Table/Structure Field list used by SAP ABAP Program LCXTMF01 (LCXTMF01)
SAP ABAP Program LCXTMF01 (LCXTMF01) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
1 | Table/Structure Field | AF61Z - OBTAB | Name of database table for object | |
2 | Table/Structure Field | AFAB - AOBAR | Type of relationship | |
3 | Table/Structure Field | AFAB - APLZL_NCH | Internal counter | |
4 | Table/Structure Field | AFAB - APLZL_VOR | Internal counter | |
5 | Table/Structure Field | AFAB - AUFPL_NCH | No. identifying the network to which the successor belongs | |
6 | Table/Structure Field | AFAB - AUFPL_VOR | No. identifying the network to which the predecessor belongs | |
7 | Table/Structure Field | AFAB - DAUER | Time interval between relationships | |
8 | Table/Structure Field | AFAB - DAUERMAX | Maximum time interval for relationship | |
9 | Table/Structure Field | AFAB - DAUKZ | Indicator for the duration of the relationship | |
10 | Table/Structure Field | AFAB - DAUTM | Relationship duration (in seconds) as result of scheduling | |
11 | Table/Structure Field | AFAB - FEABD | Earliest finish date for the relationship | |
12 | Table/Structure Field | AFAB - FEABZ | Earliest finish time for the relationship | |
13 | Table/Structure Field | AFAB - FSABD | Earliest start date for the relationship | |
14 | Table/Structure Field | AFAB - FSABZ | Earliest start time for the relationship | |
15 | Table/Structure Field | AFAB - PROVG | Key for defining time intervals in a relationship | |
16 | Table/Structure Field | AFAB - SEABD | Latest finish date of the relationship | |
17 | Table/Structure Field | AFAB - SEABZ | Latest finish time of the relationship | |
18 | Table/Structure Field | AFAB - SSABD | Latest start date of the relationship | |
19 | Table/Structure Field | AFAB - SSABZ | Latest start time of the relationship | |
20 | Table/Structure Field | AFAB - ZEINH | Unit for the time interval between relationships | |
21 | Table/Structure Field | AFABD - AOBAR | Type of relationship | |
22 | Table/Structure Field | AFABD - APLZL_NCH | Internal counter | |
23 | Table/Structure Field | AFABD - APLZL_VOR | Internal counter | |
24 | Table/Structure Field | AFABD - AUFPL_NCH | No. identifying the network to which the successor belongs | |
25 | Table/Structure Field | AFABD - AUFPL_VOR | No. identifying the network to which the predecessor belongs | |
26 | Table/Structure Field | AFABD - DAUERMAX | Maximum time interval for relationship | |
27 | Table/Structure Field | AFABD - DAUTM | Relationship duration (in seconds) as result of scheduling | |
28 | Table/Structure Field | AFABD - FEABD | Earliest finish date for the relationship | |
29 | Table/Structure Field | AFABD - FEABZ | Earliest finish time for the relationship | |
30 | Table/Structure Field | AFABD - FSABD | Earliest start date for the relationship | |
31 | Table/Structure Field | AFABD - FSABZ | Earliest start time for the relationship | |
32 | Table/Structure Field | AFABD - NETZPL_NCH | Network number | |
33 | Table/Structure Field | AFABD - NETZPL_VOR | Network number | |
34 | Table/Structure Field | AFABD - PROVG | Key for defining time intervals in a relationship | |
35 | Table/Structure Field | AFABD - SEABD | Latest finish date of the relationship | |
36 | Table/Structure Field | AFABD - SEABZ | Latest finish time of the relationship | |
37 | Table/Structure Field | AFABD - SSABD | Latest start date of the relationship | |
38 | Table/Structure Field | AFABD - SSABZ | Latest start time of the relationship | |
39 | Table/Structure Field | AFABD - VORN1 | Operation/Activity Number | |
40 | Table/Structure Field | AFABD - VORN2 | Operation/Activity Number | |
41 | Table/Structure Field | AFABD - ZEINH | Unit for the time interval between relationships | |
42 | Table/Structure Field | AFAB_INC - DAUER | Time interval between relationships | |
43 | Table/Structure Field | AFAB_INC - DAUERMAX | Maximum time interval for relationship | |
44 | Table/Structure Field | AFAB_INC - DAUKZ | Indicator for the duration of the relationship | |
45 | Table/Structure Field | AFAB_INC - DAUTM | Relationship duration (in seconds) as result of scheduling | |
