Table/Structure Field list used by SAP ABAP Program LCY04FP1 (Predecessor and Successor of Operation)
SAP ABAP Program
LCY04FP1 (Predecessor and Successor of Operation) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AFAB - AOBAR | Type of relationship | ||
| 2 | AFAB - APLZL_NCH | Internal counter | ||
| 3 | AFAB - APLZL_VOR | Internal counter | ||
| 4 | AFAB - ARBID | Object ID | ||
| 5 | AFAB - AUFPL_NCH | No. identifying the network to which the successor belongs | ||
| 6 | AFAB - AUFPL_VOR | No. identifying the network to which the predecessor belongs | ||
| 7 | AFAB - DAUER | Time interval between relationships | ||
| 8 | AFAB - DAUTM | Relationship duration (in seconds) as result of scheduling | ||
| 9 | AFAB - KALID | Factory Calendar | ||
| 10 | AFAB - MIMAX | Indicates whether maximum time interval will be considered | ||
| 11 | AFAB - ZEINH | Unit for the time interval between relationships | ||
| 12 | AFABD - AOBAR | Type of relationship | ||
| 13 | AFABD - AOBTX | Short text for the type of relationship | ||
| 14 | AFABD - APLZL_NCH | Internal counter | ||
| 15 | AFABD - APLZL_VOR | Internal counter | ||
| 16 | AFABD - ARBID | Object ID | ||
| 17 | AFABD - AUFPL_NCH | No. identifying the network to which the successor belongs | ||
| 18 | AFABD - AUFPL_VOR | No. identifying the network to which the predecessor belongs | ||
| 19 | AFABD - DAUER | Time interval between relationships | ||
| 20 | AFABD - DAUTM | Relationship duration (in seconds) as result of scheduling | ||
| 21 | AFABD - INDBT_VOR1 | Field defined as in SY-TABIX | ||
| 22 | AFABD - INDBT_VOR2 | Field defined as in SY-TABIX | ||
| 23 | AFABD - KALID | Factory Calendar | ||
| 24 | AFABD - MIMAX | Indicates whether maximum time interval will be considered | ||
| 25 | AFABD - ZEINH | Unit for the time interval between relationships | ||
| 26 | AFAB_INC - ARBID | Object ID | ||
| 27 | AFAB_INC - DAUER | Time interval between relationships | ||
| 28 | AFAB_INC - DAUTM | Relationship duration (in seconds) as result of scheduling | ||
| 29 | AFAB_INC - KALID | Factory Calendar | ||
| 30 | AFAB_INC - ZEINH | Unit for the time interval between relationships | ||
| 31 | AFVGD - APLFL | Sequence | ||
| 32 | AFVGD - APLZL | General counter for order | ||
| 33 | AFVGD - ARBID | Object ID of the resource | ||
| 34 | AFVGD - ARBPL | Work center | ||
| 35 | AFVGD - AUFNRD | Order Number | ||
| 36 | AFVGD - AUFPL | Routing number of operations in the order | ||
| 37 | AFVGD - BEDID | ID of the capacity requirements record | ||
| 38 | AFVGD - BEDZL | Internal counter | ||
| 39 | AFVGD - FLIES | Indicator: continuous flow production | ||
| 40 | AFVGD - FSAVD | Earliest scheduled start: Execution (date) | ||
| 41 | AFVGD - FSAVZ | Earliest scheduled start: Execution (time) | ||
| 42 | AFVGD - INDBT | Field defined as in SY-TABIX | ||
| 43 | AFVGD - LIEGZ | Wait time used for scheduling | ||
| 44 | AFVGD - MGVRG | Operation Quantity | ||
| 45 | AFVGD - MINWE | Minimum Send-Ahead Quantity | ||
| 46 | AFVGD - OBJNR | Object number | ||
| 47 | AFVGD - RSTRA | Reduction strategy per operation/activity | ||
| 48 | AFVGD - RSTUF | Reduction level which reduces operation lead time | ||
