() |
CKKALKPOS - MATNR | Material Number | |
157 | ![]() |
CKKALKPOS - MENGE | Quantity | |
158 | ![]() |
CKKALKPOS - TYPPS | Item Category | |
159 | ![]() |
CKKALKPOS - VORNR | Operation/Activity Number | |
160 | ![]() |
CKKALKPOS - WERKS | Plant | |
161 | ![]() |
CKKALKPOS - WERTN | Value in Controlling Area Currency | |
162 | ![]() |
CKKALKPOS - WRTFW_KPF | Value in Object Currency | |
163 | ![]() |
CKKALKPOS - WRTFW_POS | Value in Transaction Currency | |
164 | ![]() |
CKKALKPOS - WRTFX | Fixed Value in Controlling Area Currency | |
165 | ![]() |
CKKALKTAB - ARBID | Object ID of the resource | |
166 | ![]() |
CKKALKTAB - KOSTL | Cost Center | |
167 | ![]() |
CKKALKTAB - KSTAR | Cost Element | |
168 | ![]() |
CKKALKTAB - LSTAR | Activity Type | |
169 | ![]() |
CKKALKTAB - MATNR | Material Number | |
170 | ![]() |
CKKALKTAB - MENGE | Quantity | |
171 | ![]() |
CKKALKTAB - STZHL | Counter for Reversed Confirmation Record | |
172 | ![]() |
CKKALKTAB - TYPPS | Item Category | |
173 | ![]() |
CKKALKTAB - VORNR | Operation/Activity Number | |
174 | ![]() |
CKKALKTAB - WERKS | Plant | |
175 | ![]() |
CKKALKTAB - WERTN | Value in Controlling Area Currency | |
176 | ![]() |
CKKALKTAB - WRTFW_KPF | Value in Object Currency | |
177 | ![]() |
CKKALKTAB - WRTFW_POS | Value in Transaction Currency | |
178 | ![]() |
CKKALKTAB - WRTFX | Fixed Value in Controlling Area Currency | |
179 | ![]() |
CODOCINF - SEQTYPE | Sequence category | |
180 | ![]() |
COUPDINF - VBKZ | Update indicator | |
181 | ![]() |
CRHD - KAPID | Capacity ID | |
182 | ![]() |
CRHD - VERAN | Person responsible for the work center | |
183 | ![]() |
CYBEDINF - KAPAR | Capacity category | |
184 | ![]() |
CYSEL_OBJ - INDEXAKT | Index to object | |
185 | ![]() |
EMARA - MEINS | Base Unit of Measure | |
186 | ![]() |
JEST - INACT | Indicator: Status Is Inactive | |
187 | ![]() |
JEST - MANDT | Client | |
188 | ![]() |
JEST - OBJNR | Object number | |
189 | ![]() |
JEST - STAT | Object status | |
190 | ![]() |
KAKO - KALID | Factory calendar ID | |
191 | ![]() |
KAKO - NGRAD | Capacity utilization rate (percent) | |
192 | ![]() |
KAKO - PLANR | Capacity planner group | |
193 | ![]() |
KBED - APLZL | General counter for order | |
194 | ![]() |
KBED - AUFPL | Routing number of operations in the order | |
195 | ![]() |
KBED - KABRSOLL | Scheduled cap. requirements for the op. segment teardown | |
196 | ![]() |
KBED - KAPID | Capacity ID | |
197 | ![]() |
KBED - KBEASOLL | Process target capacity requirements for operation segment | |
198 | ![]() |
KBED - KRUESOLL | Scheduled cap. requirements for the op. segment "setup" | |
199 | ![]() |
KBEDD - APLZL | General counter for order | |
200 | ![]() |
KBEDD - AUFPL | Routing number of operations in the order | |
201 | ![]() |
KBEDD - KABRSOLL | Scheduled cap. requirements for the op. segment teardown | |
202 | ![]() |