46 | Table/Structure Field | AFAB_INC - FEABD | Earliest finish date for the relationship | |
47 | Table/Structure Field | AFAB_INC - FEABZ | Earliest finish time for the relationship | |
48 | Table/Structure Field | AFAB_INC - FSABD | Earliest start date for the relationship | |
49 | Table/Structure Field | AFAB_INC - FSABZ | Earliest start time for the relationship | |
50 | Table/Structure Field | AFAB_INC - PROVG | Key for defining time intervals in a relationship | |
51 | Table/Structure Field | AFAB_INC - SEABD | Latest finish date of the relationship | |
52 | Table/Structure Field | AFAB_INC - SEABZ | Latest finish time of the relationship | |
53 | Table/Structure Field | AFAB_INC - SSABD | Latest start date of the relationship | |
54 | Table/Structure Field | AFAB_INC - SSABZ | Latest start time of the relationship | |
55 | Table/Structure Field | AFAB_INC - ZEINH | Unit for the time interval between relationships | |
56 | Table/Structure Field | AFFL - PLNFL | Sequence | |
57 | Table/Structure Field | AFFL_INC - PLNFL | Sequence | |
58 | Table/Structure Field | AFPO - PLNUM | Planned order number | |
59 | Table/Structure Field | AFPO - PWERK | Planning plant for the order | |
60 | Table/Structure Field | AFPOD - PLNUM | Planned order number | |
61 | Table/Structure Field | AFPOD - PWERK | Planning plant for the order | |
62 | Table/Structure Field | AFPOD - SOPNR | SOP order number | |
63 | Table/Structure Field | AFPO_INC - PLNUM | Planned order number | |
64 | Table/Structure Field | AFPO_INC - PWERK | Planning plant for the order | |
65 | Table/Structure Field | AFVC - FRSP | Earliest possible activity / Latest possible activity | |
66 | Table/Structure Field | AFVGD - APLFL | Sequence | |
67 | Table/Structure Field | AFVGD - APLZL | General counter for order | |
68 | Table/Structure Field | AFVGD - ARUZE | Unit of measure for teardown | |
69 | Table/Structure Field | AFVGD - ASKUM | Cumulative Scrap Qty of Subsequent Reporting Pts (Cur. Per.) | |
70 | Table/Structure Field | AFVGD - ASVRG | Operation scrap | |
71 | Table/Structure Field | AFVGD - AUFPL | Routing number of operations in the order | |
72 | Table/Structure Field | AFVGD - BEARP | Processing time (forecast) | |
73 | Table/Structure Field | AFVGD - BEAZE | Unit of measure for processing time | |
74 | Table/Structure Field | AFVGD - BEAZP | Unit of processing time (Forecast) | |
75 | Table/Structure Field | AFVGD - FRSP | Earliest possible activity / Latest possible activity | |
76 | Table/Structure Field | AFVGD - FSAVD | Earliest scheduled start: Execution (date) | |
77 | Table/Structure Field | AFVGD - FSAVZ | Earliest scheduled start: Execution (time) | |
78 | Table/Structure Field | AFVGD - FSEDZ | Earliest scheduled finish: Execution (time) | |
79 | Table/Structure Field | AFVGD - FSELZ | Earliest scheduled finish: Wait (time) | |
80 | Table/Structure Field | AFVGD - INDBT | Field defined as in SY-TABIX | |
81 | Table/Structure Field | AFVGD - LIGZE | Unit of measure for wait time | |
82 | Table/Structure Field | AFVGD - LOSME | Base Unit of Measure | |
83 | Table/Structure Field | AFVGD - LOSVG | Operation quantity in order unit of measure | |
84 | Table/Structure Field | AFVGD - MGVRG | Operation Quantity | |
85 | Table/Structure Field | AFVGD - PUFFP | Free float (from forecast) | |
86 | Table/Structure Field | AFVGD - PUFFR | Free float | |
87 | Table/Structure Field | AFVGD - PUFGP | Total float (from forecast) | |
88 | Table/Structure Field | AFVGD - PUFGS | Total float | |
89 | Table/Structure Field | AFVGD - RSTUF | Reduction level which reduces operation lead time | |
90 | Table/Structure Field | AFVGD - RSTZE | Unit of measure for setup time | |
91 | Table/Structure Field | AFVGD - SPANZ | Actual number of splits | |
92 | Table/Structure Field | AFVGD - SSAVZ | Latest scheduled start: Execution (time) | |
93 | Table/Structure Field | AFVGD - SSEDZ | Latest scheduled finish: Execution (time) | |
94 | Table/Structure Field | AFVGD - SSELZ | Latest scheduled finish: Wait time | |
95 | Table/Structure Field | AFVGD - TRAZE | Unit of measure for move time | |
