Table/Structure Field list used by SAP ABAP Program LCXTMF01 (LCXTMF01)
SAP ABAP Program
LCXTMF01 (LCXTMF01) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AF61Z - OBTAB | Name of database table for object | ||
| 2 | AFAB - AOBAR | Type of relationship | ||
| 3 | AFAB - APLZL_NCH | Internal counter | ||
| 4 | AFAB - APLZL_VOR | Internal counter | ||
| 5 | AFAB - AUFPL_NCH | No. identifying the network to which the successor belongs | ||
| 6 | AFAB - AUFPL_VOR | No. identifying the network to which the predecessor belongs | ||
| 7 | AFAB - DAUER | Time interval between relationships | ||
| 8 | AFAB - DAUERMAX | Maximum time interval for relationship | ||
| 9 | AFAB - DAUKZ | Indicator for the duration of the relationship | ||
| 10 | AFAB - DAUTM | Relationship duration (in seconds) as result of scheduling | ||
| 11 | AFAB - FEABD | Earliest finish date for the relationship | ||
| 12 | AFAB - FEABZ | Earliest finish time for the relationship | ||
| 13 | AFAB - FSABD | Earliest start date for the relationship | ||
| 14 | AFAB - FSABZ | Earliest start time for the relationship | ||
| 15 | AFAB - PROVG | Key for defining time intervals in a relationship | ||
| 16 | AFAB - SEABD | Latest finish date of the relationship | ||
| 17 | AFAB - SEABZ | Latest finish time of the relationship | ||
| 18 | AFAB - SSABD | Latest start date of the relationship | ||
| 19 | AFAB - SSABZ | Latest start time of the relationship | ||
| 20 | AFAB - ZEINH | Unit for the time interval between relationships | ||
| 21 | AFABD - AOBAR | Type of relationship | ||
| 22 | AFABD - APLZL_NCH | Internal counter | ||
| 23 | AFABD - APLZL_VOR | Internal counter | ||
| 24 | AFABD - AUFPL_NCH | No. identifying the network to which the successor belongs | ||
| 25 | AFABD - AUFPL_VOR | No. identifying the network to which the predecessor belongs | ||
| 26 | AFABD - DAUERMAX | Maximum time interval for relationship | ||
| 27 | AFABD - DAUTM | Relationship duration (in seconds) as result of scheduling | ||
| 28 | AFABD - FEABD | Earliest finish date for the relationship | ||
| 29 | AFABD - FEABZ | Earliest finish time for the relationship | ||
| 30 | AFABD - FSABD | Earliest start date for the relationship | ||
| 31 | AFABD - FSABZ | Earliest start time for the relationship | ||
| 32 | AFABD - NETZPL_NCH | Network number | ||
| 33 | AFABD - NETZPL_VOR | Network number | ||
| 34 | AFABD - PROVG | Key for defining time intervals in a relationship | ||
| 35 | AFABD - SEABD | Latest finish date of the relationship | ||
| 36 | AFABD - SEABZ | Latest finish time of the relationship | ||
| 37 | AFABD - SSABD | Latest start date of the relationship | ||
| 38 | AFABD - SSABZ | Latest start time of the relationship | ||
| 39 | AFABD - VORN1 | Operation/Activity Number | ||
| 40 | AFABD - VORN2 | Operation/Activity Number | ||
| 41 | AFABD - ZEINH | Unit for the time interval between relationships | ||
| 42 | AFAB_INC - DAUER | Time interval between relationships | ||
| 43 | AFAB_INC - DAUERMAX | Maximum time interval for relationship | ||