KBEDD - KAPAR | Capacity category | |
203 | ![]() |
KBEDD - KAPID | Capacity ID | |
204 | ![]() |
KBEDD - KBEASOLL | Process target capacity requirements for operation segment | |
205 | ![]() |
KBEDD - KRUESOLL | Scheduled cap. requirements for the op. segment "setup" | |
206 | ![]() |
KBEDI - APLZL | General counter for order | |
207 | ![]() |
KBEDI - AUFPL | Routing number of operations in the order | |
208 | ![]() |
KBEDI - KABRSOLL | Scheduled cap. requirements for the op. segment teardown | |
209 | ![]() |
KBEDI - KAPID | Capacity ID | |
210 | ![]() |
KBEDI - KBEASOLL | Process target capacity requirements for operation segment | |
211 | ![]() |
KBEDI - KRUESOLL | Scheduled cap. requirements for the op. segment "setup" | |
212 | ![]() |
MARA - MEINS | Base Unit of Measure | |
213 | ![]() |
MCAFKO - AMEIN | Unit of measure for in-house production | |
214 | ![]() |
MCAFKO - AUFNR | Order Number | |
215 | ![]() |
MCAFKO - ERDAT | Created on | |
216 | ![]() |
MCAFKO - FA_FREI | Order has status RELEASED | |
217 | ![]() |
MCAFKO - FA_GLFT | Order has status DELIVERED | |
218 | ![]() |
MCAFKO - FA_RUECK | Order has status CONFIRMED | |
219 | ![]() |
MCAFKO - FA_TGLI | Order has Status PDLV | |
220 | ![]() |
MCAFKO - FA_TRUEC | Order has status PARTIALLY CONFIRMED | |
221 | ![]() |
MCAFKO - FTRMP | Planned release date | |
222 | ![]() |
MCAFKO - FTRMS | Scheduled release date | |
223 | ![]() |
MCAFKO - GAMNG | Total order quantity | |
224 | ![]() |
MCAFKO - GASMG | Total Scrap Quantity in the Order | |
225 | ![]() |
MCAFKO - GETRI | Confirmed Order Finish Date | |
226 | ![]() |
MCAFKO - GEUZI | Confirmed order finish (time) | |
227 | ![]() |
MCAFKO - GLTRP | Basic finish date | |
228 | ![]() |
MCAFKO - GLTRS | Scheduled finish | |
229 | ![]() |
MCAFKO - GLUZS | Scheduled finish time | |
230 | ![]() |
MCAFKO - GSTRI | Actual start date | |
231 | ![]() |
MCAFKO - GSTRP | Basic start date | |
232 | ![]() |
MCAFKO - GSTRS | Scheduled start | |
233 | ![]() |
MCAFKO - GSUZI | Actual start time | |
234 | ![]() |
MCAFKO - GSUZS | Scheduled Start (Time) | |
235 | ![]() |
MCAFKO - VDATU | Date of update for statistics updating | |
236 | ![]() |
MCAFKOB - AMEIN | Unit of measure for in-house production | |
237 | ![]() |
MCAFKOB - AUFNR | Order Number | |
238 | ![]() |
MCAFKOB - ERDAT | Created on | |
239 | ![]() |
MCAFKOB - FA_FREI | Order has status RELEASED | |
240 | ![]() |
MCAFKOB - FA_GLFT | Order has status DELIVERED | |
241 | ![]() |
MCAFKOB - FA_RUECK | Order has status CONFIRMED | |
242 | ![]() |
MCAFKOB - FA_TGLI | Order has Status PDLV | |
243 | ![]() |
MCAFKOB - FA_TRUEC | Order has status PARTIALLY CONFIRMED | |
244 | ![]() |
MCAFKOB - FTRMP | Planned release date | |
245 | ![]() |
MCAFKOB - FTRMS | Scheduled release date | |
246 | ![]() |
MCAFKOB - GAMNG | Total order quantity | |
247 | ![]() |
MCAFKOB - GASMG | Total Scrap Quantity in the Order | |