96 | Table/Structure Field | AFVGD - VORNR | Operation/Activity Number | |
97 | Table/Structure Field | AFVGD - WRTZE | Unit of measure for queue time | |
98 | Table/Structure Field | AFVGI - APLFL | Sequence | |
99 | Table/Structure Field | AFVGI - FRSP | Earliest possible activity / Latest possible activity | |
100 | Table/Structure Field | AFVGI - RSTUF | Reduction level which reduces operation lead time | |
101 | Table/Structure Field | AFVGI - SPANZ | Actual number of splits | |
102 | Table/Structure Field | AFVGI - VORNR | Operation/Activity Number | |
103 | Table/Structure Field | AFVKI - APLZL | General counter for order | |
104 | Table/Structure Field | AFVKI - AUFPL | Routing number of operations in the order | |
105 | Table/Structure Field | AFVVI - ARUZE | Unit of measure for teardown | |
106 | Table/Structure Field | AFVVI - ASVRG | Operation scrap | |
107 | Table/Structure Field | AFVVI - BEARP | Processing time (forecast) | |
108 | Table/Structure Field | AFVVI - BEAZE | Unit of measure for processing time | |
109 | Table/Structure Field | AFVVI - BEAZP | Unit of processing time (Forecast) | |
110 | Table/Structure Field | AFVVI - FSAVD | Earliest scheduled start: Execution (date) | |
111 | Table/Structure Field | AFVVI - FSAVZ | Earliest scheduled start: Execution (time) | |
112 | Table/Structure Field | AFVVI - FSEDZ | Earliest scheduled finish: Execution (time) | |
113 | Table/Structure Field | AFVVI - FSELZ | Earliest scheduled finish: Wait (time) | |
114 | Table/Structure Field | AFVVI - LIGZE | Unit of measure for wait time | |
115 | Table/Structure Field | AFVVI - MGVRG | Operation Quantity | |
116 | Table/Structure Field | AFVVI - PUFFP | Free float (from forecast) | |
117 | Table/Structure Field | AFVVI - PUFFR | Free float | |
118 | Table/Structure Field | AFVVI - PUFGP | Total float (from forecast) | |
119 | Table/Structure Field | AFVVI - PUFGS | Total float | |
120 | Table/Structure Field | AFVVI - RSTZE | Unit of measure for setup time | |
121 | Table/Structure Field | AFVVI - SSAVZ | Latest scheduled start: Execution (time) | |
122 | Table/Structure Field | AFVVI - SSEDZ | Latest scheduled finish: Execution (time) | |
123 | Table/Structure Field | AFVVI - SSELZ | Latest scheduled finish: Wait time | |
124 | Table/Structure Field | AFVVI - TRAZE | Unit of measure for move time | |
125 | Table/Structure Field | AFVVI - WRTZE | Unit of measure for queue time | |
126 | Table/Structure Field | CAUFVD - APLZT | General counter for order | |
127 | Table/Structure Field | CAUFVD - AUART | Order Type | |
128 | Table/Structure Field | CAUFVD - AUFLD | Date of BOM Explosion/Routing Transfer | |
129 | Table/Structure Field | CAUFVD - AUFNR | Order Number | |
130 | Table/Structure Field | CAUFVD - AUFPL | Routing number of operations in the order | |
131 | Table/Structure Field | CAUFVD - AUFPT | Routing number of operations in the order | |
132 | Table/Structure Field | CAUFVD - AUTYP | Order category | |
133 | Table/Structure Field | CAUFVD - BREAKS | Indicator: Scheduling allowing for breaks | |
134 | Table/Structure Field | CAUFVD - CFB_BBDPI | Best-Before Date (BBD)/ Shelf Life Expiration Date (SLED) | |
135 | Table/Structure Field | CAUFVD - CFB_DATOFM | Date of Manufacture | |
136 | Table/Structure Field | CAUFVD - CFB_LZEIH | Unit for maximum storage period | |
137 | Table/Structure Field | CAUFVD - CFB_MAXLZ | Maximum storage period | |
138 | Table/Structure Field | CAUFVD - CUOBJ | Configuration (internal object number) | |
139 | Table/Structure Field | CAUFVD - DISPO | MRP controller for the order | |
140 | Table/Structure Field | CAUFVD - EXT_AUFNR | Order Number | |
141 | Table/Structure Field | CAUFVD - FEVOR | Production Supervisor | |
142 | Table/Structure Field | CAUFVD - FLG_TRME | Indicator: Scheduling is carried out at least once | |
143 | Table/Structure Field | CAUFVD - FREIZ | Release period (in days) | |
144 | Table/Structure Field | CAUFVD - FTRMS | Scheduled release date | |
145 | Table/Structure Field | CAUFVD - FTRPS | Scheduled release date (forecast) | |
146 | Table/Structure Field | CAUFVD - GAMNG | Total order quantity | |
147 | Table/Structure Field | CAUFVD - GASMG | Total scrap quantity in the order | |