| 49 | AFVGD - SSAVD | Latest scheduled start: Execution (date) | ||
| 50 | AFVGD - SSAVZ | Latest scheduled start: Execution (time) | ||
| 51 | AFVGD - SSEDD | Latest scheduled finish: Execution (date) | ||
| 52 | AFVGD - SSEDZ | Latest scheduled finish: Execution (time) | ||
| 53 | AFVGD - SSELD | Latest scheduled finish: Wait time (date) | ||
| 54 | AFVGD - SSELZ | Latest scheduled finish: Wait time | ||
| 55 | AFVGD - STEUS | Control key | ||
| 56 | AFVGD - UEKAN | Optional overlapping | ||
| 57 | AFVGD - UEMUS | Required overlapping | ||
| 58 | AFVGD - UVORN | Suboperation | ||
| 59 | AFVGD - VORNR | Operation/Activity Number | ||
| 60 | AFVGD - WARTZ | Queue time used for scheduling | ||
| 61 | AFVGD - WERKS | Plant | ||
| 62 | AFVGI - APLFL | Sequence | ||
| 63 | AFVGI - ARBID | Object ID of the resource | ||
| 64 | AFVGI - BEDID | ID of the capacity requirements record | ||
| 65 | AFVGI - BEDZL | Internal counter | ||
| 66 | AFVGI - FLIES | Indicator: continuous flow production | ||
| 67 | AFVGI - OBJNR | Object number | ||
| 68 | AFVGI - RSTRA | Reduction strategy per operation/activity | ||
| 69 | AFVGI - RSTUF | Reduction level which reduces operation lead time | ||
| 70 | AFVGI - STEUS | Control key | ||
| 71 | AFVGI - UEKAN | Optional overlapping | ||
| 72 | AFVGI - UEMUS | Required overlapping | ||
| 73 | AFVGI - VORNR | Operation/Activity Number | ||
| 74 | AFVGI - WERKS | Plant | ||
| 75 | AFVKI - APLZL | General counter for order | ||
| 76 | AFVKI - AUFPL | Routing number of operations in the order | ||
| 77 | AFVVI - FSAVD | Earliest scheduled start: Execution (date) | ||
| 78 | AFVVI - FSAVZ | Earliest scheduled start: Execution (time) | ||
| 79 | AFVVI - LIEGZ | Wait time used for scheduling | ||
| 80 | AFVVI - MGVRG | Operation Quantity | ||
| 81 | AFVVI - MINWE | Minimum Send-Ahead Quantity | ||
| 82 | AFVVI - SSAVD | Latest scheduled start: Execution (date) | ||
| 83 | AFVVI - SSAVZ | Latest scheduled start: Execution (time) | ||
| 84 | AFVVI - SSEDD | Latest scheduled finish: Execution (date) | ||
| 85 | AFVVI - SSEDZ | Latest scheduled finish: Execution (time) | ||
| 86 | AFVVI - SSELD | Latest scheduled finish: Wait time (date) | ||
| 87 | AFVVI - SSELZ | Latest scheduled finish: Wait time | ||
| 88 | AFVVI - WARTZ | Queue time used for scheduling | ||
| 89 | CAUFVD - AUTYP | Order category | ||
| 90 | CAUFVD - FLG_ARBEI | Indicator: Default value work is relevant | ||
| 91 | CAUFVD - REDKZ | Reduction indicator for scheduling | ||
| 92 | CAUFVTAB - AUTYP | Order category | ||
| 93 | CAUFVTAB - FLG_ARBEI | Indicator: Default value work is relevant | ||
| 94 | CAUFVTAB - REDKZ | Reduction indicator for scheduling | ||
| 95 | CMIMSG - MSGTY | Message Type | ||
| 96 | COAOBINF - AOBTX | Short text for the type of relationship | ||
| 97 | COAOBINF - INDBT_VOR1 | Field defined as in SY-TABIX | ||
| 98 | COAOBINF - INDBT_VOR2 | Field defined as in SY-TABIX | ||
| 99 | COOPRINF - ARBPL | Work center | ||
| 100 | COOPRINF - AUFNRD | Order Number | ||
| 101 | COOPRINF - INDBT | Field defined as in SY-TABIX | ||
| 102 | COOPRINF - UVORN | Suboperation | ||
| 103 | CXZEIT - BEARB | Processing time | ||
| 104 | CXZEIT - FSAV | Earliest operation start date | ||
