Table/Structure Field list used by SAP ABAP Program LM61XF5J (VERTEILUNG_PA)
SAP ABAP Program LM61XF5J (VERTEILUNG_PA) is using
# Object Type Object Name Object Description Note
     
1 Table/Structure Field  AF61X - FLP02 General floating-point for counter field
2 Table/Structure Field  AF61X - FLP05 General floating-point for counter field
3 Table/Structure Field  AF61X - RCODE Single-Character Flag
4 Table/Structure Field  AF61X - FLP01 General floating-point for counter field
5 Table/Structure Field  CM61M - ANDEC No. of decimal places to which rounding should be performed
6 Table/Structure Field  CM61W - FABKL Factory calendar key
7 Table/Structure Field  CM61X - PLAUF Type of planning run
8 Table/Structure Field  MDKP - BADON Indicator: BAdI is Active
9 Table/Structure Field  MDKP - DISMM MRP Type
10 Table/Structure Field  MDKP - DISPO MRP controller
11 Table/Structure Field  MDKP - MTART Material type
12 Table/Structure Field  MDKP_DATA - DISMM MRP Type
13 Table/Structure Field  MDKP_DATA - MTART Material type
14 Table/Structure Field  MDKP_DATA - DISPO MRP controller
15 Table/Structure Field  MDKP_DATA - BADON Indicator: BAdI is Active
16 Table/Structure Field  MDPS - DAT01 Delivery/order finish date
17 Table/Structure Field  MDPS - MNG01 Quantity received or quantity required
18 Table/Structure Field  MDPS - MNG02 Variable scrap quantity
19 Table/Structure Field  MDUP - MATNR Material Number
20 Table/Structure Field  MDUP - VERTO Distribution key for quantity produced
21 Table/Structure Field  MDUP - PWWRK Production plant in planned order
22 Table/Structure Field  MDUP - PSTTR Order start date in planned order
23 Table/Structure Field  MDUP - PLWRK Planning Plant
24 Table/Structure Field  MDUP - PLNUM Planned order number
25 Table/Structure Field  MDUP - PAART Order type
26 Table/Structure Field  MDUP - LGORT Storage location
27 Table/Structure Field  MDUP - GSMNG Total planned order quantity
28 Table/Structure Field  MDUP - BERID MRP Area
29 Table/Structure Field  MDUP - AVMNG Fixed quantity of scrap from production
30 Table/Structure Field  MDUP - PEDTR Order finish date in the planned order
31 Table/Structure Field  PLAF - MATNR Planning material
32 Table/Structure Field  PLAF - VERTO Distribution key for quantity produced
33 Table/Structure Field  PLAF - PWWRK Production plant in planned order
34 Table/Structure Field  PLAF - PSTTR Order start date in planned order
35 Table/Structure Field  PLAF - PLWRK Planning Plant
36 Table/Structure Field  PLAF - PLNUM Planned order number
37 Table/Structure Field  PLAF - PEDTR Order finish date in the planned order
38 Table/Structure Field  PLAF - PAART Order type
39 Table/Structure Field  PLAF - LGORT Storage location
40 Table/Structure Field  PLAF - GSMNG Total planned order quantity
41 Table/Structure Field  PLAF - BERID MRP Area
42 Table/Structure Field  PLAF - AVMNG Fixed quantity of scrap from production
43 Table/Structure Field  WERTTAB - DAT Valid-From Date
44 Table/Structure Field  WERTTAB - MENGE1 Scheduled capacity requirements
45 Table/Structure Field  WERTTAB - MENGE2 Scheduled capacity requirements