| 44 | AFAB_INC - DAUKZ | Indicator for the duration of the relationship | ||
| 45 | AFAB_INC - DAUTM | Relationship duration (in seconds) as result of scheduling | ||
| 46 | AFAB_INC - FEABD | Earliest finish date for the relationship | ||
| 47 | AFAB_INC - FEABZ | Earliest finish time for the relationship | ||
| 48 | AFAB_INC - FSABD | Earliest start date for the relationship | ||
| 49 | AFAB_INC - FSABZ | Earliest start time for the relationship | ||
| 50 | AFAB_INC - PROVG | Key for defining time intervals in a relationship | ||
| 51 | AFAB_INC - SEABD | Latest finish date of the relationship | ||
| 52 | AFAB_INC - SEABZ | Latest finish time of the relationship | ||
| 53 | AFAB_INC - SSABD | Latest start date of the relationship | ||
| 54 | AFAB_INC - SSABZ | Latest start time of the relationship | ||
| 55 | AFAB_INC - ZEINH | Unit for the time interval between relationships | ||
| 56 | AFFL - PLNFL | Sequence | ||
| 57 | AFFL_INC - PLNFL | Sequence | ||
| 58 | AFPO - PLNUM | Planned order number | ||
| 59 | AFPO - PWERK | Planning plant for the order | ||
| 60 | AFPOD - PLNUM | Planned order number | ||
| 61 | AFPOD - PWERK | Planning plant for the order | ||
| 62 | AFPOD - SOPNR | SOP order number | ||
| 63 | AFPO_INC - PLNUM | Planned order number | ||
| 64 | AFPO_INC - PWERK | Planning plant for the order | ||
| 65 | AFVC - FRSP | Earliest possible activity / Latest possible activity | ||
| 66 | AFVGD - APLFL | Sequence | ||
| 67 | AFVGD - APLZL | General counter for order | ||
| 68 | AFVGD - ARUZE | Unit of measure for teardown | ||
| 69 | AFVGD - ASKUM | Cumulative Scrap Qty of Subsequent Reporting Pts (Cur. Per.) | ||
| 70 | AFVGD - ASVRG | Operation scrap | ||
| 71 | AFVGD - AUFPL | Routing number of operations in the order | ||
| 72 | AFVGD - BEARP | Processing time (forecast) | ||
| 73 | AFVGD - BEAZE | Unit of measure for processing time | ||
| 74 | AFVGD - BEAZP | Unit of processing time (Forecast) | ||
| 75 | AFVGD - FRSP | Earliest possible activity / Latest possible activity | ||
| 76 | AFVGD - FSAVD | Earliest scheduled start: Execution (date) | ||
| 77 | AFVGD - FSAVZ | Earliest scheduled start: Execution (time) | ||
| 78 | AFVGD - FSEDZ | Earliest scheduled finish: Execution (time) | ||
| 79 | AFVGD - FSELZ | Earliest scheduled finish: Wait (time) | ||
| 80 | AFVGD - INDBT | Field defined as in SY-TABIX | ||
| 81 | AFVGD - LIGZE | Unit of measure for wait time | ||
| 82 | AFVGD - LOSME | Base Unit of Measure | ||
| 83 | AFVGD - LOSVG | Operation quantity in order unit of measure | ||
| 84 | AFVGD - MGVRG | Operation Quantity | ||
| 85 | AFVGD - PUFFP | Free float (from forecast) | ||
| 86 | AFVGD - PUFFR | Free float | ||
| 87 | AFVGD - PUFGP | Total float (from forecast) | ||
| 88 | AFVGD - PUFGS | Total float | ||
| 89 | AFVGD - RSTUF | Reduction level which reduces operation lead time | ||
| 90 | AFVGD - RSTZE | Unit of measure for setup time | ||
| 91 | AFVGD - SPANZ | Actual number of splits | ||
| 92 | AFVGD - SSAVZ | Latest scheduled start: Execution (time) | ||
| 93 | AFVGD - SSEDZ | Latest scheduled finish: Execution (time) | ||