248 | ![]() |
MCAFKOB - GETRI | Confirmed Order Finish Date | |
249 | ![]() |
MCAFKOB - GEUZI | Confirmed order finish (time) | |
250 | ![]() |
MCAFKOB - GLTRP | Basic finish date | |
251 | ![]() |
MCAFKOB - GLTRS | Scheduled finish | |
252 | ![]() |
MCAFKOB - GLUZS | Scheduled finish time | |
253 | ![]() |
MCAFKOB - GSTRI | Actual start date | |
254 | ![]() |
MCAFKOB - GSTRP | Basic start date | |
255 | ![]() |
MCAFKOB - GSTRS | Scheduled start | |
256 | ![]() |
MCAFKOB - GSUZI | Actual start time | |
257 | ![]() |
MCAFKOB - GSUZS | Scheduled Start (Time) | |
258 | ![]() |
MCAFKOB - SUPKZ | Statistics update indicator (post in/post out) | |
259 | ![]() |
MCAFKOB - VDATU | Date of update for statistics updating | |
260 | ![]() |
MCAFKOV - VRSIO | Version number in the information structure | |
261 | ![]() |
MCAFPO - AMEIN | Unit of measure for in-house production | |
262 | ![]() |
MCAFPO - AUFNR | Order Number | |
263 | ![]() |
MCAFPO - BUDAT | Posting date delivery/finish date, actual | |
264 | ![]() |
MCAFPO - DFZEH | Unit of measure for execution time | |
265 | ![]() |
MCAFPO - DFZEXEH | Unit for execution time (exact) | |
266 | ![]() |
MCAFPO - ETRMP | Opening date of the planned order | |
267 | ![]() |
MCAFPO - IAMNG | Actual scrap quantity from an order item | |
268 | ![]() |
MCAFPO - I_DFZ | Actual execution time | |
269 | ![]() |
MCAFPO - I_DFZ_EX | Actual execution time (exact) | |
270 | ![]() |
MCAFPO - I_DLZ_EX | Actual lead time (exact) | |
271 | ![]() |
MCAFPO - KEINH | Unit of of measure for displaying capacity requirements | |
272 | ![]() |
MCAFPO - KSUMS | Total target capacity requirements | |
273 | ![]() |
MCAFPO - LTRMI | Actual delivery/finish date | |
274 | ![]() |
MCAFPO - LTRMP | Delivery date from planned order | |
275 | ![]() |
MCAFPO - MATNR | Material Number | |
276 | ![]() |
MCAFPO - MCPAMNG | Fixed production scrap qty in unit of in-house production | |
277 | ![]() |
MCAFPO - MCPGMNG | Total planned order quantity in unit of in-house production | |
278 | ![]() |
MCAFPO - MEINS | Base Unit of Measure | |
279 | ![]() |
MCAFPO - PAMNG | Fixed quantity of scrap from production | |
280 | ![]() |
MCAFPO - PGMNG | Total planned order quantity | |
281 | ![]() |
MCAFPO - PLCHK1P | Plausibility check: item w/o actual start | |
282 | ![]() |
MCAFPO - PLCHK2P | Plausibility Check: Actual Finish Date before Start Date | |
283 | ![]() |
MCAFPO - PLNUM | Planned order number | |
284 | ![]() |
MCAFPO - POSNR | Order item number | |
285 | ![]() |
MCAFPO - PSAMG | Scrap quantity in item | |
286 | ![]() |
MCAFPO - PSMNG | Order item quantity | |
287 | ![]() |
MCAFPO - STRMP | Start date of the planned order | |
288 | ![]() |
MCAFPO - S_DFZ | Target execution time | |
289 | ![]() |
MCAFPO - S_DFZ_EX | Target execution time (exact) | |
290 | ![]() |
MCAFPO - S_DLZ_EX | Target lead time (exact) | |
291 | ![]() |
