Table/Structure Field list used by SAP ABAP Program LCXTKF10 (Include LCUVFF04)
SAP ABAP Program
LCXTKF10 (Include LCUVFF04) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AFVGD - ARBID | Object ID of the resource | ||
| 2 | AFVGD - ARBPL | Work center | ||
| 3 | AFVGD - INDBT | Field defined as in SY-TABIX | ||
| 4 | AFVGD - KALID | Factory Calendar | ||
| 5 | AFVGD - MGVRG | Operation Quantity | ||
| 6 | AFVGD - MINWE | Minimum Send-Ahead Quantity | ||
| 7 | AFVGD - OBJNR | Object number | ||
| 8 | AFVGI - ARBID | Object ID of the resource | ||
| 9 | AFVGI - KALID | Factory Calendar | ||
| 10 | AFVGI - OBJNR | Object number | ||
| 11 | AFVVI - MGVRG | Operation Quantity | ||
| 12 | AFVVI - MINWE | Minimum Send-Ahead Quantity | ||
| 13 | CAUFVD - AUTYP | Order category | ||
| 14 | CAUFVD - TMBAS | Set of dates for network | ||
| 15 | CAUFVTAB - AUTYP | Order category | ||
| 16 | CMIMSG - MSGNR | Message number | ||
| 17 | COCAUFVINF - TMBAS | Set of dates for network | ||
| 18 | COOPRINF - ARBPL | Work center | ||
| 19 | COOPRINF - INDBT | Field defined as in SY-TABIX | ||
| 20 | CRCA - CAP_BACKFLUSH_PR | Control: Calc. of Remaining Req./Duration After Confirmation | ||
| 21 | CRCA - CAP_BACKFLUSH_SU | Control: Calc. of Remaining Req./Duration After Confirmation | ||
| 22 | CRCA - CAP_BACKFLUSH_TD | Control: Calc. of Remaining Req./Duration After Confirmation | ||
| 23 | CRCA - KAPID | Capacity ID | ||
| 24 | CRHD - KAPID | Capacity ID | ||
| 25 | CRHD - OBJID | Object ID of the resource | ||
| 26 | CRHD - ZEIWM | Unit for the minumum queue time | ||
| 27 | CRHD - ZEIWN | Unit for the standard queue time | ||
| 28 | CRHD - ZWMIN | Minimum queue time | ||
| 29 | CRHD - ZWNOR | Standard queue time | ||
| 30 | CXAFVG_V1 - ABLIPKZ | Indicator: simultaneous teardown and wait | ||
| 31 | CXAFVG_V1 - ARBID | Object ID of the resource | ||
| 32 | CXAFVG_V1 - IEBD | Actual finish: Processing (date) | ||
| 33 | CXAFVG_V1 - IEBZ | Actual processing finish (time) | ||
| 34 | CXAFVG_V1 - IEDD | Actual finish: Execution (date) | ||
| 35 | CXAFVG_V1 - IEDZ | Actual finish: Execution (time) | ||
| 36 | CXAFVG_V1 - IERD | Actual finish: Setup (date) | ||
| 37 | CXAFVG_V1 - IERZ | Actual finish: Setup (time) | ||
| 38 | CXAFVG_V1 - INDBT | Field defined as in SY-TABIX | ||
| 39 | CXAFVG_V1 - ISAD | Actual start: Teardown (date) | ||
| 40 | CXAFVG_V1 - ISAZ | Actual start: Teardown (time) | ||
| 41 | CXAFVG_V1 - ISBD | Actual start: Processing (date) | ||
| 42 | CXAFVG_V1 - ISBZ | Actual start: Processing (time) | ||
| 43 | CXAFVG_V1 - ISDD | Actual start: Execution (date) | ||
| 44 | CXAFVG_V1 - ISDZ | Actual start: Execution/setup (time) | ||
| 45 | CXAFVG_V1 - KALID | Factory Calendar | ||
| 46 | CXAFVG_V1 - LIGZE | Unit of measure for wait time | ||
| 47 | CXAFVG_V1 - MEINH | Unit of measure for activity | ||
| 48 | CXAFVG_V1 - MGVRG | Operation Quantity | ||
| 49 | CXAFVG_V1 - MINWE | Minimum Send-Ahead Quantity | ||
| 50 | CXAFVG_V1 - PEDD | Forecast finish date of operation from confirmation | ||
| 51 | CXAFVG_V1 - PEDZ | Forecast finish time of operation from confirmation | ||
| 52 | CXAFVG_V1 - PLIFZ | Planned delivery time in days | ||
| 53 | CXAFVG_V1 - SPANZ | Actual number of splits | ||
| 54 | CXAFVG_V1 - SPLIM | Maximum number of splits | ||
| 55 | CXAFVG_V1 - SPMUS | Required splitting | ||
| 56 | CXAFVG_V1 - STEUS | Control key | ||
| 57 | CXAFVG_V1 - TAKT | takt within a line segment | ||
| 58 | CXAFVG_V1 - UEMUS | Required overlapping | ||
| 59 | CXAFVG_V1 - WERKS | Plant | ||
| 60 | CXAFVG_V1 - ZEILP | Unit for the required wait time | ||
| 61 | CXAFVG_V1 - ZEIMB | Unit for the minimum processing time | ||
| 62 | CXAFVG_V1 - ZEIWM | Unit for the minumum queue time | ||
| 63 | CXAFVG_V1 - ZEIWN | Unit for the standard queue time | ||
| 64 | CXAFVG_V1 - ZLPRO | Minimum wait time | ||
| 65 | CXAFVG_V1 - ZMINB | Minimum processing time | ||
| 66 | CXAFVG_V1 - ZWMIN | Minimum queue time | ||
| 67 | CXAFVG_V1 - ZWNOR | Standard queue time | ||
| 68 | CXAFVG_V2 - ARBID | Object ID of the resource | ||
| 69 | CXAFVG_V2 - BEAZE | Unit of measure for processing time | ||
| 70 | CXAFVG_V2 - DAUME | Unit for the minimum duration | ||