148 | Table/Structure Field | CAUFVD - GLTPP | Finish date (forecast) | |
149 | Table/Structure Field | CAUFVD - GLTPS | Scheduled forecast finish | |
150 | Table/Structure Field | CAUFVD - GLTRP | Basic finish date | |
151 | Table/Structure Field | CAUFVD - GLTRS | Scheduled finish | |
152 | Table/Structure Field | CAUFVD - GLUPP | Forecast finish (time) | |
153 | Table/Structure Field | CAUFVD - GLUPS | Scheduled forecast finish time | |
154 | Table/Structure Field | CAUFVD - GLUZP | Basic finish (time) | |
155 | Table/Structure Field | CAUFVD - GLUZS | Scheduled finish time | |
156 | Table/Structure Field | CAUFVD - GMEIN | Common unit of measure for all order items | |
157 | Table/Structure Field | CAUFVD - GSTPP | Forecast start date | |
158 | Table/Structure Field | CAUFVD - GSTPS | Scheduled forecast start | |
159 | Table/Structure Field | CAUFVD - GSTRP | Basic start date | |
160 | Table/Structure Field | CAUFVD - GSTRS | Scheduled start | |
161 | Table/Structure Field | CAUFVD - GSUPP | Forecast start (time) | |
162 | Table/Structure Field | CAUFVD - GSUPS | Scheduled start time (Forecast) | |
163 | Table/Structure Field | CAUFVD - GSUZP | Basic start time | |
164 | Table/Structure Field | CAUFVD - GSUZS | Scheduled Start (Time) | |
165 | Table/Structure Field | CAUFVD - INDBT | Field defined as in SY-TABIX | |
166 | Table/Structure Field | CAUFVD - KAPVERSA | Version of Available Capacity | |
167 | Table/Structure Field | CAUFVD - LOSGR | Costing lot size | |
168 | Table/Structure Field | CAUFVD - MATNR | Material Number for Order | |
169 | Table/Structure Field | CAUFVD - OBJNR | Object number | |
170 | Table/Structure Field | CAUFVD - PLART | Basis for scheduling | |
171 | Table/Structure Field | CAUFVD - PLNAL | Group Counter | |
172 | Table/Structure Field | CAUFVD - PLNME | Task list unit of measure | |
173 | Table/Structure Field | CAUFVD - PLNNR | Key for Task List Group | |
174 | Table/Structure Field | CAUFVD - PLNTY | Task List Type | |
175 | Table/Structure Field | CAUFVD - PNETENDD | Outline finish of collective order (date) | |
176 | Table/Structure Field | CAUFVD - PNETENDT | Outline finish time | |
177 | Table/Structure Field | CAUFVD - PNETSTARTD | Outline start of collective network (date) | |
178 | Table/Structure Field | CAUFVD - PNETSTARTT | Start time of a collective order | |
179 | Table/Structure Field | CAUFVD - RDKZP | Reduction indicator for scheduling (forecast) | |
180 | Table/Structure Field | CAUFVD - REDKZ | Reduction indicator for scheduling | |
181 | Table/Structure Field | CAUFVD - SFCPF | Production Scheduling Profile | |
182 | Table/Structure Field | CAUFVD - SICHZ | Float after production (in days) | |
183 | Table/Structure Field | CAUFVD - SICHZ_TRM | Scheduled float after production in days | |
184 | Table/Structure Field | CAUFVD - TERHW | Scheduling note from order scheduling | |
185 | Table/Structure Field | CAUFVD - TMBAS | Set of dates for network | |
186 | Table/Structure Field | CAUFVD - TRMDT | Date of the last scheduling | |
187 | Table/Structure Field | CAUFVD - TYPKZ | Type of object causing the load (order category) | |
188 | Table/Structure Field | CAUFVD - UPTER | Indicator: Change to Scheduled Dates | |
189 | Table/Structure Field | CAUFVD - VORGZ | Float before production (in days) | |
190 | Table/Structure Field | CAUFVD - VORGZ_TRM | Scheduled float before production in days | |
191 | Table/Structure Field | CAUFVD - WERKS | Plant | |
192 | Table/Structure Field | CAUFVTAB - APLZT | General counter for order | |
193 | Table/Structure Field | CAUFVTAB - AUART | Order Type | |
194 | Table/Structure Field | CAUFVTAB - AUFLD | Date of BOM Explosion/Routing Transfer | |
195 | Table/Structure Field | CAUFVTAB - AUFNR | Order Number | |
196 | Table/Structure Field | CAUFVTAB - AUFPL | Routing number of operations in the order | |
197 | Table/Structure Field | CAUFVTAB - AUFPT | Routing number of operations in the order | |
198 | Table/Structure Field | CAUFVTAB - AUTYP | Order category | |
199 | Table/Structure Field | CAUFVTAB - BREAKS | Indicator: Scheduling allowing for breaks | |