| 94 | AFVGD - SSELZ | Latest scheduled finish: Wait time | ||
| 95 | AFVGD - TRAZE | Unit of measure for move time | ||
| 96 | AFVGD - VORNR | Operation/Activity Number | ||
| 97 | AFVGD - WRTZE | Unit of measure for queue time | ||
| 98 | AFVGI - APLFL | Sequence | ||
| 99 | AFVGI - FRSP | Earliest possible activity / Latest possible activity | ||
| 100 | AFVGI - RSTUF | Reduction level which reduces operation lead time | ||
| 101 | AFVGI - SPANZ | Actual number of splits | ||
| 102 | AFVGI - VORNR | Operation/Activity Number | ||
| 103 | AFVKI - APLZL | General counter for order | ||
| 104 | AFVKI - AUFPL | Routing number of operations in the order | ||
| 105 | AFVVI - ARUZE | Unit of measure for teardown | ||
| 106 | AFVVI - ASVRG | Operation scrap | ||
| 107 | AFVVI - BEARP | Processing time (forecast) | ||
| 108 | AFVVI - BEAZE | Unit of measure for processing time | ||
| 109 | AFVVI - BEAZP | Unit of processing time (Forecast) | ||
| 110 | AFVVI - FSAVD | Earliest scheduled start: Execution (date) | ||
| 111 | AFVVI - FSAVZ | Earliest scheduled start: Execution (time) | ||
| 112 | AFVVI - FSEDZ | Earliest scheduled finish: Execution (time) | ||
| 113 | AFVVI - FSELZ | Earliest scheduled finish: Wait (time) | ||
| 114 | AFVVI - LIGZE | Unit of measure for wait time | ||
| 115 | AFVVI - MGVRG | Operation Quantity | ||
| 116 | AFVVI - PUFFP | Free float (from forecast) | ||
| 117 | AFVVI - PUFFR | Free float | ||
| 118 | AFVVI - PUFGP | Total float (from forecast) | ||
| 119 | AFVVI - PUFGS | Total float | ||
| 120 | AFVVI - RSTZE | Unit of measure for setup time | ||
| 121 | AFVVI - SSAVZ | Latest scheduled start: Execution (time) | ||
| 122 | AFVVI - SSEDZ | Latest scheduled finish: Execution (time) | ||
| 123 | AFVVI - SSELZ | Latest scheduled finish: Wait time | ||
| 124 | AFVVI - TRAZE | Unit of measure for move time | ||
| 125 | AFVVI - WRTZE | Unit of measure for queue time | ||
| 126 | CAUFVD - APLZT | General counter for order | ||
| 127 | CAUFVD - AUART | Order Type | ||
| 128 | CAUFVD - AUFLD | Date of BOM Explosion/Routing Transfer | ||
| 129 | CAUFVD - AUFNR | Order Number | ||
| 130 | CAUFVD - AUFPL | Routing number of operations in the order | ||
| 131 | CAUFVD - AUFPT | Routing number of operations in the order | ||
| 132 | CAUFVD - AUTYP | Order category | ||
| 133 | CAUFVD - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 134 | CAUFVD - CFB_BBDPI | Best-Before Date (BBD)/ Shelf Life Expiration Date (SLED) | ||
| 135 | CAUFVD - CFB_DATOFM | Date of Manufacture | ||
| 136 | CAUFVD - CFB_LZEIH | Unit for maximum storage period | ||
| 137 | CAUFVD - CFB_MAXLZ | Maximum storage period | ||
| 138 | CAUFVD - CUOBJ | Configuration (internal object number) | ||
| 139 | CAUFVD - DISPO | MRP controller for the order | ||
| 140 | CAUFVD - EXT_AUFNR | Order Number | ||
| 141 | CAUFVD - FEVOR | Production Supervisor | ||
| 142 | CAUFVD - FLG_TRME | Indicator: Scheduling is carried out at least once | ||
| 143 | CAUFVD - FREIZ | Release period (in days) | ||
| 144 | CAUFVD - FTRMS | Scheduled release date | ||