MCAFPO - UMREN | Denominator for conversion to base units of measure | |
292 | ![]() |
MCAFPO - UMREZ | Numerator for Conversion to Base Units of Measure | |
293 | ![]() |
MCAFPO - VDATU | Date of update for statistics updating | |
294 | ![]() |
MCAFPO - WEMNG | Quantity of goods received | |
295 | ![]() |
MCAFPOADD - VDATU | Date of update for statistics updating | |
296 | ![]() |
MCAFPOB - AMEIN | Unit of measure for in-house production | |
297 | ![]() |
MCAFPOB - AUFNR | Order Number | |
298 | ![]() |
MCAFPOB - BUDAT | Posting date delivery/finish date, actual | |
299 | ![]() |
MCAFPOB - DFZEH | Unit of measure for execution time | |
300 | ![]() |
MCAFPOB - DFZEXEH | Unit for execution time (exact) | |
301 | ![]() |
MCAFPOB - ETRMP | Opening date of the planned order | |
302 | ![]() |
MCAFPOB - IAMNG | Actual scrap quantity from an order item | |
303 | ![]() |
MCAFPOB - I_DFZ | Actual execution time | |
304 | ![]() |
MCAFPOB - I_DFZ_EX | Actual execution time (exact) | |
305 | ![]() |
MCAFPOB - I_DLZ_EX | Actual lead time (exact) | |
306 | ![]() |
MCAFPOB - KEINH | Unit of of measure for displaying capacity requirements | |
307 | ![]() |
MCAFPOB - KSUMS | Total target capacity requirements | |
308 | ![]() |
MCAFPOB - LTRMI | Actual delivery/finish date | |
309 | ![]() |
MCAFPOB - LTRMP | Delivery date from planned order | |
310 | ![]() |
MCAFPOB - MATNR | Material Number | |
311 | ![]() |
MCAFPOB - MCPAMNG | Fixed production scrap qty in unit of in-house production | |
312 | ![]() |
MCAFPOB - MCPGMNG | Total planned order quantity in unit of in-house production | |
313 | ![]() |
MCAFPOB - MEINS | Base Unit of Measure | |
314 | ![]() |
MCAFPOB - PAMNG | Fixed quantity of scrap from production | |
315 | ![]() |
MCAFPOB - PGMNG | Total planned order quantity | |
316 | ![]() |
MCAFPOB - PLCHK1P | Plausibility check: item w/o actual start | |
317 | ![]() |
MCAFPOB - PLCHK2P | Plausibility Check: Actual Finish Date before Start Date | |
318 | ![]() |
MCAFPOB - PLNUM | Planned order number | |
319 | ![]() |
MCAFPOB - POSNR | Order item number | |
320 | ![]() |
MCAFPOB - PSAMG | Scrap quantity in item | |
321 | ![]() |
MCAFPOB - PSMNG | Order item quantity | |
322 | ![]() |
MCAFPOB - STRMP | Start date of the planned order | |
323 | ![]() |
MCAFPOB - SUPKZ | Statistics update indicator (post in/post out) | |
324 | ![]() |
MCAFPOB - S_DFZ | Target execution time | |
325 | ![]() |
MCAFPOB - S_DFZ_EX | Target execution time (exact) | |
326 | ![]() |
MCAFPOB - S_DLZ_EX | Target lead time (exact) | |
327 | ![]() |
MCAFPOB - UMREN | Denominator for conversion to base units of measure | |
328 | ![]() |
MCAFPOB - UMREZ | Numerator for Conversion to Base Units of Measure | |
329 | ![]() |
MCAFPOB - VDATU | Date of update for statistics updating | |
330 | ![]() |
MCAFPOB - WEMNG | Quantity of goods received | |
331 | ![]() |
