Table/Structure Field list used by SAP ABAP Program LCXTMF11 (DISST_SET_MAT)
SAP ABAP Program
LCXTMF11 (DISST_SET_MAT) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AFAB - DAUER | Time interval between relationships | ||
| 2 | AFAB - DAUKZ | Indicator for the duration of the relationship | ||
| 3 | AFAB - ZEINH | Unit for the time interval between relationships | ||
| 4 | AFAB_INC - DAUER | Time interval between relationships | ||
| 5 | AFAB_INC - DAUKZ | Indicator for the duration of the relationship | ||
| 6 | AFAB_INC - ZEINH | Unit for the time interval between relationships | ||
| 7 | AFVC - FRSP | Earliest possible activity / Latest possible activity | ||
| 8 | AFVGD - FRSP | Earliest possible activity / Latest possible activity | ||
| 9 | AFVGD - KNOBJ | Number of Object with Assigned Dependencies | ||
| 10 | AFVGD - MGVRG | Operation Quantity | ||
| 11 | AFVGD - RSTUF | Reduction level which reduces operation lead time | ||
| 12 | AFVGI - FRSP | Earliest possible activity / Latest possible activity | ||
| 13 | AFVGI - KNOBJ | Number of Object with Assigned Dependencies | ||
| 14 | AFVGI - RSTUF | Reduction level which reduces operation lead time | ||
| 15 | AFVVI - MGVRG | Operation Quantity | ||
| 16 | CAUFVD - AUTYP | Order category | ||
| 17 | CAUFVD - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 18 | CAUFVD - CUOBJ | Configuration (internal object number) | ||
| 19 | CAUFVD - GLTRP | Basic finish date | ||
| 20 | CAUFVD - GLUZP | Basic finish (time) | ||
| 21 | CAUFVD - KAPVERSA | Version of Available Capacity | ||
| 22 | CAUFVD - MATNR | Material Number for Order | ||
| 23 | CAUFVD - SICHZ | Float after production (in days) | ||
| 24 | CAUFVD - SICHZ_TRM | Scheduled float after production in days | ||
| 25 | CAUFVD - ST_ARBID | Object ID | ||
| 26 | CAUFVD - UPTER | Indicator: Change to Scheduled Dates | ||
| 27 | CAUFVD - VORGZ | Float before production (in days) | ||
| 28 | CAUFVD - VORGZ_TRM | Scheduled float before production in days | ||
| 29 | CAUFVTAB - AUTYP | Order category | ||
| 30 | CAUFVTAB - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 31 | CAUFVTAB - CUOBJ | Configuration (internal object number) | ||
| 32 | CAUFVTAB - GLTRP | Basic finish date | ||
| 33 | CAUFVTAB - GLUZP | Basic finish (time) | ||
| 34 | CAUFVTAB - KAPVERSA | Version of Available Capacity | ||
| 35 | CAUFVTAB - SICHZ | Float after production (in days) | ||
| 36 | CAUFVTAB - SICHZ_TRM | Scheduled float after production in days | ||
| 37 | CAUFVTAB - ST_ARBID | Object ID | ||
| 38 | CAUFVTAB - UPTER | Indicator: Change to Scheduled Dates | ||
| 39 | CAUFVTAB - VORGZ | Float before production (in days) | ||
| 40 | CAUFVTAB - VORGZ_TRM | Scheduled float before production in days | ||
| 41 | COCAUFVINF - MATNR | Material Number for Order | ||
| 42 | CXAFAB_V - APLZL_VOR | Internal counter | ||
| 43 | CXAFAB_V - AUFPL_NCH | No. identifying the network to which the successor belongs | ||
| 44 | CXAFAB_V - AUFPL_VOR | No. identifying the network to which the predecessor belongs | ||
| 45 | CXAFAB_V - DAUER | Time interval between relationships | ||
| 46 | CXAFAB_V - PROVG | Key for defining time intervals in a relationship | ||
| 47 | CXAFAB_V - ZEINH | Unit for the time interval between relationships | ||
| 48 | CXAFVG_V1 - ARBID | Object ID of the resource | ||
| 49 | CXAFVG_V1 - FLIES | Indicator: continuous flow production | ||
| 50 | CXAFVG_V1 - KALID | Factory Calendar | ||