| 145 | CAUFVD - FTRPS | Scheduled release date (forecast) | ||
| 146 | CAUFVD - GAMNG | Total order quantity | ||
| 147 | CAUFVD - GASMG | Total scrap quantity in the order | ||
| 148 | CAUFVD - GLTPP | Finish date (forecast) | ||
| 149 | CAUFVD - GLTPS | Scheduled forecast finish | ||
| 150 | CAUFVD - GLTRP | Basic finish date | ||
| 151 | CAUFVD - GLTRS | Scheduled finish | ||
| 152 | CAUFVD - GLUPP | Forecast finish (time) | ||
| 153 | CAUFVD - GLUPS | Scheduled forecast finish time | ||
| 154 | CAUFVD - GLUZP | Basic finish (time) | ||
| 155 | CAUFVD - GLUZS | Scheduled finish time | ||
| 156 | CAUFVD - GMEIN | Common unit of measure for all order items | ||
| 157 | CAUFVD - GSTPP | Forecast start date | ||
| 158 | CAUFVD - GSTPS | Scheduled forecast start | ||
| 159 | CAUFVD - GSTRP | Basic start date | ||
| 160 | CAUFVD - GSTRS | Scheduled start | ||
| 161 | CAUFVD - GSUPP | Forecast start (time) | ||
| 162 | CAUFVD - GSUPS | Scheduled start time (Forecast) | ||
| 163 | CAUFVD - GSUZP | Basic start time | ||
| 164 | CAUFVD - GSUZS | Scheduled Start (Time) | ||
| 165 | CAUFVD - INDBT | Field defined as in SY-TABIX | ||
| 166 | CAUFVD - KAPVERSA | Version of Available Capacity | ||
| 167 | CAUFVD - LOSGR | Costing lot size | ||
| 168 | CAUFVD - MATNR | Material Number for Order | ||
| 169 | CAUFVD - OBJNR | Object number | ||
| 170 | CAUFVD - PLART | Basis for scheduling | ||
| 171 | CAUFVD - PLNAL | Group Counter | ||
| 172 | CAUFVD - PLNME | Task list unit of measure | ||
| 173 | CAUFVD - PLNNR | Key for Task List Group | ||
| 174 | CAUFVD - PLNTY | Task List Type | ||
| 175 | CAUFVD - PNETENDD | Outline finish of collective order (date) | ||
| 176 | CAUFVD - PNETENDT | Outline finish time | ||
| 177 | CAUFVD - PNETSTARTD | Outline start of collective network (date) | ||
| 178 | CAUFVD - PNETSTARTT | Start time of a collective order | ||
| 179 | CAUFVD - RDKZP | Reduction indicator for scheduling (forecast) | ||
| 180 | CAUFVD - REDKZ | Reduction indicator for scheduling | ||
| 181 | CAUFVD - SFCPF | Production Scheduling Profile | ||
| 182 | CAUFVD - SICHZ | Float after production (in days) | ||
| 183 | CAUFVD - SICHZ_TRM | Scheduled float after production in days | ||
| 184 | CAUFVD - TERHW | Scheduling note from order scheduling | ||
| 185 | CAUFVD - TMBAS | Set of dates for network | ||
| 186 | CAUFVD - TRMDT | Date of the last scheduling | ||
| 187 | CAUFVD - TYPKZ | Type of object causing the load (order category) | ||
| 188 | CAUFVD - UPTER | Indicator: Change to Scheduled Dates | ||
| 189 | CAUFVD - VORGZ | Float before production (in days) | ||
| 190 | CAUFVD - VORGZ_TRM | Scheduled float before production in days | ||
| 191 | CAUFVD - WERKS | Plant | ||
| 192 | CAUFVTAB - APLZT | General counter for order | ||
| 193 | CAUFVTAB - AUART | Order Type | ||
| 194 | CAUFVTAB - AUFLD | Date of BOM Explosion/Routing Transfer | ||
| 195 | CAUFVTAB - AUFNR | Order Number | ||
| 196 | CAUFVTAB - AUFPL | Routing number of operations in the order | ||
| 197 | CAUFVTAB - AUFPT | Routing number of operations in the order | ||