MCAFPOB - ZEITP | Event for which updating should take place | |
332 | ![]() |
MCAFVG - ABRUE | Scheduled teardown time | |
333 | ![]() |
MCAFVG - APLZL | Internal counter | |
334 | ![]() |
MCAFVG - ARBID | Object ID | |
335 | ![]() |
MCAFVG - ARBII | Actual operating resources object identification | |
336 | ![]() |
MCAFVG - ARBPL | Work center | |
337 | ![]() |
MCAFVG - ARBPLI | Work center | |
338 | ![]() |
MCAFVG - ARUZE | Unit of measure for teardown | |
339 | ![]() |
MCAFVG - AUFPL | Routing number of operations in the order | |
340 | ![]() |
MCAFVG - BEARZ | Scheduled processing time | |
341 | ![]() |
MCAFVG - BEAZE | Unit of measure for processing time | |
342 | ![]() |
MCAFVG - BUDAT | Posting date of last confirmation | |
343 | ![]() |
MCAFVG - DFZEH | Unit of measure for execution time | |
344 | ![]() |
MCAFVG - GMNGA | Total Delivered Lot Size | |
345 | ![]() |
MCAFVG - GRUND | Reason for Variance | |
346 | ![]() |
MCAFVG - IADD | Actual input date | |
347 | ![]() |
MCAFVG - IADZ | Actual input (time of day) | |
348 | ![]() |
MCAFVG - IEAVD | Actual finish of operation (date) | |
349 | ![]() |
MCAFVG - IEDD | Actual finish: Execution (date) | |
350 | ![]() |
MCAFVG - IEDZ | Actual finish: Execution (time) | |
351 | ![]() |
MCAFVG - ILE01 | Unit of measure for 1st activity to be confirmed | |
352 | ![]() |
MCAFVG - ILE02 | Unit of measure for 2nd activity to be confirmed | |
353 | ![]() |
MCAFVG - ILE03 | Unit of measure for 3rd activity to be confirmed | |
354 | ![]() |
MCAFVG - ILE04 | Unit of measure for 4th activity to be confirmed | |
355 | ![]() |
MCAFVG - ILE05 | Unit of measure for 5th activity to be confirmed | |
356 | ![]() |
MCAFVG - ILE06 | Unit of measure for 6th activity to be confirmed | |
357 | ![]() |
MCAFVG - IPRE1 | Unit of measurement for conf. quantity for business process | |
358 | ![]() |
MCAFVG - IPRZ1 | Confirmed quantity/work for business process | |
359 | ![]() |
MCAFVG - ISAVD | Actual operation start (date) | |
360 | ![]() |
MCAFVG - ISDD | Actual start: Execution (date) | |
361 | ![]() |
MCAFVG - ISDZ | Actual start: Execution/setup (time) | |
362 | ![]() |
MCAFVG - ISM01 | Confirmed activity 1 - activity type | |
363 | ![]() |
MCAFVG - ISM02 | Confirmed activity 2 - activity type | |
364 | ![]() |
MCAFVG - ISM03 | Confirmed activity 3 - activity type | |
365 | ![]() |
MCAFVG - ISM04 | Confirmed activity 4 - activity type | |
366 | ![]() |
MCAFVG - ISM05 | Confirmed activity 5 - activity type | |
367 | ![]() |
MCAFVG - ISM06 | Confirmed activity - activity type 6 | |
368 | ![]() |
MCAFVG - I_ABRUE | Actual teardown | |
369 | ![]() |
MCAFVG - I_BEARZ | Actual processing time | |
370 | ![]() |
MCAFVG - I_DFZ | Actual execution time | |
371 | ![]() |
MCAFVG - I_DFZ_EX | Actual execution time (exact) | |
372 | ![]() |
MCAFVG - I_DLZ_EX | Actual lead time (exact) | |
373 | ![]() |
MCAFVG - I_RUEST | Actual setup time | |
