Table/Structure Field list used by SAP ABAP Program LCXTMF15 (Scheduling: Flexible Activity Duration, Earliest/Latest Dates)
SAP ABAP Program
LCXTMF15 (Scheduling: Flexible Activity Duration, Earliest/Latest Dates) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
AFVC - FRSP | Earliest possible activity / Latest possible activity | |
2 | ![]() |
AFVGD - ARBID | Object ID of the resource | |
3 | ![]() |
AFVGI - FRSP | Earliest possible activity / Latest possible activity | |
4 | ![]() |
AFVGI - ARBID | Object ID of the resource | |
5 | ![]() |
CAUFVD - SICHZ_TRM | Scheduled float after production in days | |
6 | ![]() |
CAUFVD - WERKS | Plant | |
7 | ![]() |
CAUFVD - VORGZ_TRM | Scheduled float before production in days | |
8 | ![]() |
CAUFVD - VORGZ | Float before production (in days) | |
9 | ![]() |
CAUFVD - UPTER | Indicator: Change to Scheduled Dates | |
10 | ![]() |
CAUFVD - TYPKZ | Type of object causing the load (order category) | |
11 | ![]() |
CAUFVD - SICHZ | Float after production (in days) | |
12 | ![]() |
CAUFVD - MATNR | Material Number for Order | |
13 | ![]() |
CAUFVD - GSUZS | Scheduled Start (Time) | |
14 | ![]() |
CAUFVD - GLTRP | Basic finish date | |
15 | ![]() |
CAUFVD - GLTRS | Scheduled finish | |
16 | ![]() |
CAUFVD - GLUZP | Basic finish (time) | |
17 | ![]() |
CAUFVD - GLUZS | Scheduled finish time | |
18 | ![]() |
CAUFVD - GSTRP | Basic start date | |
19 | ![]() |
CAUFVD - GSTRS | Scheduled start | |
20 | ![]() |
CAUFVD - GSUZP | Basic start time | |
21 | ![]() |
CAUFVD - KAPVERSA | Version of Available Capacity | |
22 | ![]() |
CAUFVTAB - GLTRS | Scheduled finish | |
23 | ![]() |
CAUFVTAB - WERKS | Plant | |
24 | ![]() |
CAUFVTAB - VORGZ_TRM | Scheduled float before production in days | |
25 | ![]() |
CAUFVTAB - VORGZ | Float before production (in days) | |
26 | ![]() |
CAUFVTAB - UPTER | Indicator: Change to Scheduled Dates | |
27 | ![]() |
CAUFVTAB - SICHZ_TRM | Scheduled float after production in days | |
28 | ![]() |
CAUFVTAB - SICHZ | Float after production (in days) | |
29 | ![]() |
CAUFVTAB - KAPVERSA | Version of Available Capacity | |
30 | ![]() |
CAUFVTAB - GSUZS | Scheduled Start (Time) | |
31 | ![]() |
CAUFVTAB - GSUZP | Basic start time | |
32 | ![]() |
CAUFVTAB - GSTRS | Scheduled start | |
33 | ![]() |
CAUFVTAB - GSTRP | Basic start date | |
34 | ![]() |
CAUFVTAB - GLUZS | Scheduled finish time | |
35 | ![]() |
CAUFVTAB - GLUZP | Basic finish (time) | |
36 | ![]() |
CAUFVTAB - GLTRP | Basic finish date | |
37 | ![]() |
COCAUFVINF - MATNR | Material Number for Order | |
38 | ![]() |
COCAUFVINF - TYPKZ | Type of object causing the load (order category) | |
39 | ![]() |
CRHD - KAPID | Capacity ID | |
40 | ![]() |
CRHD - OBJID | Object ID of the resource | |
41 | ![]() |
CXAFAB_V - DAUER | Time interval between relationships | |
42 | ![]() |
CXAFVG_V1 - ARBID | Object ID of the resource | |
43 | ![]() |
CXAFVG_V2 - DDEHN | Indicator: flexible duration | |
44 | ![]() |
CXAFVG_V2 - ARBID | Object ID of the resource | |
45 | ![]() |
CXAFVG_V2 - KALID | Factory Calendar | |
46 | ![]() |
CXAFVG_V2 - FRSP | Earliest possible activity / Latest possible activity | |
47 | ![]() |
CXZEIT - BEARB | Processing time | |
48 | ![]() |
CXZEIT - SSSL | Latest start date for wait time | |
49 | ![]() |
CXZEIT - SSSB | Latest start for processing | |
50 | ![]() |
CXZEIT - SSSA | Latest start date for teardown | |
51 | ![]() |
CXZEIT - SSEL | Latest finish of wait time | |
52 | ![]() |
CXZEIT - SSED | Latest finish of execution | |
53 | ![]() |
CXZEIT - SSAV | Latest start date of operation | |
54 | ![]() |
CXZEIT - FSSL | Earliest start for wait time | |
55 | ![]() |
CXZEIT - FSSB | Earliest start for processing | |
56 | ![]() |
CXZEIT - FSSA | Earliest start for teardown | |
57 | ![]() |
CXZEIT - FSEL | Earliest finish of wait time | |
58 | ![]() |
CXZEIT - FSED | Earliest finish of execution time | |
59 | ![]() |
CXZEIT - FSAV | Earliest operation start date | |
60 | ![]() |
CXZEIT - BEAZE | Unit of measure for processing time | |
61 | ![]() |
CX_MARC - WERKS | Plant | |
62 | ![]() |
CX_MARC - TRANZ | Interoperation time | |
63 | ![]() |
CX_MARC - MATNR | Material Number | |
64 | ![]() |
CX_MARC - DZEIT | In-house production time | |
65 | ![]() |
CX_MARC - BEARZ | Processing time | |
66 | ![]() |
CX_MARC - RUEZT | Setup and teardown time | |
67 | ![]() |
KBED - TYPKZ | Type of object causing the load (order category) | |
68 | ![]() |
KBEDI - TYPKZ | Type of object causing the load (order category) | |
69 | ![]() |
RC65K - DATUB | Valid-to date | |
70 | ![]() |
RC65K - DATUV | Valid-From Date | |
71 | ![]() |
RC65K - KAPID | Capacity ID | |
72 | ![]() |
RC65K - VERSN | Available capacity version | |
73 | ![]() |
SYST - DATUM | ABAP System Field: Current Date of Application Server | |
74 | ![]() |
SYST - UZEIT | ABAP System Field: Current Time of Application Server | |
75 | ![]() |
SYST - TABIX | ABAP System Field: Row Index of Internal Tables | |
76 | ![]() |
SYST - DATLO | ABAP System Field: Local Date of Current User | |
77 | ![]() |
T001W - FABKL | Factory calendar key | |
78 | ![]() |
T006 - MSEHI | Unit of Measurement | |
79 | ![]() |
T430 - TERM | Indicator: Scheduling | |
80 | ![]() |
T482 - ECK_UHRZT | Basic dates with time of day | |
81 | ![]() |
T482 - NTERM | Only calculate capacity requirements | |
82 | ![]() |
TCX00 - DADJ2 | Adjust dates in lead time scheduling | |
83 | ![]() |
TCX00 - STVERG | Maximum number of days start date can be in the past |