Table/Structure Field list used by SAP ABAP Program LM61YF0S (CHECK_VORZIEHEN_01)
SAP ABAP Program
LM61YF0S (CHECK_VORZIEHEN_01) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AF61Y - PLAAB | Material requirements planning segment | ||
| 2 | AF61Y - ALINE | Line index for internal table processing | ||
| 3 | AF61Y - VERFR | Type of availability calculation | ||
| 4 | AF61Y - UMTER | Checkbox | ||
| 5 | AF61Y - TERBV | Scheduling for period lot sizes in short-term area | ||
| 6 | AF61Y - SGDAY | Gregorian calender day | ||
| 7 | AF61Y - RCODE | Checkbox | ||
| 8 | AF61Y - PREND | Gregorian calender day | ||
| 9 | AF61Y - PERAZ | Number of periods for the short-term area | ||
| 10 | AF61Y - MNG01 | Quantity | ||
| 11 | AF61Y - LOSVF | Lot-sizing procedure for short-term period | ||
| 12 | AF61Y - LOSKZ | Lot-size indicator for the short-term period | ||
| 13 | AF61Y - KFEND | Gregorian calender day | ||
| 14 | AF61Y - FLP03 | General floating-point for counter field | ||
| 15 | AF61Y - FLP01 | General floating-point for counter field | ||
| 16 | AF61Y - BLINE | Line index for internal table processing | ||
| 17 | AM61X - RCODE | Single-Character Flag | ||
| 18 | CM61M - UMTER | End of rescheduling horizon (date) | ||
| 19 | MDNB - PLANR | Planning segment number | ||
| 20 | MDPS - DAT00 | Receipt/Requirements date | ||
| 21 | MDPS - VRFKZ | Availability indicator | ||
| 22 | MDPS - UKZ01 | Indicator: MRP element can be brought forward | ||
| 23 | MDPS - PLUMI | Receipt/issue indicator | ||
| 24 | MDPS - PLANR | Planning segment number | ||
| 25 | MDPS - PLAAB | Material requirements planning segment | ||
| 26 | MDPS - MNG02 | Variable scrap quantity | ||
| 27 | MDPS - MNG01 | Quantity received or quantity required | ||
| 28 | T439A - LGLKZ | Lot-size indicator for long-term lot-sizing procedure | ||
| 29 | T439A - LGLVF | Lot-sizing procedure for long-term lot-sizing | ||
| 30 | T439A - LGPAZ | Number of periods for long-term lot size | ||
| 31 | T439A - LGTER | Scheduling the long-term period lot-sizing procedure | ||
| 32 | T439A - LOSKZ | Lot-size indicator for the short-term period | ||
| 33 | T439A - LOSVF | Lot-sizing procedure for short-term period | ||
| 34 | T439A - PERAZ | Number of periods for the short-term area | ||
| 35 | T439A - TERBV | Scheduling for period lot sizes in short-term area |