374 | ![]() |
MCAFVG - KABRS | Scheduled cap. requirements for the op. segment teardown | |
375 | ![]() |
MCAFVG - KALID | Factory Calendar | |
376 | ![]() |
MCAFVG - KAPAR | Capacity category | |
377 | ![]() |
MCAFVG - KAPID | Capacity ID | |
378 | ![]() |
MCAFVG - KAPKZ | SFIS indicator for cumulative updating of capacity data | |
379 | ![]() |
MCAFVG - KBEAS | Scheduled cap. requirements for the op. segment "processing" | |
380 | ![]() |
MCAFVG - KEINH | Unit of of measure for displaying capacity requirements | |
381 | ![]() |
MCAFVG - KRUES | Scheduled cap. requirements for the op. segment "setup" | |
382 | ![]() |
MCAFVG - LIGZE | Unit of measure for wait time | |
383 | ![]() |
MCAFVG - LMNGA | Total quantity confirmed | |
384 | ![]() |
MCAFVG - LOART | Wage type | |
385 | ![]() |
MCAFVG - LOGRP | Wage group | |
386 | ![]() |
MCAFVG - LSTEFF1 | Efficiency of activity type 1 | |
387 | ![]() |
MCAFVG - LSTEFF2 | Efficiency of activity type 2 | |
388 | ![]() |
MCAFVG - LSTEFF3 | Efficiency of activity type 3 | |
389 | ![]() |
MCAFVG - LSTEFF4 | Efficiency of activity type 4 | |
390 | ![]() |
MCAFVG - LSTEFF5 | Efficiency of activity type 4 | |
391 | ![]() |
MCAFVG - LSTEFF6 | Efficiency of activity type 6 | |
392 | ![]() |
MCAFVG - MGVRG | Operation quantity | |
393 | ![]() |
MCAFVG - N_IEAVD | Actual end of successor operation | |
394 | ![]() |
MCAFVG - OBJNR | Object number | |
395 | ![]() |
MCAFVG - PERNR | Personnel number | |
396 | ![]() |
MCAFVG - PLANR | Capacity planner group | |
397 | ![]() |
MCAFVG - PLCHK1V | Plausibility check: operation without actual input | |
398 | ![]() |
MCAFVG - PLCHK2V | Plausibility Check: Actual Finish of Op. before Actual input | |
399 | ![]() |
MCAFVG - PLCHK3V | Plausibility check: invalid milestone confirmation | |
400 | ![]() |
MCAFVG - PLNFL | Sequence | |
401 | ![]() |
MCAFVG - PLNKN | Number of the task list node | |
402 | ![]() |
MCAFVG - PLNNR | Key for Task List Group | |
403 | ![]() |
MCAFVG - PLNTY | Task List Type | |
404 | ![]() |
MCAFVG - QUALF | Suitability | |
405 | ![]() |
MCAFVG - REFOP24 | Reference operation set | |
406 | ![]() |
MCAFVG - RSTZE | Unit of measure for setup time | |
407 | ![]() |
MCAFVG - RUEST | Scheduled setup time | |
408 | ![]() |
MCAFVG - SMNG1 | Quantity to be confirmed for activity type 1 | |
409 | ![]() |
MCAFVG - SMNG2 | Quantity to be confirmed for activity type 2 | |
410 | ![]() |
MCAFVG - SMNG3 | Quantity to be confirmed for activity type 3 | |
411 | ![]() |
MCAFVG - SMNG4 | Quantity to be confirmed for activity type 4 | |
412 | ![]() |
MCAFVG - SMNG5 | Quantity to be confirmed for activity type 5 | |
413 | ![]() |
MCAFVG - SMNG6 | Quantity to be confirmed for activity type 6 | |
414 | ![]() |
MCAFVG - SSADD | Latest target input date | |
415 | ![]() |
MCAFVG - SSADZ | Latest target input (time of day) | |
416 | ![]() |