200 | Table/Structure Field | CAUFVTAB - CFB_BBDPI | Best-Before Date (BBD)/ Shelf Life Expiration Date (SLED) | |
201 | Table/Structure Field | CAUFVTAB - CFB_DATOFM | Date of Manufacture | |
202 | Table/Structure Field | CAUFVTAB - CFB_LZEIH | Unit for maximum storage period | |
203 | Table/Structure Field | CAUFVTAB - CFB_MAXLZ | Maximum storage period | |
204 | Table/Structure Field | CAUFVTAB - CUOBJ | Configuration (internal object number) | |
205 | Table/Structure Field | CAUFVTAB - DISPO | MRP controller for the order | |
206 | Table/Structure Field | CAUFVTAB - FEVOR | Production Supervisor | |
207 | Table/Structure Field | CAUFVTAB - FREIZ | Release period (in days) | |
208 | Table/Structure Field | CAUFVTAB - FTRMS | Scheduled release date | |
209 | Table/Structure Field | CAUFVTAB - FTRPS | Scheduled release date (forecast) | |
210 | Table/Structure Field | CAUFVTAB - GAMNG | Total order quantity | |
211 | Table/Structure Field | CAUFVTAB - GASMG | Total scrap quantity in the order | |
212 | Table/Structure Field | CAUFVTAB - GLTPP | Finish date (forecast) | |
213 | Table/Structure Field | CAUFVTAB - GLTPS | Scheduled forecast finish | |
214 | Table/Structure Field | CAUFVTAB - GLTRP | Basic finish date | |
215 | Table/Structure Field | CAUFVTAB - GLTRS | Scheduled finish | |
216 | Table/Structure Field | CAUFVTAB - GLUPP | Forecast finish (time) | |
217 | Table/Structure Field | CAUFVTAB - GLUPS | Scheduled forecast finish time | |
218 | Table/Structure Field | CAUFVTAB - GLUZP | Basic finish (time) | |
219 | Table/Structure Field | CAUFVTAB - GLUZS | Scheduled finish time | |
220 | Table/Structure Field | CAUFVTAB - GMEIN | Common unit of measure for all order items | |
221 | Table/Structure Field | CAUFVTAB - GSTPP | Forecast start date | |
222 | Table/Structure Field | CAUFVTAB - GSTPS | Scheduled forecast start | |
223 | Table/Structure Field | CAUFVTAB - GSTRP | Basic start date | |
224 | Table/Structure Field | CAUFVTAB - GSTRS | Scheduled start | |
225 | Table/Structure Field | CAUFVTAB - GSUPP | Forecast start (time) | |
226 | Table/Structure Field | CAUFVTAB - GSUPS | Scheduled start time (Forecast) | |
227 | Table/Structure Field | CAUFVTAB - GSUZP | Basic start time | |
228 | Table/Structure Field | CAUFVTAB - GSUZS | Scheduled Start (Time) | |
229 | Table/Structure Field | CAUFVTAB - KAPVERSA | Version of Available Capacity | |
230 | Table/Structure Field | CAUFVTAB - OBJNR | Object number | |
231 | Table/Structure Field | CAUFVTAB - PLART | Basis for scheduling | |
232 | Table/Structure Field | CAUFVTAB - PLNAL | Group Counter | |
233 | Table/Structure Field | CAUFVTAB - PLNME | Task list unit of measure | |
234 | Table/Structure Field | CAUFVTAB - PLNNR | Key for Task List Group | |
235 | Table/Structure Field | CAUFVTAB - PLNTY | Task List Type | |
236 | Table/Structure Field | CAUFVTAB - PNETENDD | Outline finish of collective order (date) | |
237 | Table/Structure Field | CAUFVTAB - PNETENDT | Outline finish time | |
238 | Table/Structure Field | CAUFVTAB - PNETSTARTD | Outline start of collective network (date) | |
239 | Table/Structure Field | CAUFVTAB - PNETSTARTT | Start time of a collective order | |
240 | Table/Structure Field | CAUFVTAB - RDKZP | Reduction indicator for scheduling (forecast) | |
241 | Table/Structure Field | CAUFVTAB - REDKZ | Reduction indicator for scheduling | |
242 | Table/Structure Field | CAUFVTAB - SFCPF | Production Scheduling Profile | |
243 | Table/Structure Field | CAUFVTAB - SICHZ | Float after production (in days) | |
244 | Table/Structure Field | CAUFVTAB - SICHZ_TRM | Scheduled float after production in days | |
245 | Table/Structure Field | CAUFVTAB - TERHW | Scheduling note from order scheduling | |
246 | Table/Structure Field | CAUFVTAB - TRMDT | Date of the last scheduling | |
247 | Table/Structure Field | CAUFVTAB - UPTER | Indicator: Change to Scheduled Dates | |
248 | Table/Structure Field | CAUFVTAB - VORGZ | Float before production (in days) | |
249 | Table/Structure Field | CAUFVTAB - VORGZ_TRM | Scheduled float before production in days | |
250 | Table/Structure Field | CAUFVTAB - WERKS | Plant | |
