Table/Structure Field list used by SAP ABAP Program LCXTMF11 (DISST_SET_MAT)
SAP ABAP Program
LCXTMF11 (DISST_SET_MAT) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
AFAB - DAUER | Time interval between relationships | |
2 | ![]() |
AFAB - DAUKZ | Indicator for the duration of the relationship | |
3 | ![]() |
AFAB - ZEINH | Unit for the time interval between relationships | |
4 | ![]() |
AFAB_INC - DAUER | Time interval between relationships | |
5 | ![]() |
AFAB_INC - DAUKZ | Indicator for the duration of the relationship | |
6 | ![]() |
AFAB_INC - ZEINH | Unit for the time interval between relationships | |
7 | ![]() |
AFVC - FRSP | Earliest possible activity / Latest possible activity | |
8 | ![]() |
AFVGD - FRSP | Earliest possible activity / Latest possible activity | |
9 | ![]() |
AFVGD - KNOBJ | Number of Object with Assigned Dependencies | |
10 | ![]() |
AFVGD - MGVRG | Operation Quantity | |
11 | ![]() |
AFVGD - RSTUF | Reduction level which reduces operation lead time | |
12 | ![]() |
AFVGI - FRSP | Earliest possible activity / Latest possible activity | |
13 | ![]() |
AFVGI - KNOBJ | Number of Object with Assigned Dependencies | |
14 | ![]() |
AFVGI - RSTUF | Reduction level which reduces operation lead time | |
15 | ![]() |
AFVVI - MGVRG | Operation Quantity | |
16 | ![]() |
CAUFVD - AUTYP | Order category | |
17 | ![]() |
CAUFVD - BREAKS | Indicator: Scheduling allowing for breaks | |
18 | ![]() |
CAUFVD - CUOBJ | Configuration (internal object number) | |
19 | ![]() |
CAUFVD - GLTRP | Basic finish date | |
20 | ![]() |
CAUFVD - GLUZP | Basic finish (time) | |
21 | ![]() |
CAUFVD - KAPVERSA | Version of Available Capacity | |
22 | ![]() |
CAUFVD - MATNR | Material Number for Order | |
23 | ![]() |
CAUFVD - SICHZ | Float after production (in days) | |
24 | ![]() |
CAUFVD - SICHZ_TRM | Scheduled float after production in days | |
25 | ![]() |
CAUFVD - ST_ARBID | Object ID | |
26 | ![]() |
CAUFVD - UPTER | Indicator: Change to Scheduled Dates | |
27 | ![]() |
CAUFVD - VORGZ | Float before production (in days) | |
28 | ![]() |
CAUFVD - VORGZ_TRM | Scheduled float before production in days | |
29 | ![]() |
CAUFVTAB - AUTYP | Order category | |
30 | ![]() |
CAUFVTAB - BREAKS | Indicator: Scheduling allowing for breaks | |
31 | ![]() |
CAUFVTAB - CUOBJ | Configuration (internal object number) | |
32 | ![]() |
CAUFVTAB - GLTRP | Basic finish date | |
33 | ![]() |
CAUFVTAB - GLUZP | Basic finish (time) | |
34 | ![]() |
CAUFVTAB - KAPVERSA | Version of Available Capacity | |
35 | ![]() |
CAUFVTAB - SICHZ | Float after production (in days) | |
36 | ![]() |
CAUFVTAB - SICHZ_TRM | Scheduled float after production in days | |
37 | ![]() |
CAUFVTAB - ST_ARBID | Object ID | |
38 | ![]() |
CAUFVTAB - UPTER | Indicator: Change to Scheduled Dates | |
39 | ![]() |
CAUFVTAB - VORGZ | Float before production (in days) | |
40 | ![]() |
CAUFVTAB - VORGZ_TRM | Scheduled float before production in days | |
41 | ![]() |
COCAUFVINF - MATNR | Material Number for Order | |
42 | ![]() |
CXAFAB_V - APLZL_VOR | Internal counter | |
43 | ![]() |
CXAFAB_V - AUFPL_NCH | No. identifying the network to which the successor belongs | |
44 | ![]() |
CXAFAB_V - AUFPL_VOR | No. identifying the network to which the predecessor belongs | |
45 | ![]() |
CXAFAB_V - DAUER | Time interval between relationships | |
46 | ![]() |
CXAFAB_V - PROVG | Key for defining time intervals in a relationship | |
47 | ![]() |
CXAFAB_V - ZEINH | Unit for the time interval between relationships | |
48 | ![]() |
CXAFVG_V1 - ARBID | Object ID of the resource | |
49 | ![]() |
CXAFVG_V1 - FLIES | Indicator: continuous flow production | |
50 | ![]() |
CXAFVG_V1 - KALID | Factory Calendar | |