| 198 | CAUFVTAB - AUTYP | Order category | ||
| 199 | CAUFVTAB - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 200 | CAUFVTAB - CFB_BBDPI | Best-Before Date (BBD)/ Shelf Life Expiration Date (SLED) | ||
| 201 | CAUFVTAB - CFB_DATOFM | Date of Manufacture | ||
| 202 | CAUFVTAB - CFB_LZEIH | Unit for maximum storage period | ||
| 203 | CAUFVTAB - CFB_MAXLZ | Maximum storage period | ||
| 204 | CAUFVTAB - CUOBJ | Configuration (internal object number) | ||
| 205 | CAUFVTAB - DISPO | MRP controller for the order | ||
| 206 | CAUFVTAB - FEVOR | Production Supervisor | ||
| 207 | CAUFVTAB - FREIZ | Release period (in days) | ||
| 208 | CAUFVTAB - FTRMS | Scheduled release date | ||
| 209 | CAUFVTAB - FTRPS | Scheduled release date (forecast) | ||
| 210 | CAUFVTAB - GAMNG | Total order quantity | ||
| 211 | CAUFVTAB - GASMG | Total scrap quantity in the order | ||
| 212 | CAUFVTAB - GLTPP | Finish date (forecast) | ||
| 213 | CAUFVTAB - GLTPS | Scheduled forecast finish | ||
| 214 | CAUFVTAB - GLTRP | Basic finish date | ||
| 215 | CAUFVTAB - GLTRS | Scheduled finish | ||
| 216 | CAUFVTAB - GLUPP | Forecast finish (time) | ||
| 217 | CAUFVTAB - GLUPS | Scheduled forecast finish time | ||
| 218 | CAUFVTAB - GLUZP | Basic finish (time) | ||
| 219 | CAUFVTAB - GLUZS | Scheduled finish time | ||
| 220 | CAUFVTAB - GMEIN | Common unit of measure for all order items | ||
| 221 | CAUFVTAB - GSTPP | Forecast start date | ||
| 222 | CAUFVTAB - GSTPS | Scheduled forecast start | ||
| 223 | CAUFVTAB - GSTRP | Basic start date | ||
| 224 | CAUFVTAB - GSTRS | Scheduled start | ||
| 225 | CAUFVTAB - GSUPP | Forecast start (time) | ||
| 226 | CAUFVTAB - GSUPS | Scheduled start time (Forecast) | ||
| 227 | CAUFVTAB - GSUZP | Basic start time | ||
| 228 | CAUFVTAB - GSUZS | Scheduled Start (Time) | ||
| 229 | CAUFVTAB - KAPVERSA | Version of Available Capacity | ||
| 230 | CAUFVTAB - OBJNR | Object number | ||
| 231 | CAUFVTAB - PLART | Basis for scheduling | ||
| 232 | CAUFVTAB - PLNAL | Group Counter | ||
| 233 | CAUFVTAB - PLNME | Task list unit of measure | ||
| 234 | CAUFVTAB - PLNNR | Key for Task List Group | ||
| 235 | CAUFVTAB - PLNTY | Task List Type | ||
| 236 | CAUFVTAB - PNETENDD | Outline finish of collective order (date) | ||
| 237 | CAUFVTAB - PNETENDT | Outline finish time | ||
| 238 | CAUFVTAB - PNETSTARTD | Outline start of collective network (date) | ||
| 239 | CAUFVTAB - PNETSTARTT | Start time of a collective order | ||
| 240 | CAUFVTAB - RDKZP | Reduction indicator for scheduling (forecast) | ||
| 241 | CAUFVTAB - REDKZ | Reduction indicator for scheduling | ||
| 242 | CAUFVTAB - SFCPF | Production Scheduling Profile | ||
| 243 | CAUFVTAB - SICHZ | Float after production (in days) | ||
| 244 | CAUFVTAB - SICHZ_TRM | Scheduled float after production in days | ||
| 245 | CAUFVTAB - TERHW | Scheduling note from order scheduling | ||
| 246 | CAUFVTAB - TRMDT | Date of the last scheduling | ||
| 247 | CAUFVTAB - UPTER | Indicator: Change to Scheduled Dates | ||
| 248 | CAUFVTAB - VORGZ | Float before production (in days) | ||