| 105 | CXZEIT - SSAV | Latest start date of operation | ||
| 106 | CXZEIT - SSED | Latest finish of execution | ||
| 107 | CXZEIT - SSEL | Latest finish of wait time | ||
| 108 | CYAFVG_TAB - EPANF | Dispatched start date for operation | ||
| 109 | CYAFVG_TAB - EPANZ | Dispatched start time for operation | ||
| 110 | CYAFVG_TAB - EPEND | Dispatched finish date | ||
| 111 | CYAFVG_TAB - EPENZ | Dispatched finish time | ||
| 112 | CYCRPDATES - PLADATV | Start of planning period | ||
| 113 | CYCRPSTPRO - EARLIEST | Dispatch at earliest point in time | ||
| 114 | CYCRPSTPRO - FORWARD | Plan. direction forwards | ||
| 115 | CYCRPSTPRO - NOBREAKS | Planning in non-work periods | ||
| 116 | CYCRPSTPRO - QUEUETIME | Treatment of queue time on dispatching | ||
| 117 | CYFLD_AFVG - EPANF | Dispatched start date for operation | ||
| 118 | CYFLD_AFVG - EPANZ | Dispatched start time for operation | ||
| 119 | CYFLD_AFVG - EPEND | Dispatched finish date | ||
| 120 | CYFLD_AFVG - EPENZ | Dispatched finish time | ||
| 121 | JEST - STAT | Object status | ||
| 122 | KBED - KABRREST | Remaining capacity requirements for op. segment "tear down" | ||
| 123 | KBED - KBEAREST | Remaining capacity rqmts.for operation segment "Processing" | ||
| 124 | KBED - KRUEREST | Remaining capacity rqmts. for operation segment "Setup" | ||
| 125 | KBEDD - KABRREST | Remaining capacity requirements for op. segment "tear down" | ||
| 126 | KBEDD - KBEAREST | Remaining capacity rqmts.for operation segment "Processing" | ||
| 127 | KBEDD - KRUEREST | Remaining capacity rqmts. for operation segment "Setup" | ||
| 128 | KBEDI - KABRREST | Remaining capacity requirements for op. segment "tear down" | ||
| 129 | KBEDI - KBEAREST | Remaining capacity rqmts.for operation segment "Processing" | ||
| 130 | KBEDI - KRUEREST | Remaining capacity rqmts. for operation segment "Setup" | ||
| 131 | PRE_DEC - AUFNR_B | Order Number | ||
| 132 | PRE_DEC - AUFNR_V | Order Number | ||
| 133 | PRE_DEC - FLGNR_B | Sequence number | ||
| 134 | PRE_DEC - FLGNR_V | Sequence number | ||
| 135 | PRE_DEC - IPLPO_B | Index referring to record table for items | ||
| 136 | PRE_DEC - IPLPO_V | Index referring to record table for items | ||
| 137 | PRE_DEC - VORNR_B | Operation/Activity Number | ||
| 138 | PRE_DEC - VORNR_V | Operation/Activity Number | ||
| 139 | SYST - DATLO | ABAP System Field: Local Date of Current User | ||
| 140 | SYST - DATUM | ABAP System Field: Current Date of Application Server | ||
| 141 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 142 | SYST - TIMLO | ABAP System Field: Local Time of Current User | ||
| 143 | SYST - UZEIT | ABAP System Field: Current Time of Application Server | ||
| 144 | T006 - MSEHI | Unit of Measurement | ||
| 145 | T430 - KAPA | Indicator: Determine capacity requirements | ||
| 146 | T430 - PLNAW | Application of the task list | ||
| 147 | T430 - STEUS | Control key | ||
| 148 | T430 - TERM | Indicator: Scheduling | ||
| 149 | T499R - REDST | Reduction level | ||
| 150 | T499R - RSTRA | Reduction strategy per operation/activity | ||
| 151 | T499R - RUEBL | Indicator: Reduction by overlapping | ||
| 152 | T499R - RWART | Reduction in queue time (%) | ||
| 153 | T499R - WERKS | Plant |