51 | ![]() |
CXAFVG_V1 - MINWE | Minimum Send-Ahead Quantity | |
52 | ![]() |
CXAFVG_V1 - RSTRA | Reduction strategy per operation/activity | |
53 | ![]() |
CXAFVG_V1 - SPANZ | Actual number of splits | |
54 | ![]() |
CXAFVG_V1 - UEKAN | Optional overlapping | |
55 | ![]() |
CXAFVG_V1 - UEMUS | Required overlapping | |
56 | ![]() |
CXAFVG_V1 - WERKS | Plant | |
57 | ![]() |
CXAFVG_V1 - ZEITM | Unit for the minimum move time | |
58 | ![]() |
CXAFVG_V1 - ZEITN | Unit for the standard move time | |
59 | ![]() |
CXAFVG_V1 - ZTMIN | Minimum move time | |
60 | ![]() |
CXAFVG_V1 - ZTNOR | Standard move time | |
61 | ![]() |
CXAFVG_V1 - ZWMIN | Minimum queue time | |
62 | ![]() |
CXAFVG_V1 - ZWNOR | Standard queue time | |
63 | ![]() |
CXAFVG_V2 - RSTRA | Reduction strategy per operation/activity | |
64 | ![]() |
CXAFVG_V2 - WERKS | Plant | |
65 | ![]() |
CXZEIT - ABRUEST | Teardown time | |
66 | ![]() |
CXZEIT - ARUZE | Unit of measure for teardown | |
67 | ![]() |
CXZEIT - BEARB | Processing time | |
68 | ![]() |
CXZEIT - BEAZE | Unit of measure for processing time | |
69 | ![]() |
CXZEIT - FSAV | Earliest operation start date | |
70 | ![]() |
CXZEIT - FSED | Earliest finish of execution time | |
71 | ![]() |
CXZEIT - FSEL | Earliest finish of wait time | |
72 | ![]() |
CXZEIT - FSSA | Earliest start for teardown | |
73 | ![]() |
CXZEIT - FSSB | Earliest start for processing | |
74 | ![]() |
CXZEIT - FSSL | Earliest start for wait time | |
75 | ![]() |
CXZEIT - LIEGEN | Wait time | |
76 | ![]() |
CXZEIT - LIGZE | Unit of measure for wait time | |
77 | ![]() |
CXZEIT - RSTZE | Unit of measure for setup time | |
78 | ![]() |
CXZEIT - RUEST | Setup time | |
79 | ![]() |
CXZEIT - SPANZ | Actual number of splits | |
80 | ![]() |
CXZEIT - SSAV | Latest start date of operation | |
81 | ![]() |
CXZEIT - SSED | Latest finish of execution | |
82 | ![]() |
CXZEIT - SSEL | Latest finish of wait time | |
83 | ![]() |
CXZEIT - SSSA | Latest start date for teardown | |
84 | ![]() |
CXZEIT - SSSB | Latest start for processing | |
85 | ![]() |
CXZEIT - SSSL | Latest start date for wait time | |
86 | ![]() |
CXZEIT - TRANSP | Move time | |
87 | ![]() |
CXZEIT - TRAZE | Unit of measure for move time | |
88 | ![]() |
CXZEIT - WARTEN | Queue time | |
89 | ![]() |
CXZEIT - WRTZE | Unit of measure for queue time | |
90 | ![]() |
MDCPUTIME - EINZT | MRP run: Time for evaluating the operating time | |
91 | ![]() |
MDSTATS - EINZT | MRP run: Time for evaluating the operating time | |
92 | ![]() |
SYST - DATUM | ABAP System Field: Current Date of Application Server | |
93 | ![]() |
SYST - TABIX | ABAP System Field: Row Index of Internal Tables | |
94 | ![]() |
T001W - FABKL | Factory calendar key | |
95 | ![]() |
T006 - MSEHI | Unit of Measurement | |
96 | ![]() |
T430 - LIEF | External processing | |
97 | ![]() |
T430 - SCHEDEX | Indicator: Scheduling external op. with standard values | |
98 | ![]() |
T430 - TERM | Indicator: Scheduling | |
99 | ![]() |
T482 - ECK_UHRZT | Basic dates with time of day | |
100 | ![]() |
T499R - REDST | Reduction level | |
101 | ![]() |
T499R - RUEBL | Indicator: Reduction by overlapping | |
102 | ![]() |
TCX00 - AUF_SHIFT | Indicator: Shift order/network | |
103 | ![]() |
TCX00 - REDVS_S1 | Red. of floats before and after production (%) | |
104 | ![]() |
TCX00 - REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | |
105 | ![]() |
TCX00 - REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | |
106 | ![]() |
TCX00 - REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | |
107 | ![]() |
TCX00 - REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | |
108 | ![]() |
TCX00 - REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) |