| 249 | CAUFVTAB - VORGZ_TRM | Scheduled float before production in days | ||
| 250 | CAUFVTAB - WERKS | Plant | ||
| 251 | CFB_BBD_PPPI_DATA - CFB_BBDPI | Best-Before Date (BBD)/ Shelf Life Expiration Date (SLED) | ||
| 252 | CFB_BBD_PPPI_DATA - CFB_DATOFM | Date of Manufacture | ||
| 253 | CFB_BBD_PPPI_DATA - CFB_LZEIH | Unit for maximum storage period | ||
| 254 | CFB_BBD_PPPI_DATA - CFB_MAXLZ | Maximum storage period | ||
| 255 | COAFPOINF - SOPNR | SOP order number | ||
| 256 | COAOBINF - NETZPL_NCH | Network number | ||
| 257 | COAOBINF - NETZPL_VOR | Network number | ||
| 258 | COAOBINF - VORN1 | Operation/Activity Number | ||
| 259 | COAOBINF - VORN2 | Operation/Activity Number | ||
| 260 | COCAUFVINF - FLG_TRME | Indicator: Scheduling is carried out at least once | ||
| 261 | COCAUFVINF - INDBT | Field defined as in SY-TABIX | ||
| 262 | COCAUFVINF - LOSGR | Costing lot size | ||
| 263 | COCAUFVINF - MATNR | Material Number for Order | ||
| 264 | COCAUFVINF - TMBAS | Set of dates for network | ||
| 265 | COCAUFVINF - TYPKZ | Type of object causing the load (order category) | ||
| 266 | COOPRINF - ASKUM | Cumulative Scrap Qty of Subsequent Reporting Pts (Cur. Per.) | ||
| 267 | COOPRINF - INDBT | Field defined as in SY-TABIX | ||
| 268 | COOPRINF - LOSME | Base Unit of Measure | ||
| 269 | COOPRINF - LOSVG | Operation quantity in order unit of measure | ||
| 270 | COVERSINF - EXT_AUFNR | Order Number | ||
| 271 | CXAFAB_V - APLZL_NCH | Internal counter | ||
| 272 | CXAFAB_V - APLZL_VOR | Internal counter | ||
| 273 | CXAFAB_V - AUFPL_NCH | No. identifying the network to which the successor belongs | ||
| 274 | CXAFAB_V - AUFPL_VOR | No. identifying the network to which the predecessor belongs | ||
| 275 | CXAFAB_V - DAUER | Time interval between relationships | ||
| 276 | CXAFAB_V - ZEINH | Unit for the time interval between relationships | ||
| 277 | CXAFVG_V1 - FLIES | Indicator: continuous flow production | ||
| 278 | CXAFVG_V1 - UEKAN | Optional overlapping | ||
| 279 | CXAFVG_V1 - UEMUS | Required overlapping | ||
| 280 | CXZEIT - ABRUEST | Teardown time | ||
| 281 | CXZEIT - ARUZE | Unit of measure for teardown | ||
| 282 | CXZEIT - BEARB | Processing time | ||
| 283 | CXZEIT - BEAZE | Unit of measure for processing time | ||
| 284 | CXZEIT - FSAV | Earliest operation start date | ||
| 285 | CXZEIT - FSED | Earliest finish of execution time | ||
| 286 | CXZEIT - FSEL | Earliest finish of wait time | ||
| 287 | CXZEIT - FSSA | Earliest start for teardown | ||
| 288 | CXZEIT - FSSB | Earliest start for processing | ||
| 289 | CXZEIT - FSSL | Earliest start for wait time | ||
| 290 | CXZEIT - LIEGEN | Wait time | ||
| 291 | CXZEIT - LIGZE | Unit of measure for wait time | ||
| 292 | CXZEIT - RSTZE | Unit of measure for setup time | ||
| 293 | CXZEIT - RUEST | Setup time | ||
| 294 | CXZEIT - SPANZ | Actual number of splits | ||
| 295 | CXZEIT - SSAV | Latest start date of operation | ||
| 296 | CXZEIT - SSED | Latest finish of execution | ||
| 297 | CXZEIT - SSEL | Latest finish of wait time | ||