MCAFVG - SSAVD | Latest scheduled start: Execution (date) | |
417 | ![]() |
MCAFVG - SSAVZ | Latest scheduled start: Execution (time) | |
418 | ![]() |
MCAFVG - SSEDD | Latest scheduled finish: Execution (date) | |
419 | ![]() |
MCAFVG - SSEDZ | Latest scheduled finish: Execution (time) | |
420 | ![]() |
MCAFVG - STDKN | Node of operation within reference operation set | |
421 | ![]() |
MCAFVG - STEUS | Control key | |
422 | ![]() |
MCAFVG - S_DFZ | Target execution time | |
423 | ![]() |
MCAFVG - S_DFZ_EX | Target execution time (exact) | |
424 | ![]() |
MCAFVG - S_DLZ_EX | Target lead time (exact) | |
425 | ![]() |
MCAFVG - UMREN | Denominator for conversion to base units of measure | |
426 | ![]() |
MCAFVG - UMREZ | Numerator for Conversion to Base Units of Measure | |
427 | ![]() |
MCAFVG - UVORN | Suboperation | |
428 | ![]() |
MCAFVG - VDATU | Date of update for statistics updating | |
429 | ![]() |
MCAFVG - VERAN | Person responsible for the work center | |
430 | ![]() |
MCAFVG - VERANI | Person responsible for the work center | |
431 | ![]() |
MCAFVG - VGE01 | Unit of measure for standard value 1 | |
432 | ![]() |
MCAFVG - VGE02 | Unit of measure for standard value 2 | |
433 | ![]() |
MCAFVG - VGE03 | Unit of measure for standard value 3 | |
434 | ![]() |
MCAFVG - VGE04 | Unit of measure for standard value 4 | |
435 | ![]() |
MCAFVG - VGE05 | Unit of measure for standard value 5 | |
436 | ![]() |
MCAFVG - VGE06 | Unit of measure for standard value 6 | |
437 | ![]() |
MCAFVG - VG_FREI | Operation has status RELEASED | |
438 | ![]() |
MCAFVG - VG_RMAN | Operation has status RMAN | |
439 | ![]() |
MCAFVG - VG_RUECK | Operation has status CONFIRMED | |
440 | ![]() |
MCAFVG - VG_TRUEC | Operation has status PARTIALLY CONFIRMED | |
441 | ![]() |
MCAFVG - VORNR | Operation/Activity Number | |
442 | ![]() |
MCAFVG - VPLNR | Group of the referenced task list | |
443 | ![]() |
MCAFVG - VPLTY | Task list type for reference | |
444 | ![]() |
MCAFVG - V_LIEGZ | Wait time used for scheduling | |
445 | ![]() |
MCAFVG - WERKS | Plant | |
446 | ![]() |
MCAFVG - WERKSI | Plant | |
447 | ![]() |
MCAFVG - XMNGA | Total scrap quantity confirmed | |
448 | ![]() |
MCAFVG - ZAEHL | Internal counter | |
449 | ![]() |
MCAFVG - ZMNG1 | Target quantity of activity type 1 | |
450 | ![]() |
MCAFVG - ZMNG2 | Target quantity of activity type 2 | |
451 | ![]() |
MCAFVG - ZMNG3 | Target quantity of activity type 3 | |
452 | ![]() |
MCAFVG - ZMNG4 | Target quantity of activity type 4 | |
453 | ![]() |
MCAFVG - ZMNG5 | Target quantity of activity type 5 | |
454 | ![]() |
MCAFVG - ZMNG6 | Target quantity of activity type 6 | |
455 | ![]() |
MCAFVGB - ABRUE | Scheduled teardown time | |
456 | ![]() |
MCAFVGB - APLZL | Internal counter | |
457 | ![]() |
MCAFVGB - ARBID | Object ID | |
458 | ![]() |
MCAFVGB - ARBII | Actual operating resources object identification | |