| 51 | CXAFVG_V1 - MINWE | Minimum Send-Ahead Quantity | ||
| 52 | CXAFVG_V1 - RSTRA | Reduction strategy per operation/activity | ||
| 53 | CXAFVG_V1 - SPANZ | Actual number of splits | ||
| 54 | CXAFVG_V1 - UEKAN | Optional overlapping | ||
| 55 | CXAFVG_V1 - UEMUS | Required overlapping | ||
| 56 | CXAFVG_V1 - WERKS | Plant | ||
| 57 | CXAFVG_V1 - ZEITM | Unit for the minimum move time | ||
| 58 | CXAFVG_V1 - ZEITN | Unit for the standard move time | ||
| 59 | CXAFVG_V1 - ZTMIN | Minimum move time | ||
| 60 | CXAFVG_V1 - ZTNOR | Standard move time | ||
| 61 | CXAFVG_V1 - ZWMIN | Minimum queue time | ||
| 62 | CXAFVG_V1 - ZWNOR | Standard queue time | ||
| 63 | CXAFVG_V2 - RSTRA | Reduction strategy per operation/activity | ||
| 64 | CXAFVG_V2 - WERKS | Plant | ||
| 65 | CXZEIT - ABRUEST | Teardown time | ||
| 66 | CXZEIT - ARUZE | Unit of measure for teardown | ||
| 67 | CXZEIT - BEARB | Processing time | ||
| 68 | CXZEIT - BEAZE | Unit of measure for processing time | ||
| 69 | CXZEIT - FSAV | Earliest operation start date | ||
| 70 | CXZEIT - FSED | Earliest finish of execution time | ||
| 71 | CXZEIT - FSEL | Earliest finish of wait time | ||
| 72 | CXZEIT - FSSA | Earliest start for teardown | ||
| 73 | CXZEIT - FSSB | Earliest start for processing | ||
| 74 | CXZEIT - FSSL | Earliest start for wait time | ||
| 75 | CXZEIT - LIEGEN | Wait time | ||
| 76 | CXZEIT - LIGZE | Unit of measure for wait time | ||
| 77 | CXZEIT - RSTZE | Unit of measure for setup time | ||
| 78 | CXZEIT - RUEST | Setup time | ||
| 79 | CXZEIT - SPANZ | Actual number of splits | ||
| 80 | CXZEIT - SSAV | Latest start date of operation | ||
| 81 | CXZEIT - SSED | Latest finish of execution | ||
| 82 | CXZEIT - SSEL | Latest finish of wait time | ||
| 83 | CXZEIT - SSSA | Latest start date for teardown | ||
| 84 | CXZEIT - SSSB | Latest start for processing | ||
| 85 | CXZEIT - SSSL | Latest start date for wait time | ||
| 86 | CXZEIT - TRANSP | Move time | ||
| 87 | CXZEIT - TRAZE | Unit of measure for move time | ||
| 88 | CXZEIT - WARTEN | Queue time | ||
| 89 | CXZEIT - WRTZE | Unit of measure for queue time | ||
| 90 | MDCPUTIME - EINZT | MRP run: Time for evaluating the operating time | ||
| 91 | MDSTATS - EINZT | MRP run: Time for evaluating the operating time | ||
| 92 | SYST - DATUM | ABAP System Field: Current Date of Application Server | ||
| 93 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 94 | T001W - FABKL | Factory calendar key | ||
| 95 | T006 - MSEHI | Unit of Measurement | ||
| 96 | T430 - LIEF | External processing | ||
| 97 | T430 - SCHEDEX | Indicator: Scheduling external op. with standard values | ||
| 98 | T430 - TERM | Indicator: Scheduling | ||
| 99 | T482 - ECK_UHRZT | Basic dates with time of day | ||
| 100 | T499R - REDST | Reduction level | ||
| 101 | T499R - RUEBL | Indicator: Reduction by overlapping | ||
| 102 | TCX00 - AUF_SHIFT | Indicator: Shift order/network | ||
| 103 | TCX00 - REDVS_S1 | Red. of floats before and after production (%) | ||
| 104 | TCX00 - REDVS_S2 | Reduction level 2: Red. of floats bef./after prod. (in %) | ||
| 105 | TCX00 - REDVS_S3 | Reduction level 3: Red. of floats bef./aft. prod. (in %) | ||
| 106 | TCX00 - REDVS_S4 | Reduction level 4: Red. of floats bef./aft. prod. (in %) | ||
| 107 | TCX00 - REDVS_S5 | Reduction level 5: Red. of floats bef./aft. prod. (in %) | ||
| 108 | TCX00 - REDVS_S6 | Reduction level 6: Red. of floats bef./aft. prod. (in %) |