| 298 | CXZEIT - SSSA | Latest start date for teardown | ||
| 299 | CXZEIT - SSSB | Latest start for processing | ||
| 300 | CXZEIT - SSSL | Latest start date for wait time | ||
| 301 | CXZEIT - TRANSP | Move time | ||
| 302 | CXZEIT - TRAZE | Unit of measure for move time | ||
| 303 | CXZEIT - WARTEN | Queue time | ||
| 304 | CXZEIT - WRTZE | Unit of measure for queue time | ||
| 305 | CX_MARC - BASMG | Base quantity | ||
| 306 | CX_MARC - BEARZ | Processing time | ||
| 307 | CX_MARC - DZEIT | In-house production time | ||
| 308 | CX_MARC - FEVOR | Production Supervisor | ||
| 309 | CX_MARC - FHORI | Scheduling Margin Key for Floats | ||
| 310 | CX_MARC - MATNR | Material Number | ||
| 311 | CX_MARC - RUEZT | Setup and teardown time | ||
| 312 | CX_MARC - TRANZ | Interoperation time | ||
| 313 | CX_MARC - WERKS | Plant | ||
| 314 | EMARC - BASMG | Base quantity | ||
| 315 | EMARC - BEARZ | Processing time | ||
| 316 | EMARC - DZEIT | In-house production time | ||
| 317 | EMARC - FEVOR | Production Supervisor | ||
| 318 | EMARC - FHORI | Scheduling Margin Key for Floats | ||
| 319 | EMARC - RUEZT | Setup and teardown time | ||
| 320 | EMARC - TRANZ | Interoperation time | ||
| 321 | EMARC1 - BASMG | Base quantity | ||
| 322 | EMARC1 - BEARZ | Processing time | ||
| 323 | EMARC1 - DZEIT | In-house production time | ||
| 324 | EMARC1 - FEVOR | Production Supervisor | ||
| 325 | EMARC1 - FHORI | Scheduling Margin Key for Floats | ||
| 326 | EMARC1 - RUEZT | Setup and teardown time | ||
| 327 | EMARC1 - TRANZ | Interoperation time | ||
| 328 | INOB - OBTAB | Name of database table for object | ||
| 329 | KAKO - VERSA | Active version of available capacity | ||
| 330 | KBED - APLZL | General counter for order | ||
| 331 | KBED - AUFPL | Routing number of operations in the order | ||
| 332 | KBED - TYPKZ | Type of object causing the load (order category) | ||
| 333 | KBEDD - APLZL | General counter for order | ||
| 334 | KBEDD - AUFPL | Routing number of operations in the order | ||
| 335 | KBEDI - APLZL | General counter for order | ||
| 336 | KBEDI - AUFPL | Routing number of operations in the order | ||
| 337 | KBEDI - TYPKZ | Type of object causing the load (order category) | ||
| 338 | KBKO - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 339 | KBKO - GLTRS | Scheduled finish | ||
| 340 | KBKO - GLUZS | Earliest finish of operation (time) | ||
| 341 | KBKO - GSTRS | Scheduled start | ||
| 342 | KBKO - GSUZS | Earliest scheduled start: Execution (time) | ||
| 343 | KBKO - PLAUF | Date for routing transfer | ||
| 344 | KBKO - PLNAL | Group Counter | ||
| 345 | KBKO - PLNNR | Key for Task List Group | ||
| 346 | KBKO - PLNTY | Task List Type | ||
| 347 | KBKO - REDKZ | Reduction indicator for scheduling | ||
| 348 | KBKO - TERKZ | Scheduling type | ||
| 349 | KBKO - TRMDT | Date of the last scheduling | ||
| 350 | KBKO - TYPKZ | Type of object causing the load (order category) | ||
| 351 | KBKOI - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 352 | KBKOI - GLTRS | Scheduled finish | ||
| 353 | KBKOI - GLUZS | Earliest finish of operation (time) | ||
