Table/Structure Field list used by SAP ABAP Program LM60RF03 (MDM: Create Master IDoc DEBMAS from SMD, suppress feedback message)
SAP ABAP Program
LM60RF03 (MDM: Create Master IDoc DEBMAS from SMD, suppress feedback message) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AM60X - DATUBI | Requirements date to | ||
| 2 | AM60X - ANDEC | No. of decimal places to which rounding should be performed | ||
| 3 | AM60X - PLGMG | Total planning quantity | ||
| 4 | AM60X - PERIO | Requirements date | ||
| 5 | AM60X - PERET | Date type (day, week, month, interval) | ||
| 6 | AM60X - H_ENTLI | Date type (day, week, month, interval) | ||
| 7 | AM60X - FLG01 | Checkbox | ||
| 8 | AM60X - ENTLI | Date type (day, week, month, interval) | ||
| 9 | AM60X - DATUVI | Requirements date | ||
| 10 | AM60X - H_DATUM | Delivery/order finish date | ||
| 11 | DBPR - BERID | MRP Area | ||
| 12 | DBPR - DATUM | System Date | ||
| 13 | DBPR - MATNR | Material Number | ||
| 14 | DBPR - PERKZ | Period indicator | ||
| 15 | DBPR - PNUM1 | Pointer: forecast parameters | ||
| 16 | DBPR - UZEIT | System Time | ||
| 17 | MAPR - PERKZ | Period indicator | ||
| 18 | MAPR - WERKS | Plant | ||
| 19 | MAPR - UZEIT | System Time | ||
| 20 | MAPR - PNUM1 | Pointer: forecast parameters | ||
| 21 | MAPR - MATNR | Material Number | ||
| 22 | MAPR - DATUM | System Date | ||
| 23 | MDLV - BERTY | Type of MRP area | ||
| 24 | MT61D - BERID | MRP Area | ||
| 25 | MT61D - DISMM | MRP Type | ||
| 26 | MT61D - MAKTX | Material description | ||
| 27 | MT61D - MEINS | Base Unit of Measure | ||
| 28 | MT61D - PERIV | Fiscal Year Variant | ||
| 29 | PBED - PDATU | Delivery/order finish date | ||
| 30 | PROP - VERSP | Version number of forecast parameters | ||
| 31 | PROP - PRMOD | Forecast model | ||
| 32 | PROP - PNUM1 | Pointer: forecast parameters | ||
| 33 | PROP - HSNUM | Number for history | ||
| 34 | PROP - PNUM2 | Pointer for forecast results | ||
| 35 | PROW - ERTAG | First day of the period to which the values refer | ||
| 36 | PROW - KOPRW | Corrected value for forecast | ||
| 37 | PROW - PNUM2 | Pointer for forecast results | ||
| 38 | RBET - PLNMG | Planned quantity | ||
| 39 | RBET - POSNR | Requirements plan item | ||
| 40 | RBET - PERXX | Planning period | ||
| 41 | RBET - PDATU | Delivery/order finish date | ||
| 42 | RBET - ENTLU | Period indicator (day, week, month, posting period) | ||
| 43 | RBET - ENTLI | Date type (day, week, month, interval) | ||
| 44 | RBPT - MRPPP | PPC planning calendar | ||
| 45 | RBPT - WERKS | Plant | ||
| 46 | RBPT - VERSB | Version number for independent requirements | ||
| 47 | RBPT - UHRLP | Time | ||
| 48 | RBPT - UEBKZ | Indicator: data copied | ||
| 49 | RBPT - TXZ01 | Short Text | ||
| 50 | RBPT - POSNR | Requirements plan item | ||
| 51 | RBPT - PLGMG | Total planning quantity | ||
| 52 | RBPT - PERIV | Fiscal Year Variant | ||
| 53 | RBPT - PBDNR | Requirements Plan Number | ||
| 54 | RBPT - MEINS | Base Unit of Measure | ||
| 55 | RBPT - MATNR | Material Number | ||
| 56 | RBPT - DATLP | Date | ||
| 57 | RBPT - BERID | MRP Area | ||
| 58 | RBPT - BEDAE | Requirements type | ||
| 59 | RM60V - EDATB | Requirements date to | ||
| 60 | RM60V - EDATV | Requirements date | ||
| 61 | RM60V - ENTLU | Period indicator (day, week, month, posting period) | ||
| 62 | SYST - DATLO | ABAP System Field: Local Date of Current User | ||
| 63 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 64 | T438A - DISMM | MRP Type | ||
| 65 | T438A - PROKZ | Forecast indicator |