| 71 | CXAFVG_V2 - DAUMI | Minimum activity duration | ||
| 72 | CXAFVG_V2 - DAUNE | Normal duration/unit | ||
| 73 | CXAFVG_V2 - DAUNO | Normal duration of the activity | ||
| 74 | CXAFVG_V2 - IEDD | Actual finish: Execution (date) | ||
| 75 | CXAFVG_V2 - IEDZ | Actual finish: Execution (time) | ||
| 76 | CXAFVG_V2 - INDBT | Field defined as in SY-TABIX | ||
| 77 | CXAFVG_V2 - ISDD | Actual start: Execution (date) | ||
| 78 | CXAFVG_V2 - ISDZ | Actual start: Execution/setup (time) | ||
| 79 | CXAFVG_V2 - PDAE | Unit of the forecasted duration from the confirmation | ||
| 80 | CXAFVG_V2 - PDAU | Forecasted duration of activity from confirmation | ||
| 81 | CXAFVG_V2 - PEDD | Forecast finish date of operation from confirmation | ||
| 82 | CXAFVG_V2 - PEDZ | Forecast finish time of operation from confirmation | ||
| 83 | CXZEIT - ABRUEST | Teardown time | ||
| 84 | CXZEIT - ARUZE | Unit of measure for teardown | ||
| 85 | CXZEIT - BEARB | Processing time | ||
| 86 | CXZEIT - BEAZE | Unit of measure for processing time | ||
| 87 | CXZEIT - FSAV | Earliest operation start date | ||
| 88 | CXZEIT - FSED | Earliest finish of execution time | ||
| 89 | CXZEIT - FSEL | Earliest finish of wait time | ||
| 90 | CXZEIT - FSSA | Earliest start for teardown | ||
| 91 | CXZEIT - FSSB | Earliest start for processing | ||
| 92 | CXZEIT - FSSL | Earliest start for wait time | ||
| 93 | CXZEIT - LIEGEN | Wait time | ||
| 94 | CXZEIT - LIGZE | Unit of measure for wait time | ||
| 95 | CXZEIT - RSTZE | Unit of measure for setup time | ||
| 96 | CXZEIT - RUEST | Setup time | ||
| 97 | CXZEIT - SPANZ | Actual number of splits | ||
| 98 | CXZEIT - SSAV | Latest start date of operation | ||
| 99 | CXZEIT - SSED | Latest finish of execution | ||
| 100 | CXZEIT - SSEL | Latest finish of wait time | ||
| 101 | CXZEIT - SSSA | Latest start date for teardown | ||
| 102 | CXZEIT - SSSB | Latest start for processing | ||
| 103 | CXZEIT - SSSL | Latest start date for wait time | ||
| 104 | CXZEIT - WARTEN | Queue time | ||
| 105 | CXZEIT - WRTZE | Unit of measure for queue time | ||
| 106 | CYKBEDQUAN - SPLIT | Split number | ||
| 107 | JEST - STAT | Object status | ||
| 108 | KAKO - KAPID | Capacity ID | ||
| 109 | KAKO - MEINS | Base Unit of Measurement for Capacity | ||
| 110 | KAKO - VERSA | Active version of available capacity | ||
| 111 | KAPA - ANZHL | Number of individual capacities | ||
| 112 | KBED - KAPID | Capacity ID | ||
| 113 | KBED - SPLIT | Split number | ||
| 114 | KBEDD - SPLIT | Split number | ||
| 115 | KBEDI - KAPID | Capacity ID | ||
| 116 | KBEDI - SPLIT | Split number | ||
| 117 | LDLPD - TAKT | takt within a line segment | ||
| 118 | MARA - MATNR | Material Number | ||
| 119 | PCHDY - OBJID | Object ID | ||
| 120 | PLPO - ARBID | Object ID | ||
| 121 | RCLST - OBJECT | Data objects of a task list | ||
| 122 | RCROP - MGVRG | Operation Quantity | ||
| 123 | RCROP - SPLIM | Maximum number of splits | ||
| 124 | SCAL - DATE | Date for public holiday and factory calendars | ||
| 125 | SCAL - FCALID | Factory Calendar | ||
| 126 | SYST - DATUM | ABAP System Field: Current Date of Application Server | ||
| 127 | SYST - MSGID | ABAP System Field: Message ID | ||
| 128 | SYST - MSGNO | ABAP System Field: Message Number | ||
| 129 | SYST - MSGTY | ABAP System Field: Message Type | ||
| 130 | SYST - MSGV1 | ABAP System Field: Message Variable | ||
| 131 | SYST - MSGV2 | ABAP System Field: Message Variable | ||
| 132 | SYST - MSGV3 | ABAP System Field: Message Variable | ||
| 133 | SYST - MSGV4 | ABAP System Field: Message Variable | ||
| 134 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 135 | SYST - UZEIT | ABAP System Field: Current Time of Application Server | ||
| 136 | T001W - FABKL | Factory calendar key | ||
| 137 | T006 - MSEHI | Unit of Measurement | ||
| 138 | T430 - LIEF | External processing | ||
| 139 | T430 - SCHEDEX | Indicator: Scheduling external op. with standard values | ||
| 140 | T430 - STEUS | Control key | ||
| 141 | T499R - RDAUN | Reduction in activity duration (%) | ||
| 142 | T499R - RSPLI | Indicator: Reduction by splitting | ||
| 143 | T499R - RWART | Reduction in queue time (%) |