251 | Table/Structure Field | CFB_BBD_PPPI_DATA - CFB_BBDPI | Best-Before Date (BBD)/ Shelf Life Expiration Date (SLED) | |
252 | Table/Structure Field | CFB_BBD_PPPI_DATA - CFB_DATOFM | Date of Manufacture | |
253 | Table/Structure Field | CFB_BBD_PPPI_DATA - CFB_LZEIH | Unit for maximum storage period | |
254 | Table/Structure Field | CFB_BBD_PPPI_DATA - CFB_MAXLZ | Maximum storage period | |
255 | Table/Structure Field | COAFPOINF - SOPNR | SOP order number | |
256 | Table/Structure Field | COAOBINF - NETZPL_NCH | Network number | |
257 | Table/Structure Field | COAOBINF - NETZPL_VOR | Network number | |
258 | Table/Structure Field | COAOBINF - VORN1 | Operation/Activity Number | |
259 | Table/Structure Field | COAOBINF - VORN2 | Operation/Activity Number | |
260 | Table/Structure Field | COCAUFVINF - FLG_TRME | Indicator: Scheduling is carried out at least once | |
261 | Table/Structure Field | COCAUFVINF - INDBT | Field defined as in SY-TABIX | |
262 | Table/Structure Field | COCAUFVINF - LOSGR | Costing lot size | |
263 | Table/Structure Field | COCAUFVINF - MATNR | Material Number for Order | |
264 | Table/Structure Field | COCAUFVINF - TMBAS | Set of dates for network | |
265 | Table/Structure Field | COCAUFVINF - TYPKZ | Type of object causing the load (order category) | |
266 | Table/Structure Field | COOPRINF - ASKUM | Cumulative Scrap Qty of Subsequent Reporting Pts (Cur. Per.) | |
267 | Table/Structure Field | COOPRINF - INDBT | Field defined as in SY-TABIX | |
268 | Table/Structure Field | COOPRINF - LOSME | Base Unit of Measure | |
269 | Table/Structure Field | COOPRINF - LOSVG | Operation quantity in order unit of measure | |
270 | Table/Structure Field | COVERSINF - EXT_AUFNR | Order Number | |
271 | Table/Structure Field | CXAFAB_V - APLZL_NCH | Internal counter | |
272 | Table/Structure Field | CXAFAB_V - APLZL_VOR | Internal counter | |
273 | Table/Structure Field | CXAFAB_V - AUFPL_NCH | No. identifying the network to which the successor belongs | |
274 | Table/Structure Field | CXAFAB_V - AUFPL_VOR | No. identifying the network to which the predecessor belongs | |
275 | Table/Structure Field | CXAFAB_V - DAUER | Time interval between relationships | |
276 | Table/Structure Field | CXAFAB_V - ZEINH | Unit for the time interval between relationships | |
277 | Table/Structure Field | CXAFVG_V1 - FLIES | Indicator: continuous flow production | |
278 | Table/Structure Field | CXAFVG_V1 - UEKAN | Optional overlapping | |
279 | Table/Structure Field | CXAFVG_V1 - UEMUS | Required overlapping | |
280 | Table/Structure Field | CXZEIT - ABRUEST | Teardown time | |
281 | Table/Structure Field | CXZEIT - ARUZE | Unit of measure for teardown | |
282 | Table/Structure Field | CXZEIT - BEARB | Processing time | |
283 | Table/Structure Field | CXZEIT - BEAZE | Unit of measure for processing time | |
284 | Table/Structure Field | CXZEIT - FSAV | Earliest operation start date | |
285 | Table/Structure Field | CXZEIT - FSED | Earliest finish of execution time | |
286 | Table/Structure Field | CXZEIT - FSEL | Earliest finish of wait time | |
287 | Table/Structure Field | CXZEIT - FSSA | Earliest start for teardown | |
288 | Table/Structure Field | CXZEIT - FSSB | Earliest start for processing | |
289 | Table/Structure Field | CXZEIT - FSSL | Earliest start for wait time | |
290 | Table/Structure Field | CXZEIT - LIEGEN | Wait time | |
291 | Table/Structure Field | CXZEIT - LIGZE | Unit of measure for wait time | |
292 | Table/Structure Field | CXZEIT - RSTZE | Unit of measure for setup time | |
293 | Table/Structure Field | CXZEIT - RUEST | Setup time | |
294 | Table/Structure Field | CXZEIT - SPANZ | Actual number of splits | |
295 | Table/Structure Field | CXZEIT - SSAV | Latest start date of operation | |
296 | Table/Structure Field | CXZEIT - SSED | Latest finish of execution | |
297 | Table/Structure Field | CXZEIT - SSEL | Latest finish of wait time | |
298 | Table/Structure Field | CXZEIT - SSSA | Latest start date for teardown | |
299 | Table/Structure Field | CXZEIT - SSSB | Latest start for processing | |
300 | Table/Structure Field | CXZEIT - SSSL | Latest start date for wait time | |
