Table/Structure Field list used by SAP ABAP Program LM61XF5L (ERSTELLEN_MDKP_DP)
SAP ABAP Program
LM61XF5L (ERSTELLEN_MDKP_DP) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
AF61X - RCODE | Single-Character Flag | |
2 | ![]() |
CM61D - RESAL | Re-explode BOM | |
3 | ![]() |
CM61M - AGREQ | Aggregated dependent requirements | |
4 | ![]() |
CM61M - FABKL | Material-Specific Calendar (Range of Coverage) | |
5 | ![]() |
CM61M - FIXTR | End of planning time fence (date) | |
6 | ![]() |
CM61M - GRREL | Relevant for requirements grouping for project stock | |
7 | ![]() |
CM61M - MFHKZ | Planning time fence set manually (MFXDT) | |
8 | ![]() |
CM61M - RWANZ | Number of periods for determining the average | |
9 | ![]() |
CM61M - RWART | Period length type for calculating the average | |
10 | ![]() |
CM61M - RWFLG | Calculate safety stock based on range of coverage | |
11 | ![]() |
CM61M - RWNTG | Number of days per range of coverage period | |
12 | ![]() |
CM61M - RWPER | Period for Calculating the Dynamic Safety Stock | |
13 | ![]() |
CM61W - DISPD | Date for planning (basis of comparison for time-phased plng) | |
14 | ![]() |
CM61X - DTART | Type of MRP list | |
15 | ![]() |
CM61X - INMEM | MRP in main memory | |
16 | ![]() |
CM61X - PLAUF | Type of planning run | |
17 | ![]() |
CM61X - PLSCN | Planning Scenario of Long-Term Planning | |
18 | ![]() |
MDFD - MFXDT | Manual firming date | |
19 | ![]() |
MDFD - WERKS | Plant | |
20 | ![]() |
MDKP - AHDIS | MRP relevancy for dependent requirements | |
21 | ![]() |
MDKP - AUSDT | Effective-out date | |
22 | ![]() |
MDKP - BESKZ | Procurement Type | |
23 | ![]() |
MDKP - BSTFX | Fixed lot size | |
24 | ![]() |
MDKP - BSTMA | Maximum lot size | |
25 | ![]() |
MDKP - BSTMI | Minimum lot size | |
26 | ![]() |
MDKP - BSTRF | Rounding value for purchase order quantity | |
27 | ![]() |
MDKP - CFLAG | Aggregated MRP list | |
28 | ![]() |
MDKP - DISGR | MRP Group | |
29 | ![]() |
MDKP - DISLS | Lot size (materials planning) | |
30 | ![]() |
MDKP - DISMM | MRP Type | |
31 | ![]() |
MDKP - DISPO | MRP controller | |
32 | ![]() |
MDKP - DISST | Low-level code | |
33 | ![]() |
MDKP - DISVF | MRP procedure | |
34 | ![]() |
MDKP - DSDAT | MRP date | |
35 | ![]() |
MDKP - DTART | Type of MRP list | |
36 | ![]() |
MDKP - EISBE | Safety stock | |
37 | ![]() |
MDKP - EKGRP | Purchasing group | |
38 | ![]() |
MDKP - FABKZ | Indicator: Item Relevant to JIT Delivery Schedules | |
39 | ![]() |
MDKP - FIXTR | End of planning time fence (date) | |
40 | ![]() |
MDKP - GRREL | Relevant for requirements grouping for project stock | |
41 | ![]() |
MDKP - HOEBE | Maximum stock level | |
42 | ![]() |
MDKP - KZAUS | Discontinuation indicator | |
43 | ![]() |
MDKP - KZPROMO | Indicator: Material in promotion | |
44 | ![]() |
MDKP - LFRHY | Planning cycle | |
45 | ![]() |
MDKP - LOSKZ | Lot-size indicator for the short-term period | |
46 | ![]() |
MDKP - LOSVF | Lot-sizing procedure for short-term period | |
47 | ![]() |
MDKP - MAABC | ABC indicator | |
48 | ![]() |
MDKP - MATNR | Material Number | |
49 | ![]() |
MDKP - MEINS | Base Unit of Measure | |
50 | ![]() |
MDKP - MFHKZ | Planning time fence set manually (MFXDT) | |
51 | ![]() |
MDKP - MFXDT | Manual firming date | |
52 | ![]() |
MDKP - MINBE | Reorder point | |
53 | ![]() |
MDKP - MRPPP | PPC planning calendar | |
54 | ![]() |
MDKP - MTART | Material type | |
55 | ![]() |
MDKP - NFMAT | Follow-up material | |
56 | ![]() |