459 | ![]() |
MCAFVGB - ARBPL | Work center | |
460 | ![]() |
MCAFVGB - ARBPLI | Work center | |
461 | ![]() |
MCAFVGB - ARUZE | Unit of measure for teardown | |
462 | ![]() |
MCAFVGB - AUFPL | Routing number of operations in the order | |
463 | ![]() |
MCAFVGB - BEARZ | Scheduled processing time | |
464 | ![]() |
MCAFVGB - BEAZE | Unit of measure for processing time | |
465 | ![]() |
MCAFVGB - BUDAT | Posting date of last confirmation | |
466 | ![]() |
MCAFVGB - DFZEH | Unit of measure for execution time | |
467 | ![]() |
MCAFVGB - GMNGA | Total Delivered Lot Size | |
468 | ![]() |
MCAFVGB - GRUND | Reason for Variance | |
469 | ![]() |
MCAFVGB - IADD | Actual input date | |
470 | ![]() |
MCAFVGB - IADZ | Actual input (time of day) | |
471 | ![]() |
MCAFVGB - IEAVD | Actual finish of operation (date) | |
472 | ![]() |
MCAFVGB - IEDD | Actual finish: Execution (date) | |
473 | ![]() |
MCAFVGB - IEDZ | Actual finish: Execution (time) | |
474 | ![]() |
MCAFVGB - ILE01 | Unit of measure for 1st activity to be confirmed | |
475 | ![]() |
MCAFVGB - ILE02 | Unit of measure for 2nd activity to be confirmed | |
476 | ![]() |
MCAFVGB - ILE03 | Unit of measure for 3rd activity to be confirmed | |
477 | ![]() |
MCAFVGB - ILE04 | Unit of measure for 4th activity to be confirmed | |
478 | ![]() |
MCAFVGB - ILE05 | Unit of measure for 5th activity to be confirmed | |
479 | ![]() |
MCAFVGB - ILE06 | Unit of measure for 6th activity to be confirmed | |
480 | ![]() |
MCAFVGB - IPRE1 | Unit of measurement for conf. quantity for business process | |
481 | ![]() |
MCAFVGB - IPRZ1 | Confirmed quantity/work for business process | |
482 | ![]() |
MCAFVGB - ISAVD | Actual operation start (date) | |
483 | ![]() |
MCAFVGB - ISDD | Actual start: Execution (date) | |
484 | ![]() |
MCAFVGB - ISDZ | Actual start: Execution/setup (time) | |
485 | ![]() |
MCAFVGB - ISM01 | Confirmed activity 1 - activity type | |
486 | ![]() |
MCAFVGB - ISM02 | Confirmed activity 2 - activity type | |
487 | ![]() |
MCAFVGB - ISM03 | Confirmed activity 3 - activity type | |
488 | ![]() |
MCAFVGB - ISM04 | Confirmed activity 4 - activity type | |
489 | ![]() |
MCAFVGB - ISM05 | Confirmed activity 5 - activity type | |
490 | ![]() |
MCAFVGB - ISM06 | Confirmed activity - activity type 6 | |
491 | ![]() |
MCAFVGB - I_ABRUE | Actual teardown | |
492 | ![]() |
MCAFVGB - I_BEARZ | Actual processing time | |
493 | ![]() |
MCAFVGB - I_DFZ | Actual execution time | |
494 | ![]() |
MCAFVGB - I_DFZ_EX | Actual execution time (exact) | |
495 | ![]() |
MCAFVGB - I_DLZ_EX | Actual lead time (exact) | |
496 | ![]() |
MCAFVGB - I_RUEST | Actual setup time | |
497 | ![]() |
MCAFVGB - KABRS | Scheduled cap. requirements for the op. segment teardown | |
498 | ![]() |
MCAFVGB - KALID | Factory Calendar | |
499 | ![]() |
MCAFVGB - KAPAR | Capacity category | |
500 | ![]() |
MCAFVGB - KAPID | Capacity ID |