301 | Table/Structure Field | CXZEIT - TRANSP | Move time | |
302 | Table/Structure Field | CXZEIT - TRAZE | Unit of measure for move time | |
303 | Table/Structure Field | CXZEIT - WARTEN | Queue time | |
304 | Table/Structure Field | CXZEIT - WRTZE | Unit of measure for queue time | |
305 | Table/Structure Field | CX_MARC - BASMG | Base quantity | |
306 | Table/Structure Field | CX_MARC - BEARZ | Processing time | |
307 | Table/Structure Field | CX_MARC - DZEIT | In-house production time | |
308 | Table/Structure Field | CX_MARC - FEVOR | Production Supervisor | |
309 | Table/Structure Field | CX_MARC - FHORI | Scheduling Margin Key for Floats | |
310 | Table/Structure Field | CX_MARC - MATNR | Material Number | |
311 | Table/Structure Field | CX_MARC - RUEZT | Setup and teardown time | |
312 | Table/Structure Field | CX_MARC - TRANZ | Interoperation time | |
313 | Table/Structure Field | CX_MARC - WERKS | Plant | |
314 | Table/Structure Field | EMARC - BASMG | Base quantity | |
315 | Table/Structure Field | EMARC - BEARZ | Processing time | |
316 | Table/Structure Field | EMARC - DZEIT | In-house production time | |
317 | Table/Structure Field | EMARC - FEVOR | Production Supervisor | |
318 | Table/Structure Field | EMARC - FHORI | Scheduling Margin Key for Floats | |
319 | Table/Structure Field | EMARC - RUEZT | Setup and teardown time | |
320 | Table/Structure Field | EMARC - TRANZ | Interoperation time | |
321 | Table/Structure Field | EMARC1 - BASMG | Base quantity | |
322 | Table/Structure Field | EMARC1 - BEARZ | Processing time | |
323 | Table/Structure Field | EMARC1 - DZEIT | In-house production time | |
324 | Table/Structure Field | EMARC1 - FEVOR | Production Supervisor | |
325 | Table/Structure Field | EMARC1 - FHORI | Scheduling Margin Key for Floats | |
326 | Table/Structure Field | EMARC1 - RUEZT | Setup and teardown time | |
327 | Table/Structure Field | EMARC1 - TRANZ | Interoperation time | |
328 | Table/Structure Field | INOB - OBTAB | Name of database table for object | |
329 | Table/Structure Field | KAKO - VERSA | Active version of available capacity | |
330 | Table/Structure Field | KBED - APLZL | General counter for order | |
331 | Table/Structure Field | KBED - AUFPL | Routing number of operations in the order | |
332 | Table/Structure Field | KBED - TYPKZ | Type of object causing the load (order category) | |
333 | Table/Structure Field | KBEDD - APLZL | General counter for order | |
334 | Table/Structure Field | KBEDD - AUFPL | Routing number of operations in the order | |
335 | Table/Structure Field | KBEDI - APLZL | General counter for order | |
336 | Table/Structure Field | KBEDI - AUFPL | Routing number of operations in the order | |
337 | Table/Structure Field | KBEDI - TYPKZ | Type of object causing the load (order category) | |
338 | Table/Structure Field | KBKO - BREAKS | Indicator: Scheduling allowing for breaks | |
339 | Table/Structure Field | KBKO - GLTRS | Scheduled finish | |
340 | Table/Structure Field | KBKO - GLUZS | Earliest finish of operation (time) | |
341 | Table/Structure Field | KBKO - GSTRS | Scheduled start | |
342 | Table/Structure Field | KBKO - GSUZS | Earliest scheduled start: Execution (time) | |
343 | Table/Structure Field | KBKO - PLAUF | Date for routing transfer | |
344 | Table/Structure Field | KBKO - PLNAL | Group Counter | |
345 | Table/Structure Field | KBKO - PLNNR | Key for Task List Group | |
346 | Table/Structure Field | KBKO - PLNTY | Task List Type | |
347 | Table/Structure Field | KBKO - REDKZ | Reduction indicator for scheduling | |
348 | Table/Structure Field | KBKO - TERKZ | Scheduling type | |
349 | Table/Structure Field | KBKO - TRMDT | Date of the last scheduling | |
350 | Table/Structure Field | KBKO - TYPKZ | Type of object causing the load (order category) | |
351 | Table/Structure Field | KBKOI - BREAKS | Indicator: Scheduling allowing for breaks | |
352 | Table/Structure Field | KBKOI - GLTRS | Scheduled finish | |
353 | Table/Structure Field | KBKOI - GLUZS | Earliest finish of operation (time) | |
354 | Table/Structure Field | KBKOI - GSTRS | Scheduled start | |