MDKP - PERIV | Fiscal Year Variant | |
57 | ![]() |
MDKP - PLSCN | Planning Scenario of Long-Term Planning | |
58 | ![]() |
MDKP - PLWRK | Plant | |
59 | ![]() |
MDKP - RDPRF | Rounding Profile | |
60 | ![]() |
MDKP - RWPRO | Range of coverage profile | |
61 | ![]() |
MDKP - SAUFT | Ind.: Repetitive mfg allowed | |
62 | ![]() |
MDKP - SHFLG | Safety time indicator (with or without safety time) | |
63 | ![]() |
MDKP - SHPRO | Period profile for safety time | |
64 | ![]() |
MDKP - SHZET | Safety time (in workdays) | |
65 | ![]() |
MDKP - SOBES | Special procurement type | |
66 | ![]() |
MDKP - SOBSL | Special procurement type | |
67 | ![]() |
MDKP - WEBAZ | Goods receipt processing time in days | |
68 | ![]() |
MDKP - WRK02 | Planning/production plant | |
69 | ![]() |
MDKP_DATA - AHDIS | MRP relevancy for dependent requirements | |
70 | ![]() |
MDKP_DATA - AUSDT | Effective-out date | |
71 | ![]() |
MDKP_DATA - BESKZ | Procurement Type | |
72 | ![]() |
MDKP_DATA - BSTFX | Fixed lot size | |
73 | ![]() |
MDKP_DATA - BSTMA | Maximum lot size | |
74 | ![]() |
MDKP_DATA - BSTMI | Minimum lot size | |
75 | ![]() |
MDKP_DATA - BSTRF | Rounding value for purchase order quantity | |
76 | ![]() |
MDKP_DATA - CFLAG | Aggregated MRP list | |
77 | ![]() |
MDKP_DATA - DISGR | MRP Group | |
78 | ![]() |
MDKP_DATA - DISLS | Lot size (materials planning) | |
79 | ![]() |
MDKP_DATA - DISMM | MRP Type | |
80 | ![]() |
MDKP_DATA - DISPO | MRP controller | |
81 | ![]() |
MDKP_DATA - DISST | Low-level code | |
82 | ![]() |
MDKP_DATA - DISVF | MRP procedure | |
83 | ![]() |
MDKP_DATA - DSDAT | MRP date | |
84 | ![]() |
MDKP_DATA - EISBE | Safety stock | |
85 | ![]() |
MDKP_DATA - EKGRP | Purchasing group | |
86 | ![]() |
MDKP_DATA - FABKZ | Indicator: Item Relevant to JIT Delivery Schedules | |
87 | ![]() |
MDKP_DATA - FIXTR | End of planning time fence (date) | |
88 | ![]() |
MDKP_DATA - GRREL | Relevant for requirements grouping for project stock | |
89 | ![]() |
MDKP_DATA - HOEBE | Maximum stock level | |
90 | ![]() |
MDKP_DATA - KZAUS | Discontinuation indicator | |
91 | ![]() |
MDKP_DATA - KZPROMO | Indicator: Material in promotion | |
92 | ![]() |
MDKP_DATA - LFRHY | Planning cycle | |
93 | ![]() |
MDKP_DATA - LOSKZ | Lot-size indicator for the short-term period | |
94 | ![]() |
MDKP_DATA - LOSVF | Lot-sizing procedure for short-term period | |
95 | ![]() |
MDKP_DATA - MAABC | ABC indicator | |
96 | ![]() |
MDKP_DATA - MEINS | Base Unit of Measure | |
97 | ![]() |
MDKP_DATA - MFHKZ | Planning time fence set manually (MFXDT) | |
98 | ![]() |
MDKP_DATA - MFXDT | Manual firming date | |
99 | ![]() |
MDKP_DATA - MINBE | Reorder point | |
100 | ![]() |
MDKP_DATA - MRPPP | PPC planning calendar | |
101 | ![]() |
MDKP_DATA - MTART | Material type | |
102 | ![]() |
MDKP_DATA - NFMAT | Follow-up material | |
103 | ![]() |
MDKP_DATA - PERIV | Fiscal Year Variant | |
104 | ![]() |
MDKP_DATA - RDPRF | Rounding Profile | |
105 | ![]() |
MDKP_DATA - RWPRO | Range of coverage profile | |
106 | ![]() |
MDKP_DATA - SAUFT | Ind.: Repetitive mfg allowed | |
107 | ![]() |
MDKP_DATA - SHFLG | Safety time indicator (with or without safety time) | |
108 | ![]() |
MDKP_DATA - SHPRO | Period profile for safety time | |
109 | ![]() |
MDKP_DATA - SHZET | Safety time (in workdays) | |
110 | ![]() |
MDKP_DATA - SOBES | Special procurement type | |
111 | ![]() |
MDKP_DATA - SOBSL | Special procurement type | |
112 | ![]() |