| 354 | KBKOI - GSTRS | Scheduled start | ||
| 355 | KBKOI - GSUZS | Earliest scheduled start: Execution (time) | ||
| 356 | KBKOI - PLAUF | Date for routing transfer | ||
| 357 | KBKOI - PLNAL | Group Counter | ||
| 358 | KBKOI - PLNNR | Key for Task List Group | ||
| 359 | KBKOI - PLNTY | Task List Type | ||
| 360 | KBKOI - REDKZ | Reduction indicator for scheduling | ||
| 361 | KBKOI - TERKZ | Scheduling type | ||
| 362 | KBKOI - TRMDT | Date of the last scheduling | ||
| 363 | KBKOI - TYPKZ | Type of object causing the load (order category) | ||
| 364 | MARC - BASMG | Base quantity | ||
| 365 | MARC - BEARZ | Processing time | ||
| 366 | MARC - DZEIT | In-house production time | ||
| 367 | MARC - FEVOR | Production Supervisor | ||
| 368 | MARC - FHORI | Scheduling Margin Key for Floats | ||
| 369 | MARC - MATNR | Material Number | ||
| 370 | MARC - RUEZT | Setup and teardown time | ||
| 371 | MARC - TRANZ | Interoperation time | ||
| 372 | MARC - WERKS | Plant | ||
| 373 | MDCPUTIME - EINZT | MRP run: Time for evaluating the operating time | ||
| 374 | MDSTATS - EINZT | MRP run: Time for evaluating the operating time | ||
| 375 | PLAF - PLNUM | Planned order number | ||
| 376 | PLSC - PLSCN | Planning Scenario of Long-Term Planning | ||
| 377 | PRTE - PENDE | WBS element: Basic finish date | ||
| 378 | PRTE - PETRM | Scheduled finish (Basic) | ||
| 379 | PRTE - POSNR | WBS Element | ||
| 380 | PRTE - PSTRM | Scheduled start (Basic) | ||
| 381 | PRTE - PSTRT | WBS element: Basic start date | ||
| 382 | PRTEB - PENDE | WBS element: Basic finish date | ||
| 383 | PRTEB - PETRM | Scheduled finish (Basic) | ||
| 384 | PRTEB - POSNR | WBS Element | ||
| 385 | PRTEB - PSTRM | Scheduled start (Basic) | ||
| 386 | PRTEB - PSTRT | WBS element: Basic start date | ||
| 387 | PRTEINC - PENDE | WBS element: Basic finish date | ||
| 388 | PRTEINC - PETRM | Scheduled finish (Basic) | ||
| 389 | PRTEINC - PSTRM | Scheduled start (Basic) | ||
| 390 | PRTEINC - PSTRT | WBS element: Basic start date | ||
| 391 | RCLST - OBJECT | Data objects of a task list | ||
| 392 | SAUF - SAFNR | SOP order number | ||
| 393 | SCAL - DATE | Date for public holiday and factory calendars | ||
| 394 | SYST - DATLO | ABAP System Field: Local Date of Current User | ||
| 395 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 396 | SYST - UZEIT | ABAP System Field: Current Time of Application Server | ||
| 397 | T001W - FABKL | Factory calendar key | ||
| 398 | T006 - MSEHI | Unit of Measurement | ||
| 399 | T430 - TERM | Indicator: Scheduling | ||
| 400 | T482 - ECK_UHRZT | Basic dates with time of day | ||
| 401 | T482 - RUEKT | Backward scheduling | ||
| 402 | T482 - TERMKZ | Scheduling type | ||
| 403 | T482 - VORWT | Forward scheduling | ||
| 404 | TCX00 - AUFTA | Order type in capacity planning | ||
| 405 | TCX00 - DADJ2 | Adjust dates in lead time scheduling | ||
| 406 | TCX00 - RED_ART | Reduction type | ||
| 407 | TCX00 - VAGRP | Production Supervisor | ||
| 408 | TCX00 - WERKS | Plant | ||
| 409 | TJ01 - VRGNG | Business Transaction |