355 | Table/Structure Field | KBKOI - GSUZS | Earliest scheduled start: Execution (time) | |
356 | Table/Structure Field | KBKOI - PLAUF | Date for routing transfer | |
357 | Table/Structure Field | KBKOI - PLNAL | Group Counter | |
358 | Table/Structure Field | KBKOI - PLNNR | Key for Task List Group | |
359 | Table/Structure Field | KBKOI - PLNTY | Task List Type | |
360 | Table/Structure Field | KBKOI - REDKZ | Reduction indicator for scheduling | |
361 | Table/Structure Field | KBKOI - TERKZ | Scheduling type | |
362 | Table/Structure Field | KBKOI - TRMDT | Date of the last scheduling | |
363 | Table/Structure Field | KBKOI - TYPKZ | Type of object causing the load (order category) | |
364 | Table/Structure Field | MARC - BASMG | Base quantity | |
365 | Table/Structure Field | MARC - BEARZ | Processing time | |
366 | Table/Structure Field | MARC - DZEIT | In-house production time | |
367 | Table/Structure Field | MARC - FEVOR | Production Supervisor | |
368 | Table/Structure Field | MARC - FHORI | Scheduling Margin Key for Floats | |
369 | Table/Structure Field | MARC - MATNR | Material Number | |
370 | Table/Structure Field | MARC - RUEZT | Setup and teardown time | |
371 | Table/Structure Field | MARC - TRANZ | Interoperation time | |
372 | Table/Structure Field | MARC - WERKS | Plant | |
373 | Table/Structure Field | MDCPUTIME - EINZT | MRP run: Time for evaluating the operating time | |
374 | Table/Structure Field | MDSTATS - EINZT | MRP run: Time for evaluating the operating time | |
375 | Table/Structure Field | PLAF - PLNUM | Planned order number | |
376 | Table/Structure Field | PLSC - PLSCN | Planning Scenario of Long-Term Planning | |
377 | Table/Structure Field | PRTE - PENDE | WBS element: Basic finish date | |
378 | Table/Structure Field | PRTE - PETRM | Scheduled finish (Basic) | |
379 | Table/Structure Field | PRTE - POSNR | WBS Element | |
380 | Table/Structure Field | PRTE - PSTRM | Scheduled start (Basic) | |
381 | Table/Structure Field | PRTE - PSTRT | WBS element: Basic start date | |
382 | Table/Structure Field | PRTEB - PENDE | WBS element: Basic finish date | |
383 | Table/Structure Field | PRTEB - PETRM | Scheduled finish (Basic) | |
384 | Table/Structure Field | PRTEB - POSNR | WBS Element | |
385 | Table/Structure Field | PRTEB - PSTRM | Scheduled start (Basic) | |
386 | Table/Structure Field | PRTEB - PSTRT | WBS element: Basic start date | |
387 | Table/Structure Field | PRTEINC - PENDE | WBS element: Basic finish date | |
388 | Table/Structure Field | PRTEINC - PETRM | Scheduled finish (Basic) | |
389 | Table/Structure Field | PRTEINC - PSTRM | Scheduled start (Basic) | |
390 | Table/Structure Field | PRTEINC - PSTRT | WBS element: Basic start date | |
391 | Table/Structure Field | RCLST - OBJECT | Data objects of a task list | |
392 | Table/Structure Field | SAUF - SAFNR | SOP order number | |
393 | Table/Structure Field | SCAL - DATE | Date for public holiday and factory calendars | |
394 | Table/Structure Field | SYST - DATLO | ABAP System Field: Local Date of Current User | |
395 | Table/Structure Field | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | |
396 | Table/Structure Field | SYST - UZEIT | ABAP System Field: Current Time of Application Server | |
397 | Table/Structure Field | T001W - FABKL | Factory calendar key | |
398 | Table/Structure Field | T006 - MSEHI | Unit of Measurement | |
399 | Table/Structure Field | T430 - TERM | Indicator: Scheduling | |
400 | Table/Structure Field | T482 - ECK_UHRZT | Basic dates with time of day | |
401 | Table/Structure Field | T482 - RUEKT | Backward scheduling | |
402 | Table/Structure Field | T482 - TERMKZ | Scheduling type | |
403 | Table/Structure Field | T482 - VORWT | Forward scheduling | |
404 | Table/Structure Field | TCX00 - AUFTA | Order type in capacity planning | |
405 | Table/Structure Field | TCX00 - DADJ2 | Adjust dates in lead time scheduling | |
406 | Table/Structure Field | TCX00 - RED_ART | Reduction type | |
407 | Table/Structure Field | TCX00 - VAGRP | Production Supervisor | |
408 | Table/Structure Field | TCX00 - WERKS | Plant | |
409 | Table/Structure Field | TJ01 - VRGNG | Business Transaction |