MDKP_DATA - WEBAZ | Goods receipt processing time in days | |
113 | ![]() |
MDKP_DATA - WRK02 | Planning/production plant | |
114 | ![]() |
MDLV - BERID | MRP Area | |
115 | ![]() |
MDLV - BERTY | Type of MRP area | |
116 | ![]() |
MDMA - SOBSL | Special procurement type | |
117 | ![]() |
MT61D - AHDIS | MRP relevancy for dependent requirements | |
118 | ![]() |
MT61D - AUSDT | Effective-out date | |
119 | ![]() |
MT61D - BESKZ | Procurement Type | |
120 | ![]() |
MT61D - BSTFE | Fixed lot size | |
121 | ![]() |
MT61D - BSTMA | Maximum lot size | |
122 | ![]() |
MT61D - BSTMI | Minimum lot size | |
123 | ![]() |
MT61D - BSTRF | Rounding value for purchase order quantity | |
124 | ![]() |
MT61D - DISLS | Lot size (materials planning) | |
125 | ![]() |
MT61D - DISMM | MRP Type | |
126 | ![]() |
MT61D - DISPO | MRP controller | |
127 | ![]() |
MT61D - DISST | Low-level code | |
128 | ![]() |
MT61D - EISBE | Safety stock | |
129 | ![]() |
MT61D - EKGRP | Purchasing group | |
130 | ![]() |
MT61D - FABKZ | Indicator: Item Relevant to JIT Delivery Schedules | |
131 | ![]() |
MT61D - KZAUS | Discontinuation indicator | |
132 | ![]() |
MT61D - LFRHY | Planning cycle | |
133 | ![]() |
MT61D - LVORM | Deletion Indicator | |
134 | ![]() |
MT61D - MAABC | ABC indicator | |
135 | ![]() |
MT61D - MABST | Maximum stock level | |
136 | ![]() |
MT61D - MATNR | Material Number | |
137 | ![]() |
MT61D - MEINS | Base Unit of Measure | |
138 | ![]() |
MT61D - MINBE | Reorder point | |
139 | ![]() |
MT61D - MMSTA | Plant-Specific Material Status | |
140 | ![]() |
MT61D - MMSTD | Date from which the plant-specific material status is valid | |
141 | ![]() |
MT61D - MRPPP | PPC planning calendar | |
142 | ![]() |
MT61D - MSTAE | Cross-Plant Material Status | |
143 | ![]() |
MT61D - MSTDE | Date from which the cross-plant material status is valid | |
144 | ![]() |
MT61D - MTART | Material type | |
145 | ![]() |
MT61D - NFMAT | Follow-up material | |
146 | ![]() |
MT61D - PERIV | Fiscal Year Variant | |
147 | ![]() |
MT61D - RDPRF | Rounding Profile | |
148 | ![]() |
MT61D - RWPRO | Range of coverage profile | |
149 | ![]() |
MT61D - SAUFT | Ind.: Repetitive mfg allowed | |
150 | ![]() |
MT61D - SHFLG | Safety time indicator (with or without safety time) | |
151 | ![]() |
MT61D - SHPRO | Period profile for safety time | |
152 | ![]() |
MT61D - SHZET | Safety time (in workdays) | |
153 | ![]() |
MT61D - SOBSL | Special procurement type | |
154 | ![]() |
MT61D - WEBAZ | Goods receipt processing time in days | |
155 | ![]() |
MT61D - WERKS | Plant | |
156 | ![]() |
PLSC - FIXLO | Long-term planning: switch off planning time fence | |
157 | ![]() |
PLSC - LLSKZ | Long-term planning: Use gross lot size | |
158 | ![]() |
PLSC - LTPLS | Long-term planning lot size procedure (gross) | |
159 | ![]() |
PLSC - SSTCK | Opening stock for long-term planning | |
160 | ![]() |
SYST - DATLO | ABAP System Field: Local Date of Current User | |
161 | ![]() |
T000MD - DISFG | Activate MRP areas at client level | |
162 | ![]() |
T399D - COMPM | Transparent storage: MRP lists | |
163 | ![]() |
T399D - ERDSG | Substitute MRP contoller/group for requirements planning | |
164 | ![]() |
T399D - EREKG | Substitute purchasing group for requirements planning | |
165 | ![]() |
T438A - DISVF | MRP procedure | |
166 | ![]() |
T439A - LOSKZ | Lot-size indicator for the short-term period | |
167 | ![]() |
T439A - LOSVF | Lot-sizing procedure for short-term period |